England and Wales High Court (Administrative Court) Decisions |
||
You are here: BAILII >> Databases >> England and Wales High Court (Administrative Court) Decisions >> St Modwen Developments Ltd v Secretary of State for Communities and Local Government & Anor [2016] EWHC 968 (Admin) (28 April 2016) URL: http://www.bailii.org/ew/cases/EWHC/Admin/2016/968.html Cite as: [2016] EWHC 968 (Admin) |
[New search] [Printable RTF version] [Help]
QUEEN'S BENCH DIVISION
ADMINISTRATIVE COURT
1 Oxford Road, Leeds, LS1 3BG |
||
B e f o r e :
____________________
ST MODWEN DEVELOPMENTS LIMITED |
Claimant |
|
- and - |
||
(1) SECRETARY OF STATE FOR COMMUNITIES AND LOCAL GOVERNMENT |
Defendants |
|
(2) EAST RIDING OF YORKSHIRE COUNCIL |
||
-and- |
____________________
Richard Honey (instructed by the Government Legal Department) for the First Defendant
Paul Tucker QC and Freddie Humphreys (instructed by the solicitor to ERYC) for the Second Defendant
Emma Reid- Chalmers (instructed by direct access) for the Interested Party
Hearing dates: 28 & 29 January 2016
____________________
Crown Copyright ©
MR JUSTICE OUSELEY
The Decision Letter
"18. Although the provision of new homes, including affordable housing, would be an important social and economic benefit, the Secretary of State concludes that granting permission for either of the appeal schemes would be contrary to the Development Plan, so that it is necessary to consider whether there are material considerations sufficient to warrant a decision contrary to that.
19. With regard to Appeal A, the Secretary of State concludes that the benefits of the scheme are significantly and demonstrably outweighed by the adverse impacts including that on the Council's overall spatial strategy for housing, their economic objectives and the portfolio of employment land, and the urbanising impact on North Ferriby. In the case of Appeal B, the Secretary of State concludes that these disbenefits would be compounded by the reduced quantum of housing while the funding for a bridge across a railway line would not be a proportionate or reasonable response to any harm to the supply of employment land."
The Inspector's Report- IR
"As such, providing the proposals were accepted to be a form of sustainable development, the planning balance to be applied would be that permission should be granted unless any adverse impacts of doing so would significantly and demonstrably outweigh the benefits."
Housing Land Requirement and Supply
"13.63. With regard to the five year housing requirement, I consider that the Council's figure of just over 10,000 for the housing market area is to be preferred, on the basis that it accords most closely with the relevant national policy and offers a reasonably robust, full, objective assessment of need. Use of an HMA-based figure should be understood as part of the first stage of formulating the requirement according to national policy rather than the second stage of applying a constraint on the basis of local policy making. The Secretary of State may conclude that the requirement should be based on the ERYC administrative area, in which case the Council's figure of just under 14,000 is to be preferred over the Appellant's figure of 15,300.
13.64. The Appellant's approach to the assessment of housing land supply is fundamentally flawed so that the Council's assessment of supply, at almost 15,000, is also to be preferred. Thus, whether the analysis is based on the HMA or the ERYC area, I consider that the Council has demonstrated the existence of a five year housing land supply. Even if the Appellant's five year housing requirement of 15,300 is taken, the shortfall of 300 would be modest in the context of the overall requirement, making it debatable whether any adverse effect on housing delivery due to supply constraints would be identifiable in practice.
13.65. Since it has not been shown that there is any pressing need for additional sites to come forward to sustain the local supply of housing, I consider that the appeal proposals would not deliver additional benefits by virtue of their contribution to that supply. The contribution of the proposals to the supply of affordable housing is a different matter. Here, significant need has been demonstrated and it seems likely that such need will persist. For that reason, substantial weight should attach to the proposals, in proportion to the extra contribution they would make to the supply of affordable housing."
It is the Inspector's approach to those differences which led to the challenge.
Ground 1: Housing land supply
Issue (a): the meaning of "available now".
"To boost significantly the supply of housing, local planning authorities should:
- use their evidence base to ensure that their local plan meets the full objectively assessed needs for… housing "in the housing market area so far as is consistent with the policies set out in this Framework…";
- local planning authorities were required to identify and update annually a "supply of specific deliverable sites sufficient to provide 5 years' worth of housing against their housing requirements…"
"11. To be considered deliverable, sites should be available now, offer a suitable location for development now, and be achievable with a realistic prospect that housing will be delivered on the site within five years and in particular that development of the site is viable. Sites with planning permission should be considered deliverable until permission expires, unless there is clear evidence that schemes will not be implemented within five years, for example they will not be viable, there is no longer a demand for the type of units or sites have long term phasing plans."
"The approach to allocations in the emerging local plan
13.43. Footnote 11 of NPPF paragraph 47 states that deliverable sites should be available, in a suitable location, achievable and have a realistic prospect of being developed. Further advice is set out at PPG 3.19-23, which suggests various other factors to consider such as impact on surroundings, ownership and viability, all of which are site-specific. Both the Appellant and the Council draw attention to the Wainhomes judgement. From this, it appears there are two key points to note with regard to the interpretation of NPPF paragraph 47: firstly, that whether or not a site is deliverable is fact sensitive; and secondly, that inclusion of a site in an emerging local plan is some evidence of deliverability, since it should normally be assumed that an LPA will make a responsible attempt to comply with national planning policy. Nonetheless, there are other relevant factors including the plan's evidence base, the stage the draft plan has reached and the nature of any objections.
13.44. Pointing to the strong emphasis in NPPF on delivery, the Appellant has taken the position that supply will largely consist of sites with planning permission, putting forward a figure of just over 4,700 as the realistic supply. However if the exercise is to be fact-sensitive as indicated in the Wainhomes judgement, it follows that sites should not be discounted simply on the basis of a general characteristic such as their planning status. Moreover, there is a fundamental lack of credibility in a figure for a period looking five years ahead which fails to acknowledge the likelihood that the Council will grant at least some planning permissions during that period. In this respect, it should be noted that the Appellant's own supply figure has had to be revised upwards by a substantial margin in the relatively short period between the submission of proofs in April 2014 and the holding of the inquiry only a few weeks later, in order to reflect this very fact. The Appellant's approach to deliverability does not achieve the intended aim of providing certainty over the projected five year period.
13.45. On the question of the status of sites without planning permission, the Appellant draws attention to various appeal decisions…In contrast, for the two appeals currently under consideration, the Council's case is based on all the sites identified in a submission draft allocations document rather than a small number of strategic sites. The relevant local plan is in the process of being examined and provides a much clearer picture as to technical or viability issues and the nature of any objections. The circumstances are not comparable and a different approach is warranted here, due to the different characteristics of the evidence base and the availability of public responses to the emerging plan. In addition, it seems to me there is a fundamental flaw in an approach to the assessment of housing land supply which fails to entertain the possibility that a Local Planning Authority with an identified need of at least 1400 dwellings a year and an emerging local plan which provides for 23,800 dwellings may grant at least some planning permissions for residential development over a five year period.
13.46. On its own, the absence of a planning permission is not sufficient reason for a site to be categorised as undeliverable. On that basis, I consider that very little weight can be attached to the Appellant's figures for supply from the existing and emerging local plans.
13.47. The second point arising from the Wainhomes case is that, in a plan-led system, regard needs to be had to the evidence base of the emerging plan, albeit this depends on context. In this instance, the emerging ERYC local plan makes detailed provision for development over the plan period. Whilst the Appellant protests that the detailed evidence base for those allocations was not put to the inquiry, it seems to me that the proper arena to test such detail is indeed the Local Plan examination. For the purposes of this inquiry, it is sufficient to establish the extent to which reliance may be placed on the emerging local plan."
"34. The issue for the inspector was whether the strategic sites were "deliverable" as defined by Footnote 11 so that they fell within the meaning of [47] and should have been included in the assessment of housing land supply. Footnote 11 is not entirely straightforward, but the following points are relevant to its interpretation:
- It is common ground that planning permission is not a necessary prerequisite to a site being "deliverable". This must be so because of the second sentence of Footnote 11 and because it would be quite unrealistic and unworkable to suggest that all of the housing land supply for the following five year period will have achieved planning permission at the start of the period;
- The parties are agreed that a site which is, for example, occupied by a factory which has not been derequisitioned, or which is contaminated so that housing could not be placed upon it, is not "available now" within the meaning of the first sentence of Footnote 11. However, what is meant by "available now" is not explained in Footnote 11 or elsewhere. It is to be read in the context that there are other requirements, which should be assumed to be distinct from the requirement of being "available now", though there may be a degree of overlap in their application. This suggests that being available now is not a function of (a) being a suitable location for development now or (b) being achievable with a realistic prospect that housing will be delivered on the site within five years and that development of the site is viable. Given the presence of those additional requirements, I would accept Ms Busch's submission for the Secretary of State: "available now" connotes that, if the site had planning permission now, there would be no other legal or physical impediment integral to the site that would prevent immediate development;… "
"What constitutes a 'deliverable site' in the context of housing policy?
Deliverable sites for housing could include those that are allocated for housing in the Development Plan and sites with planning permission (outline or full that have not been implemented) unless there is clear evidence that schemes will not be implemented within five years.
However, planning permission or allocation in a Development Plan is not a prerequisite for a site being delivered in terms of the five-year supply. Local planning authorities will need to provide robust, up to date evidence to support the deliverability of sites, ensuring that their judgments on deliverability are clearly and transparently set out. If there are no significant constraints (e.g. infrastructure) to overcome such as infrastructure, sites not allocated within a development plan or without planning permission can be considered capable of being delivered within a five-year timeframe.
The size of sites will also be an important factor in identifying whether a housing site is deliverable within the first 5 years. Plan makers will need to consider the time it will take to commence development on site and build out rates to ensure a robust five-year housing supply."
"What factors should be considered when assessing availability?
A site is considered available for development, when, on the best information available (confirmed by the call for sites and information from land owners and legal searches where appropriate), there is confidence that there are no legal or ownership problems, such as unresolved multiple ownerships, ransom strips tenancies or operational requirements of landowners. This will often mean that the land is controlled by a developer or landowner who has expressed an intention to develop, or the landowner has expressed an intention to sell. Because persons do not need to have an interest in the land to make planning applications, the existence of a planning permission does not necessarily mean that the site is available. Where potential problems have been identified, then an assessment will need to be made as to how and when they can realistically be overcome. Consideration should also be given to the delivery record of the developers or landowners putting forward sites, and whether the planning background of a site shows a history of unimplemented permissions."
Issue (b): the evidence that the emerging plan sites were viable
"13.49. Sites in the PSAD have been subjected to a four-stage assessment which includes deliverability. An example of this can be seen in the discussion of potential sites at Melton at Chapter 3 of Mr Hunt's PoE. However, although this methodology may support inclusion of a site within the emerging local plan, it does not demonstrate the likelihood of its delivery in the next five years, as indicated by the Council's own acceptance that some sites should be discounted.
13.50. Turning to the SHLAA, two key assumptions underpin its reliance on emerging local plan allocations in the five year housing land supply figures: that, since few sites require infrastructure to be provided prior to commencement of development, most of the allocations in the emerging local plan can be regarded as being free from significant constraints; and that the Council is committed to affording weight to the emerging local plan when determining planning applications.
13.51. Infrastructure constraints are identified in the emerging local plan (see eg PSSD policy A1). Although the responses to the PSAD have resulted in comments on many of the allocations, the general tenor of these does not indicate a failure to identify constraints. In addition, the Appellant's scrutiny of these allocations during the course of the inquiry indicated a need for relatively little change in the Council's assessment of sites which should be discounted (from 373 in ERYC 16 to 419 in ERYC 38a). As such, I consider that the first key assumption has been shown to be reasonable.
13.52. As to the second, a comparison between the information provided in April 2014 and the update to the inquiry three months later provides a useful illustration of the extent to which the Council is standing by its commitment to afford weight to the emerging local plan. The table below shows that the number of sites with planning permission or expected to obtain such permission has risen significantly (by almost 1100 in three months) and the trend for those under consideration is also upward. On that basis, I consider that the second key assumption in the SHLAA is also reasonable.
13.53. Clearly, given the number of sites involved, it may well turn out that not all allocations currently identified as deliverable will in fact be delivered. However I consider that, overall, the Appellant has not shown that this part of the evidence base is lacking in robustness. As a result, the Council's figure of 11,156 dwellings on sites identified in the emerging local plan should carry substantial weight."
Issue (c ): the approach to "deliverable" sites
"13.53. Clearly, given the number of sites involved, it may well turn out that not all allocations currently identified as deliverable will in fact be delivered…."
"13.56… However, the assessment of supply is distinct from that for delivery."
Issues (d) and (e): housing record and trajectory
"13.56. Whilst the Council's supply figure has fluctuated over the period of the inquiry, a fair reading of Mr Hunt's first proof shows that the discussion of a 12 year supply took place in the context of the weight which could be attached to sites in the emerging local plan (StM16). In a situation where a Local Plan is under preparation, it is not surprising that data will be subject to revision. As such, the fluctuations of themselves should not be seen as indicative of a lack of reliability. It is also suggested that the 15,000 figure should be seen as absurd in comparison with the housing trajectory. However, the assessment of supply is distinct from that for delivery."
Ground 2: Housing land requirement
13.16 As the Appellant points out, the question of full, objectively assessed need has been the subject of several planning appeals as well as Court judgements. From these, the key point which arises in relation to this appeal is that, since there is no up to date Local Plan, it is necessary to identify the full, objectively assessed need, unconstrained by policy considerations, in order to arrive at the housing requirement. The fundamental point of disagreement between the Council and Appellant was whether, in this context, the starting point for establishing the housing requirement should be the LPA administrative area or the housing market area (HMA). The Appellant favours a figure based on the local authority's administrative area. The Council commends the use of the figure for the housing market area.
13.17 The Appellant's case on this point could be summarised as being that the HMA-based figure amounts to a policy constraint since it is a matter to be tested as part of the examination of the Local Plan. The use of the LPA area has been common practice in other planning appeals and was also the approach used in Hunston and Gallagher. As such, it is argued, the figure for this appeal should be that for the LPA administrative area.
13.18 On the other hand, the Council's case is that those legal judgements were directed towards principles such as the source of the figure for objectively assessed need and the importance for such a figure to be tested robustly. Thus, the courts have not yet dealt with the particular principle of whether the proper application of NPPF paragraph 47 in the development management context might reasonably be understood to envisage use of a figure based on the housing market area.
13.19 In this respect, Mr Young's advice is that the Courts have been alive to the wording of this paragraph and to the reference to the housing market area. There is no explicit ratio that supply must be decided by reference to the LPA area but this has been the basis for the preceding judgments. This reflects the fact that the LPA area is also the basis on which the housing supply has to be calculated. In further support, he refers to an (undefended) appeal decision where it was conceded that there had been an error of law whereby supply had not been assessed on the basis of the LPA area.
13.20 The interpretation of policy is a legal matter. However, when a decision-maker comes to apply a policy, it should be read objectively and in context. In relation to plan-making, the Government requires LPAs to have a proper understanding of housing needs in their area at paragraph 47, the policy framework is set out for the delivery of housing to meet that need in full.
13.21 It seems to me that the use of the term 'housing market area' in paragraph 47 should be understood in relation to the later advice at paragraph 159 as to the evidence base for plan-making. Paragraph 159 states that it is the SHMA which should provide evidence of that need, recognising that the SHMA may cross administrative boundaries. Moreover, the importance of the housing market area as a unit for analysis is illustrated by the guidance in PPG as to how it should be defined and to its use in relation to assessments of need. In order to conform to national guidance and to produce a development plan which meets the test of soundness, the LPA must address the situation within the housing market area.
13.22 In addition, it is inherent in the activity of spatial planning that it must have some regard to local context, it cannot be undertaken in a vacuum. In this case, the key factors would include the functional relationship between the administrative areas of the two Councils and the longer term direction of strategic planning for the area. The East Riding of Yorkshire is a predominantly rural authority, wrapping around the City of Hull, whose own boundaries are quite tightly drawn around the urban area. The extent of the interrelationship has long been recognised for planning purposes, such as through the existence of the JSP. It is clearly expected to continue, as indicated by the defined FEA and HMA as well as the joint working arrangements in place for the preparation of the respective Local Plans for the two Authorities. Thus, notwithstanding the absence of an up to date development plan, it would run counter to the established approach to the strategic planning of the area, as endorsed by the respective Councils, to adopt an approach in relation to these appeals which looked only at the ERYC area and disregarded any consideration of the implications for the City of Hull.
13.23 In my view, therefore, a figure based on the HMA should not be understood as having been subject to policy constraint in the same way, for example, as a figure which has been affected by other planning policies such as the existence of designated green belt, as was the case with Hunston. As regards the Richborough Estates case, it is relevant to note that it took place in 2011, prior to publication of NPPF. Under the then PPS3 Housing, the focus was on the LPA area rather than the housing market area (a point also noted in CD C3 paragraph 21). This indicates a material shift has taken place in the underlying policy approach since that time, with NPPF placing increased emphasis on planning's role of assisting and supporting the market provision of housing. Mr Young's further point, that supply is calculated on the basis of the LPA area, I consider to be a pragmatic reflection of the fact that a Council's plan-making powers do not extend beyond its administrative area.
13.24 Whilst acknowledging Mr Young's views, I consider that an assessment of need based on the HMA should be understood as an integral requirement arising from national planning policy for housing, rather than the outcome of a second stage of policy-making at the local level.
13.25 However, although I accept Mr Tucker's point as to the proper application of NPPF paragraph 47, especially in the context of the East Riding, I am also conscious that NPPF has been framed in the context of a plan-led system. At the time of the inquiry, the HMA–apportioned figure was untested in two respects, firstly as regards the influence of the York HMA on the ERYC area and secondly as to the appropriate distribution between ERYC and Hull. The Council's evidence to the inquiry on these points, although somewhat thin, nevertheless indicates that they have received due consideration as part of the overall planning strategy. The HMA-based figure for full, objectivity assessed need cannot be given full weight since it is not contained in a duly adopted Local Plan. Even so, I consider that it should be taken as the starting point for the assessment of the housing requirement for these appeals. However, until the Local Plan is in place, the figure for the whole of the ERYC area should serve as an important consideration."
"Prepare a Strategic Housing Market Assessment to assess their full housing needs, working with neighbouring authorities where housing market areas cross administrative boundaries. The Strategic Housing Market Assessment should identify the scale and mix of housing and the range of tenures that the local population is likely to need over the plan period which:
-meets household and population projections, taking account of migration and demographic change;
-addresses the need for all types of housing, including affordable housing and the needs of different groups in the community (such as, but not limited to, families with children, older people, people with disabilities, service families and people wishing to build their own homes); and
- caters for housing demand and the scale of housing supply necessary to meet this demand;
- Prepare a Strategic Housing Land Availability Assessment to establish realistic assumptions about the availability, suitability and the likely economic viability of land to meet the identified need for housing over the plan period."
Ground 3: the £6m bridge contribution
"13.82. In addition, the specific land identified by the Appellant is that to the south of the appeal site and across the railway line. The offer of funds to improve the accessibility of this land is made to overcome any harm associated with the use of 24ha of land within the appeal site for non-employment purposes (Appeal B(ii)). The area of land to benefit from improved access would be in the region of 142ha, some six times greater than that proposed for use for housing. Even allowing for the fact that some of this land is already in use, the scale and cost of this compensatory measure appears disproportionate to the potential harm it is intended to address. In addition, as Mr Garness' evidence makes clear, there are several other locations along the East-West multi-modal transport corridor which could be seen as candidates for a key employment site, not least of which would be the proposed extension to Melton West being promoted by Wykeland through the Local Plan process.
13.83. For these reasons, I consider that the offer of funding for a bridge across the railway line would not be a proportionate or reasonable response to any harm to the supply of employment land. However, for completeness, I set out my assessment of the case as made. To do so it is necessary to evaluate the substitute land in terms of its location and deliverability."
"13.87. The appeal site comprises a substantial proportion of the Melton site, one of only four key employment sites in the East Riding and one of only two identified for general industrial uses. Melton is highly accessible and is available now, capable of responding to any interest arising either directly or, more likely, indirectly as a result of the Siemens investment. It represents a logical choice in relation to the spatial strategy of the emerging local plan. If the appeal site was developed for housing, whether along the lines of Appeal A or Appeal B, the status of Melton as a key employment site would be much diminished so that it would have a significant, detrimental effect on the portfolio of employment land. The likelihood of a lengthy delay in delivery of the suggested bridge over the railway line and the characteristics of the land itself mean that it would not immediately represent a comparable substitute for the land at Melton. Although there is potential for other land to come forward, this would have to be on an ad hoc basis rather than as part of a plan-led approach. As such, the proposed developments would be likely to cause substantial harm to wider economic development objectives, with some scope for more limited harm to the aim of assisting the Humber to become established as a centre for renewable energy."
"14.10. … Where employment development is the predominant use, priority can be given to the needs of prospective developers for similar uses. Under the appeal proposals, the Melton industrial area would take on a mixed use character. In such circumstances, the needs of prospective industrial developers would become only one consideration amongst others, including the protection of residential amenity. In this respect therefore, I do not agree that the harm would be materially less in the case of Appeal B. In both instances, this harm should carry substantial weight."
Ground 4: an irrational conclusion on Appeal B?
Conclusion