Irish Law Reform Commission Papers and Reports |
||
You are here: BAILII >> Databases >> Irish Law Reform Commission Papers and Reports >> Statutes of Limitation: Claims in Contract and Tort in Respect of Latent Damage (Other Than Personal Injury), Report on the (LRC 64-2001) [2001] IELRC 64 (1st February, 2001) URL: http://www.bailii.org/ie/other/IELRC/2001/1.html Cite as: [2001] IELRC 1, [2001] IELRC 64 |
[New search] [Printable PDF version] [Help]
Click here for Picture
__________
1. On 11 November 1997 the Attorney General requested the Law Reform Commission
"to review the
Statutes of Limitation, 1957 and 1991
in relation to
claims in contract and tort (other than claims in respect of personal injuries)
in circumstances where the loss is latent i.e. in circumstances where the
person was not aware, or could not have been aware of, the accrual of the right
of action until after the expiration of the relevant limitation period."
The Commission considers that `quasi-contractual' claims are also within the
terms of the Attorney General's Reference.
2. A Consultation Paper on foot of this Reference was published in November
1998. A colloquium was held on 23 March 1999. This Report now sets out the
final recommendations of the Law Reform Commission in response to the Reference
from the Attorney General.
Statutes of Limitations
3. The law of limitations in Ireland is governed by the
Statute of
Limitations, 1957
, as amended by the
Statute of Limitations (Amendment)
Act, 1991
and the
Statute of Limitations (Amendment) Act, 2000
. In
summary, it provides that if proceedings are commenced after the expiration of
the specified statutory limitation period for the claim in question, the
defendant may raise the defence that the proceedings are `statute-barred'
thereby precluding any discussion of the merits of the claim.
Purpose of Limitation Periods
4. The purpose of limitation periods is twofold: to discourage plaintiffs from unduly delaying the institution of proceedings; and to protect defendants from stale claims.
5. The existence of a stringent procedural rule, which bars discussion of substantive issues, is justified by reference to the increasing risk of injustice with the passing of time. Firstly, there is some truth in the statement that long dormant claims have "more of cruelty than justice in them",[1] since the later the claim, less reliable the memories of witnesses and the more likely that there will be difficulties in locating witnesses and evidence.
6. Secondly, factors add to the length of time which is required to resolve the dispute and thereby prevent the use of the public resources of the courts system for current disputes. Thirdly, the expense of extended insurance coverage and storage of records necessary to defend a claim, further adds to the defendant's burden and, where the defendant is a business, these costs may be passed on to its customers.
7. On the other hand, to bar all plaintiffs without exception with claims above
a certain age, from bringing their case to court to secure justice is a strong
sanction to apply. Apart from the possibility of injustice to the individual
plaintiff, society in general has an interest in claims which challenge
anti-social behaviour as this contributes to the maintenance of proper
standards and bolsters the public regulatory regime.[2]
Consolidation of the Statutes of Limitations
8. The Statutes of Limitations to date consists of:
(i) the Principal Act being the
Statute of Limitations, 1957
;
(ii) the
Statute of Limitations (Amendment) Act, 1991
which deals with
personal injury cases;
(iii) the
Statute of Limitations (Amendment) Act, 2000
which deals with
sexual abuse cases.
In the near future, two more pieces of legislation are to be added to this
list.[3]
Thus there will be a total of five
Acts, dealing with the law of limitations in this jurisdiction, not to mention
the other pieces of legislation, like the
Liability for Defective Products
Act, 1991
, which also deal with limitation periods.
9. Our limitations legislation is becoming very untidy. Both for the ordinary person on the street and practitioners alike; the amendments and the cross referencing are cumbersome and confusing.
10. The Commission believes that there is an urgent need for the consolidation
of the limitations legislation.
Commission Recommendations
11. Under the existing law, claims for damage in contract and tort (other than personal injury), will be statute-barred after a period of six years from the date the cause of action accrues. It is irrelevant whether the claimant was aware or could have been aware of the right of action until after that period. The central question which the reference asks by implication is whether this law sets the correct balance.
12. The Commission is of the opinion that the current law does not adequately protect the plaintiff in cases where the damage is so latent as not to be discoverable until after (or perhaps shortly before) the expiration of the current limitation period. This conclusion leads the Commission to propose the introduction of a special provision to extend the limitation period in such cases.
13. However, the Commission is also mindful of the valuable functions served by limitation periods and would not wish to introduce undue uncertainty into the law. It is for this reason that, along with its main recommendation of the introduction of a discoverability test in cases of latent loss in contract and tort, excluding personal injury, the Commission recommends in Chapter Four the enactment of a long-stop limitation period after which all claims would be statute-barred.
14. In short, the Commission's main recommendations are that a discoverability
test be introduced, balanced by the enactment of a long-stop limitation period.
The Commission believes that its final recommendations would reduce the
potential for injustice to the plaintiff who suffers latent loss under the
present law, while still retaining the appropriate limitation period.
Layout of this Report
15. Words which import the masculine gender, should be construed throughout this Report as also importing the feminine gender, and vice versa, unless the contrary intention appears. See s.11 of the Interpretation Act, 1937 and s.33 of the Interpretation (Amendment ) Act, 1993 .
16. This report takes the following format:
Chapter One
deals with the current law in respect of discoverability and
accrual. It looks at the
Statute of Limitations (Amendment) Act, 1991
,
the
Liability for Defective Products Act, 1991
and the English
Latent
Damage Act, 1980
.
Chapter Two
discusses the discoverability test as it already exists for
personal injury claims. It then goes on to consider non-personal injury claims
and to propose a discoverability test that would be more suitable to latent
defects. The Commission then explains the proposed test of discoverability and
defines the parameters of the test by reference to practical examples from the
current regime.
Chapter Three
deals with the question of whether the limitation period
based on accrual should be retained and combined with the discoverability test
or whether the discoverability test should be the sole limitation period.
Chapter Four
details the Commission's proposals for a `long-stop' that
is an ultimate limitation period beyond which all claims would be
statute-barred. Considering that long-stop limitation periods are still
relatively new in this jurisdiction, the Commission weighs the arguments in
favour and against the proposal, and also the various considerations pertinent
to the length of the period chosen. It also looks at the options of accrual or
the date of the act/omission and opts for the date of accrual as the starting
point of the long-stop.
Chapter Five
looks at the implications and consequences of the proposed
discoverability test for:
A. Separate incidents of damage arising from the same cause of action;
B. Subsequent purchasers;
C. The burden of proof;
D. Transitional provisions.
Chapter Six
considers the situations where the ascertainment of the date
of accrual is not crystal clear. Since it is recommended that the long-stop run
from the date of accrual, it is important to consider these situations.
Chapter Seven
addresses a number of miscellaneous issues, some of which
arise from the Commission's main recommendations. The issue of postponement of
the limitation periods in cases of legal incapacity, fraud or mistake is
discussed. The survival of actions both for the benefit of and against the
estate of the deceased are also examined in the context of the proposed
discoverability provision.
Chapter Eight
contains a summary of the Commission's recommendations.
CHAPTER ONE: PRESENT LAW
I: Current Law
1.01 The Statute of Limitations, 1957, s.11, provides that (save in personal injury actions) no action, in tort or contract, is to be brought after the expiration of six years from the date on which the cause of action accrued.[4] A cause of action is defined as every fact which it is necessary for the plaintiff to prove to support his right to judgment.[5] A cause of action accrues at the earliest time at which an action can be brought i.e. "when a complete and available cause of action first comes into existence."[6] Thus traditionally Irish law has rejected the concept that a cause of action does not accrue until the damage is discovered, or is at least discoverable, in tort and contract cases not involving personal injuries. In England, the case of Pirelli General Cable Works Ltd. v. Oscar Faber and Partners [7] dealt with a claim for physical damage to property caused by negligence in the design or workmanship of a building.[8] It was held that the cause of action in tort accrued at the date when physical damage occurred to the building. In this case cracks due to the negligent design of the chimney first occurred in April 1970. The plaintiffs had contended that the faults could not have been discovered until 1972 and therefore the cause of action did not accrue until that date. Had they been successful in their claim, the proceedings instituted in 1978, shortly after the cracks had both become discoverable and been discovered, would have been in time. The House of Lords, however, rejected the date of discoverability as the date when the cause of action accrued. Accordingly, the limitation period began to run prior to 1970, and the action was statute-barred.
1.02 In so holding, the House of Lords overruled the case of Sparham-Souter v. Town and County Developments [9] which had adopted a discoverability starting date.[10] This latter case had been substantially relied upon in Morgan v. Park Developments .[11] In Morgan the plaintiffs purchased a house in September 1962. The defendants were notified of some defects at the end of 1963 and these were repaired in 1964 and again in 1965. In 1965 the plaintiffs were informed that the defect in question was just a settlement crack. However the crack re-emerged in 1979, whereupon consultation with an architect revealed that it was the result of major structural weaknesses and so proceedings were instituted in 1980. Carroll J held that the cause of action in tort accrued on the date of discoverability, "meaning the date the defect either was discovered or should reasonably have been discovered."[12] This effectively postponed the date of accrual of the cause of action beyond the point in time when the damage actually occurred to the time -1979- at which the plaintiff became aware of the structural defect.
1.03 However,
Morgan
was in effect overruled in the Supreme Court case
of
Hegarty v.
O'Loughran.
[13]
In both cases, the relevant law was the
Statute of Limitations,1957
(not at the time amended by the
Statute of Limitations (Amendment) Act,
1991) which was at that time identical for both personal injury and
non-personal injury claims. Although it concerned personal injuries,
Hegarty
is important because of the consideration given by the Supreme
Court to Carroll J's interpretation of the 1957 Statute in
Morgan
. In
interpreting the statute, the Supreme Court felt bound to reject the
discoverability test and held that the cause of action accrued when the defect
first occurred thus overruling Carroll J's decision in
Morgan
as to when
accrual of the cause of action in tort occurred. In so doing, McCarthy J
commented:
"I recognise the unfairness, the harshness, the obscurantism that underlies
this rule, but it is there and will remain there unless qualified by the
Legislature or invalidated root and branch by this Court."[14]
The facts of
Hegarty v. O'Loughran
illustrated the injustice to which
McCarthy referred. The plaintiff underwent surgery to her nose in 1973. This
surgery subsequently began to deteriorate in 1976 and she suffered great pain
and injury as a result. The plaintiff was not aware of the existence of the
cause of action against the defendant until 1980, and she instituted
proceedings two years later in 1982 against the defendant. The Supreme Court
held however that the cause of action accrued when provable personal injury
capable of attracting compensation occurred to the plaintiff which was the
completion of the tort alleged to have been committed against her. On this
basis, the three year limitation under s.11.(2)(b) of the
Statute of
Limitations, 1957
began to run from 1976, not 1980, against the defendant,
resulting in the action against him being barred.
II: Discoverability in the Present Law
1.04 Before going on to consider reform in the present area, we must consider
three analogous fields in which the discoverability concept has been adopted.
A. Limitation in Personal Injury Actions
1.05 The Law Reform Commission in a Report of 1987 recommended the introduction of a `discoverability' test in relation to the limitation of actions in cases of personal injury.[15] The Commission's central line of reasoning in favour of such a reform was that: "whatever hardship there may be to a defendant in dealing with a claim years afterwards, it must be less than the hardship to a plaintiff whose action is barred before he knows he has one."[16] This recommended test was enacted by the Statute of Limitations (Amendment) Act, 1991 ,[17] s.3(1) of which provides for a limitation period of three years from the date "on which the cause of action accrued or the date of knowledge (if later) of the injured person."
1.06 Under the
Statute of Limitations (Amendment) Act
1991
, the
limitation period commences with the date when the cause of action accrued or
(if later) "the date of knowledge" of the plaintiff. S.2 defines the date of
knowledge as the date on which the person first had knowledge of certain facts,
namely:
"that the person alleged to have been injured had been injured;
that the injury in question was significant;
that the injury was attributable in whole or in part to the act or omission
which is alleged to constitute negligence, nuisance or breach of duty;
the identity of the defendant; and
if it is alleged that the act or omission was that of a person other than the
defendant, the identity of that person and the additional facts supporting the
bringing of the action against the defendant."[18]
B. Liability for Defective Products Act, 1991
1.07 This Act, which was introduced pursuant to the
Liability for Defective
Products Directive
No. 85/374EEC provides a limitation period of:
"three years from the date on which the cause of action accrued or the date (if
later) on which the plaintiff became aware, or should reasonably have become
aware of the damage, the defect and the identity of the producer."[19]
The reference to the date of `reasonable awareness' is to be construed in
accordance with s.2 of the 1991 Act so long as this does not entail a
construction which would impinge upon the effectiveness of the Directive.[20]
1.08 However, the focus of this legislation is the relatively narrow field of
the consumer who suffers by virtue of a defective product. While it does
include damage to property, (other than the defective product itself) the
property must have been ordinarily intended for private use or consumption, and
have been used by the `injured person' mainly for his own private use or
consumption. The key concept in the 1991 Act is "product", which the Act
defined to mean "all moveables" (with certain exceptions not relevant for our
purposes). Under this definition, it would be possible to claim for latent
damage caused by a moveable product which caused latent defects in a building
for example tiles on a roof. However, it seems that construction cases
involving latent loss are more likely to be caused by a number of factors,
often including the design of the building so that in practice a claim confined
within the limits of the 1991 Act - "defective products" - would only apply in
rather narrow circumstances.
C. (English) Latent Damage Act, 1986
1.09 The notion of discoverability is also now part of limitations law in many other jurisdictions.[21] In England the Law Committee was asked to examine the law in relation to limitation of actions in negligence cases involving latent defects (other than personal injury). Their Report in 1984 made the plaintiff's knowledge of significant damage the cornerstone of their recommendations for an extended period of limitation.[22] The advantage in using the word `significant' in the test, according to the Committee is that latent damages can be particularly difficult to ascertain, often beginning with trivial minor defects. It is also noteworthy that the English test makes specific reference to the `reasonable person'.
1.10 The
English Latent Damage Act
,
1986
, s.1, which inserts
s.14A (5) into the
Limitation Act
,
1980
defines the starting date
of the limitation period as:
"the earliest date on which the plaintiff or any person in whom the cause of
action was vested before him first had both the knowledge required and a right
to bring an action."
"Knowledge" is defined in 14A(6) as "knowledge both -
(a) of the material facts about the damage in respect of which damages are
claimed; and
(b) of the other facts relevant to the current action "
Both (a) and (b) are further expanded. First, "the material facts" in (a) are
defined as:
"Such facts about the damage as would lead a reasonable person who had suffered
such damage to consider it sufficiently serious to justify his instituting
proceedings for damages against a defendant who did not dispute liability and
was able to satisfy a judgment."[23]
Secondly, these "other facts" referred to in (b) are:
"(a) that the damage was attributable in whole or in part to the act or
omission which is alleged to constitute negligence; and
(b) the identity of the defendant; and
(c) if it is alleged that the act or omission was that of a person other than
the defendant, the identity of that person and the additional facts supporting
the bringing of an action against the defendant."[24
]
CHAP
T
ER TWO: THE DISCOVERABILITY TEST
I. Discoverability Test for Personal Injuries
2.01 In this Part, in order to give us certain reference points for our
detailed discussion of discoverability in the context of non-personal injury
litigation, we consider the case-law on the new discoverability test in the
field of personal injuries which was established by the
Statute of
Limitations (Amendment)Act, 1991.
[25]
A. The Judicial Interpretation
2.02 The fundamental change to the limitation of actions in respect of personal
injuries brought about by the 1991 Act was the introduction of the "date of
knowledge of the person injured" as the date from which the limitation period
shall run. Under s.2(1) knowledge means knowledge of the following facts:
"(a) that the person alleged to have been injured had been injured,
(b) that the injury in question was significant,
(c) that the injury was attributable in whole or in part to the act or omission
which is alleged to constitute negligence, nuisance or breach of duty,
(d) the identity of the defendant,
(e) if it is alleged that the act or omission was that of a person other than
the defendant, the identity of that person and the additional facts supporting
the bringing of an action against the defendant." [26]
Constructive knowledge will also trigger the limitation period under s.2(2)
which states that :
"a person's knowledge includes knowledge which he might reasonably have been
expected to acquire-
(a) from facts observable or ascertainable by him, or
(b) from facts ascertainable by him with the help of medical or other
appropriate expert advice which it is reasonable for him to seek."[27]
2.03 It is further provided by s.2(3) that a person will not be fixed with
knowledge of a fact which could only be ascertained with the help of expert
advice, so long as he has taken all reasonable steps to obtain that advice.
Nor, it is provided, shall a person be fixed with knowledge of a fact relevant
to the injury which he has failed to acquire by virtue of that injury.
Actual Knowledge
2.04 Interpretation of the actual knowledge requirement by the courts reveals that `knowledge' is taken to mean "know with sufficient evidence to justify embarking on a claim."[28] Accordingly, it can be inferred that while vague and unsupported suspicion would not be sufficient; absolute certainty is not required.
2.05 The discoverability limitation period is triggered only when the claimant has knowledge of the facts in s.2(1) listed (a) to (e). Difficulties have arisen in relation to (b); "that the injury in question was significant". The primary purpose of this requirement is to prevent a trivial injury, or a significant injury which would appear trivial to the reasonable person, from triggering the limitation period. [29]
2.06 The 1991 Act, unlike the English
Limitations Act
,
1980
, does
not define what is meant by "significant". Under the English
Limitations
Act
,
1980
, s.14(2), an injury is defined as significant:
"[i]f the person whose date of knowledge is in question would reasonably have
considered it sufficiently serious to justify his instituting proceedings for
damages against a defendant who did not dispute liability and was able to
satisfy judgment."[30]
This test, according to Geoffrey Lane LJ in
McCafferty v. Metropolitan
Police Receiver,
[31]
is partly objective
and partly subjective. He explains the definition in the following terms:
"Taking that plaintiff, with that plaintiff's intelligence, would he have been
reasonable in considering the injury not sufficiently serious to justify
instituting proceedings for damages?"
2.07 The Commission in its Report on Personal Injuries [32] alludes to the various criticisms of the English definition. One of these is that it may be difficult to decide "whether the test to be applied in determining whether it was reasonable to regard the injury as not 'sufficiently serious' is an objective or a subjective test."[33]
2.08 On one view the absence of any definition of the term "significant" in the 1991 Act, suggests that the requirement is to be directed to the quantum and not to the claimant's evaluation. Accordingly, it is implicit that the test of "significance" is objective.
2.09 However, Quirke J in Whitely v. Minister for Defence [34] took a different view. He was of the opinion that the absence of a definition of the term "significant" in s.2 of the 1991 Act signalLed that the test of significance ought to be even more subjective than the English test.
2.10 Quirke J, refers to the Law Reform Commission Report, which led to the
Irish 1991 Act:
"The Law Reform Commission Report entitled
The Statute of Limitations:
Claims in Respect of Latent Personal Injuries
published in 1987 expressly
considered the definition contained in s.14 of the English Act and pointed out
that the provision had been criticised on various grounds (see p 17 thereof).
The Commission expressed the view that `the best approach would be for the
legislation to require that, for time to begin to run, the plaintiff ought to
have been aware that the injury is significant'(see p. 44). Furthermore the
Report provided a `General Scheme of a Bill' which made no provision for a
definition of the kind contained in s. 14(2) of the English Act and indeed this
'General Scheme' appears to have been enacted into legislation more or less
without amendment by the Legislature."[35]
Having made these observations, the judge concludes:
"Accordingly Section 2 of the 1991 Act expressly avoids any attempt to define
what is meant by a 'significant' injury within the meaning of sub-section
2(1)(b) of the Act and I take the view that by excluding any definition it was
the intention of the Legislature to avoid confining the sense in which the word
"significant" ought to be understood to the terms of the definition contained
in Section14(2) of the English Act or to any particular terms. If I am correct
and if it was intended that a broader test should be applied than was
contemplated by the definition contained within Section 14(2) of the English
Act, then it would seem to follow that the test to be applied should be
primarily subjective and that the Court should take into account the state of
mind of the particular Plaintiff at the particular time having regard to his
particular circumstances."[36]
2.11 Quirke J described the requirement that the injury be significant as " primarily subjective" [his emphasis] as it is qualified to a certain extent by the provisions in subs.2.[37] It appears that Quirke J envisaged that the limitation period would commence when the claimant knew or could reasonably be expected to know, taking into account the state of mind of the particular plaintiff, in his particular circumstances that the injury was significant.
2.12 The practical implication of the difference between the English and the Irish test as to whether "the injury in question was significant" is that Quirke J entertained several extraneous factors arising from the plaintiff's individual circumstances. For example, he took into account not only the plaintiff's heart condition and by-pass surgery which would have distracted his attention from the symptoms of hearing loss and tinnitus; but also that his personality was such that he was the sort of person who would dismiss the injury and decide he was getting better.
2.13 In the later case of Bolger v. O'Brien ,[38] in following and applying this "primarily subjective" test of significance, in the High Court, McGuinness J considered that the plaintiff was "the sort of man who perhaps puts to one side the injuries that he is suffering and has made up his mind that he is getting better"[39] and furthermore, that "subjectively" the plaintiff was not aware of the full significance of his injuries until he was re-examined two years after the accident.[40]
2.14 The Supreme Court[41]
in
Bolger,
while accepting the interpretation of "significant" offered in
Whitely
,
overturned the decision of McGuinness J in the High Court, holding that the
test had not been correctly applied to the facts.
"The test is when he knew or ought reasonably to have known
`from facts
observable or ascertainable by him' that he had suffered a significant
injury... The fact that the respondent did not realise the full significance of
the effect of such injury is not of relevance once it is established that he
knew that the injury was significant."[42]
Nevertheless the issue remains unclear.
In doing so it seems that the Court sought to place more emphasis on the
objective element of the provision and the actual facts as disclosed by the
evidence, as opposed to the plaintiff's impression of those facts.
Constructive Knowledge
2.15 Under the 1991 Act, a person's constructive knowledge refers to knowledge, "which he might reasonably have been expected to acquire". This knowledge can be acquired either from "facts observable or ascertainable by him" or from facts "ascertainable by him with the help of medical or other appropriate expert advice which it is reasonable for him to seek".
2.16 The Law Reform Commission Report[43]
suggested that the test should be that of the "reasonable person", taking
account of those circumstances which cannot be divorced from the situation.
"The test of what a reasonable man should know is in one sense undoubtedly
objective, but it also must take account of at least some aspects of the
particular person's subjective experience. Thus, for example, if the plaintiff
is a doctor this fact should not be ignored when assessing what he or she might
reasonably have been expected to know about his or her condition. We consider
that if the effect of the accident is to slow the injured person down so that
he is less diligent in finding out about how it was caused than an ordinary
healthy person would be, the question of the reasonableness of the
discoverability of his injuries should embrace the fact of his debilitated
condition. Beyond this we consider that no further deference to subjective
considerations would be appropriate in determining whether the plaintiff has
acted reasonably."
There does not appear to be anything in the case-law which would suggest that
the test is otherwise. However, the interpretation of the "significant injury"
requirement, in s.2(1) of the 1991 Act, by Quirke J in
Whitely,
has
considerably diluted the test as it applies to this requirement.
2.17 Since the Irish case-law to date has not examined in any detail what is
meant by the constructive knowledge provision, it may be useful to briefly
examine the English case-law on the similarly worded English provision. These
cases disclose an absence of any consistent direction. In
Nash v. Eli Lilly
& Co
[44]
Purchas LJ said:
"The standard of reasonableness in connection with the observations and/or the
effort to ascertain are therefore finally objective, but must be qualified to
take into consideration the position, circumstances and character of the
plaintiff."
However, in
Forbes v. Wandsworth Health Authority
[45]
all three members of the Court of Appeal expressed their
reservations as to how an objective test, like the one in s.14 -and in s.2 of
the Irish 1991 Act- could be combined with an approach that takes into account
the personal characteristics of the plaintiff. Furthermore, Stuart-Smith LJ
stated: "It does not seem to me that that the fact that the plaintiff is more
trusting, incurious, indolent, resigned or uncomplaining by nature can be a
relevant characteristic, since this too undermines any objective approach."[46]
Not surprisingly the majority of the Court
of Appeal found that
Nash
did not entail any such subjective
qualification of the objective test.
2.18 In O'Driscoll v. Dudley Health Authority [47] Otton LJ, having examined both Forbes and Nash stated "It is not easy to reconcile these two approaches but in my view it is not necessary to do so for the purpose of deciding the case."
2.19 However, whatever about the particular circumstances of the claimant,[48]
there at least seems to be a consensus that
the test is an objective test, and therefore should not take into account the
personal characteristics of the claimant.[49]
II. The Discoverability Test for Non-Personal Injury Claims
A. Actual Knowledge & Constructive Knowledge
2.20 Inevitably, the non-personal injury discoverability test will include an actual knowledge and a constructive knowledge element. "Actual knowledge" as under the 1991 Act means "know with sufficient evidence to justify embarking on a claim."[50] In respect of the latter it is necessary to decide when a claimant should be imputed with constructive knowledge in non-personal injury claims.
2.21 The concern here is to devise a test which strikes a balance between a subjective test which would take into account the factors which have influenced the particular claimant and possibly led to the delay, and, on the other hand, an objective test which would focus on the actual circumstances, unaffected by how they might be perceived by someone in the plaintiff's circumstances.
2.22 There are three options. The first, a purely objective test which in determining the point when the damage was discoverable would involve the application of a straightforward list of criteria to the facts, without any consideration of the plaintiff's individual circumstances or characteristics. In other words, it would apply the "reasonable person" test to the average man. It would be irrelevant that the claimant was an engineer with specialist knowledge or indeed a blind person. While such a purely objective test would guarantee a degree of certainty for defendants and insurers, the Commission is of the opinion that it could operate to bar many of the claims which under the current law are statute-barred, and so give rise to injustice. Indeed as stated by the New Zealand Law Commission an "objective hypothetical reasonable man" test may undermine the essential thrust of the discoverability extension.[51] In order to avoid this outcome some element of subjectivity is considered essential.
2.23 The second option is a subjective standard of reasonableness, along the
lines of the suggestion in the English Law Commission's Consultation Paper. [52]
"Constructive knowledge should include a large subjective element so that it
should be defined as "what the plaintiff in his circumstances and with his
abilities ought to have known had he acted reasonably."[53]
2.24 The Commission wishes to avoid formulating a test which would open the doors to allow those with a claim for latent loss, to postpone the running of time against them until they choose to take cognisance of certain facts, which would have been obvious to them had they exerted normal powers of observation. It is, therefore, appropriate to require prospective plaintiffs to measure up to a certain objective standard.
2.25 Under the English Law Commission's test, the circumstances and abilities of the plaintiff are taken into account when assessing the objective reasonableness of the delay. We feel that the phrase "in his circumstances and with his abilities" is too wide. It could be interpreted as embracing some inappropriate personal characteristics of the claimant, like for example the fact that the claimant is naïve or unobservant. The objective requirement of reasonableness would be considerably undermined if such factors could be taken into account.
2.26 The third option is an objective test of reasonableness tempered only by
certain subjective elements along the lines of the Alberta
Limitations
Act
,
1996.
S. 3(1) of the Alberta
Limitations Act, 1996
provides for a limitation period[54]
starting
at:
"[T]he date on which the claimant first knew, or in the circumstances ought to
have known
...
."
The Alberta Law Reform Institute explains the criterion as follows: "The
discovery rule incorporates a constructive knowledge test which charges the
claimant with knowledge of facts which, in his circumstances he ought to have
known. This is the reasonable man standard"[55]
Effectively this is the same "reasonable person test"
which has been developed in the law of torts.[56]
The test pertains to a standard: the judge should ask,
not "when would I have known?" or "when would the average man have known?" but
rather "when should the plaintiff, as a reasonable person, have known?"[57]
The way people normally behave is an
essential element in the determination of the answer: there is a close
correlation between the second and third questions.
2.27 The Commission believes that the third option, strikes the desired balance between a purely objective and a subjective standard of reasonableness.
2.28 The Commission is of the view that adding the word, "reasonably" to the
just quoted Alberta test will emphasise the intention to apply the test of
"reasonable person" within the circumstances of the claimant's situation. Thus
the limitation period commences on "The date on which the claimant first knew,
or in the circumstances ought
reasonably
to have to have known".
2.29 The Commission recommends that the discoverability limitation period
commence when the claimant first knew or in the circumstances ought reasonably
to have known of the elements listed in the discoverability formula.
[58]
B. The Constructive Knowledge Test
2.30 The test recommended effectively incorporates the "reasonable person" standard used in the law of torts.[59] The reasonable person is possessed of a certain basic level of knowledge, experience, moral qualities and intelligence which make him act reasonably. Take a case where this approach was applied to the defendant. He had been advised of the probable consequences of allowing a stack of damp hay, which he had erected without proper ventilation, to remain in this condition. Subsequently the hay spontaneously ignited damaging the plaintiff's house. The defence that he acted to the best of his judgment was rejected as he did not take the precautionary measures that common foresight and precaution would suggest.[60]
2.31 However, while the standard is objective, it does not prohibit consideration of certain particular capacities of the plaintiff.[61] The "reasonable person" test makes allowance for physical infirmities if they are substantial and capable of reasonably certain proof.
2.32 The phrase, "in the circumstances" in the proposed test[62] is intended to take into account those factors which cannot be divorced from the facts of the case. The law could not fail to do otherwise; the frequently quoted example is that a blind person will not be required to see.[63] We cannot therefore impute to the blind person knowledge of the cracks in his wall which were signs of serious structural defects. The plaintiff's blindness will be one of the "circumstances" in which the reasonable person finds himself. The standard to be applied here is that of the "reasonable person who is blind," and the question becomes whether the "reasonable person who is blind" would have got the house surveyed by a friend or an expert. Admittedly this phraseology is cumbersome. However it is employed so as to demonstrate that the circumstances which may be taken into account in applying the test are circumstances such that, if they were taken out of the factual basis, then the actual situation would take on a different dimension so that it would have to be differently assessed.
2.34 In McComiskey v. McDermott [64] Henchy J refers to the standard of care which is to be expected from a reasonably careful person "in the circumstances." Although this case involved the test of liability of the defendant and not the limitations regime applying to the plaintiff, it is still relevant as it is essentially the same test. What is meant by this phrase, according to McComiskey , is that the "particular circumstances dictate the degree of care required". The degree of care demanded is "particularised and personalised by the circumstance of the case".[65] In this case, the plaintiff and the defendant were in a motorcar rally, the defendant was driving, and the plaintiff was his navigator and passenger in the car. The car overturned and the plaintiff was injured when the defendant rounded a bend and, to avoid a collision with two parked cars, drove his car into the ditch. The plaintiff instituted proceedings for damages for negligence against the defendant. In applying the test in that particular case, Griffin J commented that the duty of care owed by the defendant was to drive the car as carefully as a reasonably prudent competitive rally driver could be expected to drive in the circumstances . The circumstances, as Griffin J elaborated, were factual ones, such as the competition they were in and the requirement to maintain a certain speed. As we can see, the crucial fact that the defendant was a rally driver was also one of the circumstances, in that the reasonable person in this application also is taken as a rally driver.
2.35 In the examples we have just seen, the reasonable person is alternatively a blind person or a rally driver and the law adjusts its standards to cater for the circumstances. However this subjectivity is permitted only to the extent that those circumstances or characteristics cannot be divorced from the situation at hand. The nature of the issue to be decided would be different if the appropriate circumstances and characteristics were not taken in to consideration.
2.36 However the standard is considered to be an objective one in that little peculiarities or foibles will not be tolerated: the reasonable person does not possess these. The reasonable person is not naïve or unobservant. He "is always up to standard, he is the careful man being careful...he is dehumanised."[66] Thus even where the plaintiff is not an engineer, has no interest in DIY and the like, he would still not be excused for taking no action in response to the rapid spread of a large damp green mouldy patch on his wall. The reasonable person would have taken some action. He would have known something was wrong, because he would have used his standard intelligence to draw from his store of standard past experience.
2.37 As we have seen the test established by the English Latent Damage Act, 1986 also uses the "reasonable person" measure.[67] In the English case of Higgins v. Hatch & Fielding, [68] the plaintiffs were suing the surveyors for a negligent valuation. They took the action several years after they received the engineer's report which showed the valuer's report to be wrong, as they did not realise until then that they had a remedy against the surveyors. It was held that the limitation period would run from the date when the plaintiffs received the report, as a reasonable person in the light of the content of the structural report would have taken advice as to from whom he could seek a remedy. The circumstances giving rise to the delay were not taken into account in the decision. In another English case with a similar outcome, the plaintiff was an illegal immigrant at the time when his cause of action in negligence arose. He commenced proceedings only later, when his status had changed and argued that because he was in fear of the law, it was reasonable to postpone seeking advice. It was held that, although his conduct was understandable, it was not reasonable.[69]
2.38 The exact scope of this latitude has always been dealt with by the courts
on an individual basis and it is considered that it would be neither helpful
nor possible to enlarge further on this here. Suffice it to say for the moment
that the standard of the "reasonable person" will accommodate the plaintiff's
superior knowledge, intelligence and experience, so that the engineer will be
expected to infer the appropriate facts from the cracks on the walls of a house
sooner than the ordinary householder lacking in such professional experience.
C. The Discoverability Formula
(i) Scope of the Discoverability Formula
2.39 It is envisaged that the discoverability formula would be applicable to
all actions for breach of duty whether the breach occurs in tort, contract,
statute or independent of any such provision.[70]
However the Commission is of the view that the
discoverability limitation period should not apply to actions for libel,
slander, and injurious falsehood.
2.40 The Commission recommends that the discoverability limitation period
should be applicable to all actions for breach of duty whether the breach
occurs in tort, contract, statute or independent of any such provision, except
that this should not include actions for libel, slander, and injurious
falsehood.
(ii) Elements that Trigger the Discoverability Limitation Period
2.41 Having set out what is meant by actual and constructive knowledge, we now
focus on two relevant facts of which there must be knowledge. In the next
section, at para.2.51 we shall deal with the remaining factors after setting
out the two alternative frameworks which will shape these factors.
Knowledge of Loss / Damage
2.42 First, what is loss or damage? The Commission is of the view that, save in the limited narrow sense indicated in paras.2.39-2.40, it would be too audacious to attempt to define damage. There are so many variations of damage, that to define it would only serve unnecessarily to restrict the scope of loss or damage.
2.43 Secondly, if knowledge of even minimal loss or damage on the part of the claimant was sufficient to trigger the discoverability limitation period, it would inevitably cause hardship to numerous plaintiffs. This would be so particularly in construction cases where the full significance of a minor hairline crack might not be evident for four or five years.
2.44 The Commission is thus of the view that the discoverability formula should be so drafted as to prevent trivial damage, or significant damage which would appear trivial to the reasonable person, from triggering the limitation period.[71] The requirement is not directed at the claimant's evaluation, but is an objective requirement and therefore, does not need to be defined. In fact it would be impractical to try to define it as the circumstances will vary considerably depending on the situation.[72]
2.45 The formula used in the Statute of Limitations (Amendment) Act, 1991 in respect of personal injury incorporates this requirement. In s.2(b), knowledge "that the injury was significant" is necessary in order to trigger the discoverability limitation period. We do not recommend the use of the term "significant", the difficulties encountered in connection with this term in the 1991 Act have been discussed earlier.[73]
2.46 In this regard we prefer the phrase used in the
Alberta Limitations
Act, 1996
;
" that the loss, assuming liability on the part of the defendant, warrants
bringing proceedings".
D. Drafting
(i) The Two Options:
2.47 We set out here the two alternative models for our recommended draft. The
draft legislation is set out in Appendix 1.
Statute of Limitations Act (Amendment) 1991 Model
2.48 The first option is to follow the same scheme as the Statute of Limitations (Amendment) Act, 1991. There are however important differences in the wording. The key words "or in the circumstances ought reasonably to have known"[74] have been added to it; the form of words "the loss warrants bringing proceedings" has been substituted in place of "the injury was significant";[75] the wording has been adjusted to reflect the fact that the central concern of the provision is damage to property not injury to the person. With adjustments of this type, the model is as follows:
1. (1) For the purposes of any provision of Part II of this Act whereby the
time within which an action in respect of loss or damage may be brought depends
on a person's date of knowledge, references to the person's date of knowledge
are references to the date on which he first knew, or in the circumstances
ought reasonably to have known:
(a) that the damage for which the person seeks a remedy had occurred;
(b) that the damage, assuming liability on the part of the defendant, warrants
bringing proceedings,
(c) that the damage was attributable in whole or in part to the act or omission
which is alleged to constitute the breach of duty in tort, contract, statute or
independent of such provision,
(d) the identity of the defendant, and
(e) if it is alleged that the act or omission was that of a person other than
the defendant, the identity of that person and the additional facts supporting
the bringing of an action against the defendant;
and knowledge that any acts or omissions did or did not, as a matter of law,
involve a breach of duty is irrelevant.
(2) For the purposes of this section, a person's knowledge includes knowledge
which the person might reasonably have been expected to acquire:
(a) from facts which are or in the circumstances ought reasonably to be
observable or ascertainable by the person, or
(b) from facts ascertainable by him with the help of appropriate expert advice
which it is reasonable for the person to seek.
(3) Notwithstanding subsection (2) of this section a person shall not be fixed
under this section with knowledge of a fact ascertainable only with the help of
expert advice so long as the person has taken all reasonable steps to obtain
(and, where appropriate, to act on) that advice.
2. (1)An action claiming damages in respect of loss or damage (other than
personal injury) caused by a breach of duty whether the duty exists in tort,
contract, statute, or independent of any such provision, shall not be brought
after the later of either the expiration of:
(a) six years from the date on which the cause of action accrued; or
(b) three years from the date of knowledge of the person who has suffered the
loss or damage.
2.49 The advantage of the 1991 model is that because the format is the same as
the 1991 Act, it prevents further fragmentation of an already fragmented
limitations legislation. There is a risk that, by changing the structure of the
model, the different format of the two models may be used by lawyers to create
loopholes that are not intended. It is however unnecessarily complex and its
interpretation has caused difficulty. It is on this ground that it has been
criticised, as has the
English Limitation Act, 1980
on which it is
based.
Alberta Model
2.50 The second option is along the lines of the
Alberta
Limitations
Act, 1996
with the addition of "reasonably" in s.1(a) to spell out the
blend of objectivity and subjectivity.
(1) An action claiming damage in respect of loss or damage (other than personal
injury) caused by a breach of duty whether the duty exists in tort, contract,
statute, or independent of any such provision, shall not be brought after the
later of either the expiration of:
(a) six years from the date on which the cause of action accrued; or
(b) three years from the date on which the person first knew or in the
circumstances ought reasonably to have known:
(i) that the loss for which the person seeks a remedy had occurred;
(ii) that the damage was attributable to the conduct of the defendant; and
(iii) that the loss, assuming liability on the part of the defendant, warrants
bringing proceedings.
(ii) Comparison of the Two Models
2.51 The key phrase "first knew or in the circumstances ought to have known" is common to both models. However there are salient differences in presentation and drafting between the two models. These are examined below.
1. In line with the traditional common law approach, the 1991 Act uses a preliminary provision to provide a definition of the key term, "date of knowledge", which it then utilises in the subsequent operative section. By contrast, the Alberta model does not employ any such term or definition; but states the substance of the definition as part of the operative provision. The result is that the Alberta model gives in a single section, the material which the 1991 Act takes two sections to rehearse. Since our draft will use the concept represented by the term 'date of knowledge' only once, we do not see any advantage in employing a term of this or a similar type and taking a separate provision to define it.
2. The Alberta provision enumerates in (i)-(iii) the three factors about which
the claimant ought to know. By contrast, the 1991 model lists five items at
(a)-(e). The additional paragraphs are as follows:
"(d) the identity of the defendant;
(e) if it is alleged that the act or omission was that of a person other than
the defendant, the identity of that person and the additional facts supporting
the bringing of an action against the defendant;"
In comparison the Alberta model uses the phrase "attributable to the conduct of
the defendant". The Alberta Law Reform Institute interprets the
"attributability" requirement as meaning: "The discovery period will not begin
until the claimant first knew that his injury was to some degree attributable
to the conduct of the defendant."[76]
Accordingly the requirement embraces both attributability and the identity of
the defendant.[77]
In addition, the scope of
the term "attributable" is sufficiently wide to encompass a situation where the
defendant is vicariously liable.
3. The 1991 model specifies that "knowledge that any acts... did or did not as a matter of law, involve a breach of duty is irrelevant". There is no equivalent of this in the Alberta Act. We also take it that the fundamental legal axiom that a person can get no advantage from ignorance of the law goes without saying.
4. Under the 1991 model, knowledge which the person could reasonably be expected to acquire "from facts which are or in the circumstances ought reasonably to be observable or ascertainable by the person" is expressly imputed to that person. There is no such phrase in the Alberta model. The same idea is, however, implicit in the key phrase in the Alberta model: "ought reasonably to have known". Therefore, bearing in mind the need to keep the legislation as simple as possible and consonant with the meaning it is intended to convey, we believe that it is not necessary to spell it out again.
5. The 1991 model imputes knowledge to the person "from facts ascertainable by
him with the help of appropriate expert advice, which it is reasonable for the
person to seek". But it continues "a person shall not be fixed under this
section with knowledge of a fact ascertainable only with the help of expert
advice so long as the person has taken all reasonable steps to obtain (and,
where appropriate, to act on) that advice". It seems to us that these
provisions are covered by the key phrase in the Alberta model: "in the
circumstances ought reasonably to have known".[78]
This phrase clearly indicates that if a claimant has a
suspicion that (say) the building is unsafe, he should have it checked out with
say a local engineer. However, if that engineer gives it a clean bill of health
the claimant is not expected to consult the Professor of Building Materials at
the Massachusetts Institute of Technology. It should be added that while expert
advice is often sought in personal injury cases, this is less often the case in
situations in which the damage is sustained in the non-personal injury
field.
(iii) Conclusion
2.52 In view of the above considerations, the Alberta model is the model preferred by the Commission. Our preference can be explained on the following basis. In contrast to the 1991 model, the Alberta model is drafted in plain language in line with the standards recommended in our Statutory Drafting Report.[79] It is simple and easily comprehensible to the average litigant. Furthermore, having compared the 1991 model and the Alberta model, we believe that it is no less comprehensive than the 1991 model. Also in respect of the future consolidation of limitations legislation, it represents a move away from the traditional to a simpler and better construction.[80]
2.53 Until there is a redrawing of the entire limitations law[81]
the legislation we propose will be part of the same code
as the 1991 Act. It might be argued, therefore that there is a danger that a
judge interpreting legislation based on our draft might infer from the
differences in drafting and format that a substantive change is intended even
where this is not the case. This is unlikely to occur because the format breaks
totally with that in the 1991 Act, and there is nothing to indicate that the
1991 Act ought to be used as a basis for comparison. Indeed there is a danger
that if the 1991 model were used it would signal that the 1991 Act ought to be
used as a basis for comparison; whereas, as we indicate at para.s2.45-2.46, we
intend for substantive reasons, that there should be a marked difference.
However, as a precautionary measure, we recommend as clause 2(5) of the draft
legislation:
"The Law Reform Commission Report (LRC-64, 2001) may be considered by any court
when interpreting any provision of this Act and shall be given such weight as
the court considers appropriated in the circumstances."
2.54 The Commission recommends that the Alberta Limitations Act, 1996 model
be taken as the model for the drafting of the discoverability test, which is
contained in Appendix 1. The Commission also recommends that the clause set out
in the previous paragraph be included in the interpretations section of the
draft.
F. Application of the Discoverability Test in Practice
2.55 The main impact of the introduction of a discoverability test for latent
damage in non-personal injury cases will be in the construction industry and in
professional negligence claims. In order to illustrate how the test would work,
we set out below some examples.
Example 1
2.56 A purchases a house from B, the builder, in 2000. In 2001, A notices some
slight cracks in the living room walls and contacts the builder who informs A
that they are just settlement cracks. Six years later, in 2007, one of the
cracks becomes noticeably large after a small tremor, measuring 2 on the
Richter scale. A mentions the matter to a friend who is an engineer and he is
of the opinion that A should pursue the matter and have a proper survey. A
however does nothing. In 2008, he wishes to sell the house and is informed by
the surveyor for a prospective buyer that there are major structural defects in
the foundations and the house is slowly subsiding. In 2008 A goes to his
solicitor to see what recourse he has to recover for the loss in value of the
property.
Action in Tort
The cause of action at present in tort accrues in 2001 upon the some damage
materialising. Therefore, under the current law, A has until 2007 to take
action. However under the test we propose, A arguably did not know that the
loss had occurred in 2001. It is likely that he could be deemed to have
constructive notice only in 2007. Although it would be a matter for the judge
to decide whether a reasonable person in the circumstances (therefore including
the fact that he had spoken to a friend who was an engineer) should have known
(i) that some damage attributable to the construction of the house had occurred
and (ii) that it was sufficiently significant. Thus A would probably have three
years from 2007, up to 2010, to institute proceedings.
Action in Contract
The cause of action in contract accrues in 2000 upon the purchase of the house
(assuming there was no other term in the contract to the contrary). Under the
current law, A has until 2006 to bring an action for breach of contract.
However under the proposed test, the limitation period would not start running
until 2007, giving him again until 2010.
Example 2
2.57 Z purchases a building in 1998. Having investigated the title, in 1998
Z's solicitor S advises Z to pay the balance of the purchase money. Z believes
himself to have purchased a leasehold interest which carries a statutory right
to acquire the freehold estate, while in fact the premises are held under a 99
year lease with 30 years left to run and no statutory entitlement concerning
the freehold. It is not until 2005, when he decides to sell the premises and
instructs another firm of solicitors to act for him, that this is brought to
his attention. Z immediately institutes proceedings against S.
Action in Tort & Contract
Z's cause of action in tort accrues when the damage occurs; in 1998. Z's cause
of action in contract accrues at the date of the breach; 1998. Therefore the
proceedings instituted in 2007 are statute-barred. They ought to have been
instituted before the relevant date in 2004.
Under the discoverability test Z cannot reasonably have been expected, in the
circumstances, to become aware of the loss which occurs before 2005. The
limitation period would start running in 2005 and Z would have until 2008 to
bring proceedings in both tort and contract.
Example 3
2.58 M engages S, a firm of solicitors, to apply for planning permission for a
site in 1993. In 1993, outline planning permission is granted and in October
1993 M purchases the site for £150,000. In 1997 M is notified that a
certificate required had not been lodged with the application for planning
permission and, accordingly, that the permission is void. M instituted
proceedings in 2001 against S.
Action in Tort & Contract
1993 is the date the cause of action in negligence accrued (in economic loss
cases the cause of action accrues when the plaintiff suffers a significant loss
for which he can sue). Clearly at present the proceedings instituted by M in
2001 are statute-barred.
In regard to the claim for breach of contract, it also accrued in 1993: the
cause of action at present would be statute-barred before 2001.
Under the proposed discoverability test, M only became aware of the loss he
suffered in 1997 when he was notified of the failure to lodge the certificate
causing the planning permission to be void. He could not reasonably have been
expected to ascertain this at an earlier date. It is therefore at this date
that time would start to run. M instituted proceedings in 2001 but under the
discoverability test time would have been up in 2000, so his proceedings would
have been statute-barred anyway even under the extended period given by the
discoverability test.
CHAPTER THREE: DISCOVERABILITY & ACCRUAL
3.01 In this brief chapter, we consider two options: (a) whether the present accrual standard should be retained, with the discoverability test as an alternative to it; or (b) whether a discoverability test should be the sole test for the law of limitations.
3.02 In the provisional recommendations in our
Consultation Paper
some
Commissioners expressed a preference for (b)discoverability as the sole test,
since it would obviate the complexity involved in the initial ascertainment of
accrual, followed by the application of a discoverability test, with a
calculation as to which event is later. Option (b) has much to recommend it in
terms of simplicity and certainty in the law. However, in the final analysis,
and taking into account the terms of the Reference from the Attorney General
which refers to the limitation period "in circumstances where the loss is
latent", the Commission is of the opinion that the discoverability test should
be introduced to deal only with latent loss. Thereby retaining for the
plaintiff any advantage stemming from the accrual limitation period in cases of
obvious or patent loss and indeed in certain latent damage cases. While it can
sometimes be difficult to ascertain the date of accrual, it happens that this
difficulty particularly arises where the loss is latent. The date of accrual of
the cause of action, as the trigger by which the limitation period is begun,
generally works well in cases of patent or obvious loss, since this date does
not usually differ from the time of the discovery of the damage. We do not see
any justification for recommending the abolition of the date of accrual as the
start of the limitation period for cases of patent loss.
3.03 This conclusion is also influenced by the desirability of consistency in the law and cohesiveness between the different limitation periods which exist for different types of action. As the date of accrual still governs the general law of limitations outside the scope of the present Report, the Commission believes it would be inappropriate to advocate an entirely separate regime for patent loss in tort and contract (excluding personal injury). This is without prejudice to the general opinion within the Commission that the entire law of limitations is in need of examination with a view to reform.
3.04 Finally, it may appear to be necessary to justify a test, like (a) above,
which appears to give a plaintiff the best of both worlds. The response to such
a perceived difficulty is that, even if the cause of action were discoverable
and yet, for some reason, the plaintiff failed to take action within three
years from the date of discoverability, the defendant would still be no worse
than under the present law.
3.05 The Commission recommends the following test: the plaintiff may take
action within six years from the accrual of the cause of action (present
position); or three years from the date the cause of action is or ought to be
discoverable by the plaintiff,
whichever expires later.
3.06 The practical effect of this dual test may be illustrated by the following examples: if the criteria for the discoverability test is fulfilled two years after accrual, then the four remaining years of the normal six-year limitation period would nevertheless continue to run. If discoverability occurs only four years after accrual then the two remaining years of the normal six year period would run with one year added to make up the three year period provided under the new alternative. If, as in our illustration below, the discoverability does not occur until after the six year period commencing at accrual has expired, the three year period would begin at the time of discoverability, subject to an overall long-stop limitation period.[82]
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
10 year Long-stop Limitation Period |
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3 year Discoverability Limitation Period |
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6 year Accrual Limitation Period |
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
year
CHAPTER FOUR: THE LONG-STOP
4.01 The second main recommendation of the Commission stipulates an ultimate limitation period, commonly referred to as a `long-stop' period, beyond which no claim can lie. In the Consultation Paper the Commission provisionally recommended the introduction of a long-stop limitation period of fifteen years from the date on which the cause of action accrued. Essentially, this would mean that upon the expiration of fifteen years from the accrual of the cause of action, any claim would be statute-barred and for most purposes effectively dead. The central point is that this rule would apply even if the damage was not discoverable and the extra three years under the discoverability test had not elapsed.
4.02 The purpose of a long-stop is to achieve certainty in the legal system. This function takes on particular importance where the existence of a discoverability test permits more latitude as to when the proceedings may be instituted. The introduction of a long-stop in this jurisdiction is not without precedent. The Liability for Defective Products Act, 1991 provides for an ultimate limitation period of ten years from the date on which the product was first put into circulation.[83]
4.03 In two previous Law Reform Commission Reports on various limitation issues, the concept of a long-stop was rejected.[84] Both of these Reports however dealt with personal injuries and, as the Commission noted in the Consultation Paper, "in cases of personal injury, the right of the plaintiff should be ascribed a greater weight than that of a defendant - at least as an initial point of departure."[85]
4.04 The recommendation in favour of a long-stop limitation period in the
present context therefore represents a new departure. The issue generated
considerable interest and comment during the consultation process both in
respect of whether there should be a long-stop at all and, if there should, as
to the appropriate length of time. The arguments for each side will now be
discussed, dealing, first with whether to have a long-stop; and then, with its
length.
I. Whether to have a Long-Stop
4.05 Arguments in favour of a long-stop essentially stem from concerns regarding the best framework within which justice can be achieved and economic concerns arising from the costs of defending an action for latent damage, or even taking precautions against the possibility of such a claim.
4.06 They are not, basically, dissimilar from the general arguments in favour of limitation periods, canvassed in the Introduction. Difficulties in regard to collecting evidence, locating witnesses and retrieving documentation will all increase as time goes by. Justice requires that each side be afforded the opportunity to adequately present its case. Plaintiffs must only prove their case on the balance of probabilities in civil law. The more time which is allowed to pass before proceedings are instituted, the more difficult it may be for the defendant to gather witnesses and evidence. While the law should seek to accommodate the plaintiff's claim, this ought not to be at the expense of the defendant's rights and it is important that a balance be preserved between the two parties.
4.07 With regard to the difficulty in locating records and evidence, the current practice in the construction industry is to retain records for a minimum of six years after the Final Certificate of completion in the case of a simple contract, and twelve years for a contract under seal. For condition-reports, and other like purposes, documents are usually kept for six years. The introduction of a discoverability test without a long-stop period would make it necessary to keep these documents indefinitely. Each potential case involves many documents involving the storage of voluminous amounts of files with associated costs. A further consequence of discoverability without the limit of a long-stop would be the necessity to extend personal indemnity insurance coverage. Currently, upon ceasing practice, independent professionals usually maintain such insurance for a run off period of six years.
4.08 These factors point to a considerable increase in the overheads of the defendant, which, it is argued, would be passed on to the consumers who purchase goods or services from that defendant. To justify the increased expenses and risk of injustice to the defendant, there would have to be a compelling justification. This was found to exist in the case of personal injuries. However the same justification does not arise here, given the inherent differences pointed out earlier,[86] between claims for personal injuries and claims for material loss.
4.09 The utilitarian approach suggests that the defendant should be protected, and the costs avoided, at the point of balance where the gain to potential plaintiffs becomes less in comparison with the cost to the potential defendants and, through insurance, to the community. It is at that time that justice would be best served by the introduction of a long-stop.
4.10 On the other hand, against the introduction of the long-stop it could be argued that in some cases the nature of the defects which may arise are such that a long-stop would undo the good of introducing a discoverability test because the loss resulting from the latent damage to the plaintiff would exceed any costs incurred by commercial enterprises in bearing the responsibility of providing for these eventualities.
4.11 Another counter argument might be to the effect that a long-stop is not
necessary because equitable use of judicial discretion is sufficiently
developed in this country to deal adequately with those cases where there is an
extreme lapse of time.[87]
The courts have an
inherent "jurisdiction to dismiss a claim in the interests of justice where the
length of time which has elapsed between the events from which it arises and
the time when it comes for hearing is in all the circumstances so great that it
would be unjust to call upon a particular defendant to defend himself".[88]
In the few cases, where the court has
dismissed such a claim in the interests of justice, the period of limitation
which elapsed since the cause of action arose was 24 years; the limitation
period is extended under s.72 of the
Statute of Limitations,1957
where
the plaintiff is a minor. In cases where the normal limitation periods apply,
there is less of a risk of injustice. Thus the fact that the delay is
inordinate and inexcusable alone may not be sufficient to strike out the
proceedings. However, if the plaintiff is also guilty of such delay in
prosecuting the proceedings, the courts are willing to exercise their
discretion to dismiss a claim for want of prosecution.[89]
The principles applied by the courts when considering an
application to dismiss a claim for want of prosecution are set out in
Primor
plc v. Stokes Kennedy Crowley
.[90]
The
length of time elapsing prior to the delay is an important factor to be taken
into account.[91]
We are of the opinion that a
long-stop is preferable to relying on judicial discretion as over-reliance on
judicial discretion would result in endemic uncertainty.
Conclusion
4.12 We are of the opinion that, in non-personal injury cases, the need for
certainty in the law and also the economic considerations, which affect not
only the defendant but society in general, are of greater weight when pitched
against the purely economic claims with which we are dealing. In such cases, we
are essentially weighing up two economic interests: that of the plaintiff in
being able to bring a potential action; and that of the defendant in having to
maintain insurance cover indefinitely (which can be significant, especially in
construction cases) or bear the risk if he does not, as well as the costs
inherent in storing the relevant documents. In addition, underlying the
consideration of these opposing interests is the overriding concern of ensuring
certainty and confidence in the law.
II. Length of The Long-Stop
4.13 Many of the reasons advanced in the preceding section also apply in respect of length. Strong representations were made at our seminar to the effect that the long-stop period should not be 15 years based on the evidentiary difficulties already referred to and the increased insurance costs.[92] Both a 10 and a 12 year long-stop were suggested.
4.14 The question is how long after the event do the number of plaintiffs wishing to take claims become fewer. In Ireland the Law Reform Commission carried out a survey among medium sized solicitors' firms located outside Dublin. Most solicitors who completed the survey said that they had never come across non-personal injury claims involving latent damage which had only become known after the limitation period had expired. German and French studies on latent defects in the construction industry indicate that only 20-25% of defects appear longer than 5-6 years after accrual. The Aachener Institute[93] study revealed that 80% of defects, especially serious ones, appear during the first five years and the Agence Qualitel[94] study concluded that 75% of defects appear before 6 years have elapsed. The National House-Building Council, which is essentially the UK equivalent of the Irish HomeBond Scheme,reports that defects tend to become manifest in years 6 and 7. HomeBond[95] gives cover for 10 years which could be seen as a further indication that after this period new problems are unlikely to arise.[96]
4.15 It appears from the above analysis that a 10 or a 12 year long-stop period
would offer adequate protection to a plaintiff in the majority of cases. Some
Commissioners were in favour of the 12 year period as it is more generous
towards the claimant. Also it is consistent with the limitation period for
contracts under seal. On the other hand the advantage of 10 years[97]
is that it is consistent with: the growing
trend in the construction sector to take out ten year insurance cover;[98]
the legislation on Product Liability;[99]
and the HomeBond[100]
guarantee scheme. On balance most Commissioners decided
in favour of a 10 year long-stop period.
4.16 The Commission recommends that the length of the long-stop should be 10
years.
4.17 Thus while the maximum period in which an action in contract can normally be brought would be 10 years from the date of breach, if the contract is under seal[101] the limitation period would be 12 years. Law Reform Commissions in other jurisdictions have suggested that there should not be a longer period for instruments under seal on the basis that: "Most acts which may be done by deed may also be done by simple contract. The one exception is a promise to pay money which is not supported by consideration. There seems to be little justification for a longer litigation period with respect to gifts of money made under seal than with respect to ordinary debts."[102] The Law Reform Commission of Western Australia[103] expressed the view that, if the only function of the special rule in relation to contracts under seal is to provide a means of fixing a longer limitation period, the distinction between contracts under seal and simple contracts is not justifiable, as there is no obstacle to prevent parties from contracting for a longer limitation period in a simple contract. This reasoning was also supported by the English Law Commission in their recent Consultation Paper .[104]
4.18 However it is reasonable to assume that where a contract is under seal,
the parties understand and desire that the well established 12 year period
should apply. For this reason the Commission is reluctant to recommend change
in an area where there is already certainty and a long tradition of commercial
practice.
III. Starting point of Long-Stop
4.19 The choice is between: the date of accrual of the cause of action; or the date when the harmful act or omission took place. It is argued in respect of the latter, that it makes the starting point much clearer as the problems associated with the determination of the date of accrual are avoided.[105] Consequently there would be an increased level of certainty for parties to a transaction. The other advantage, is that it would provide a common starting point for the long-stop for claims in both tort and contract. [106] As against these advantages, however, there exists the possibility that the long-stop limitation period will have commenced before the cause of action has accrued and the plaintiff has a right to bring proceedings.
4.20 On the other hand the date of accrual is the logical starting point as it
is only at this point that a plaintiff will have a complete cause of action.
The date of accrual is an established concept, on which there has been much
discussion and case-law. Moreover, as the Commission has recommended the
retention of the current six year limitation period commencing at the date of
accrual, it would be convenient to have the date of accrual as the starting
point of the long-stop. The introduction of a third commencement date for the
long-stop would only further complicate the calculation of limitation
periods.
4.21
The Commission recommends that the long-stop start at the date of
accrual of the cause of action.
IV. Illustration
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
10 year Long-stop Limitation Period |
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Dateof Discoverability |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6 year Accrual Limitation Period |
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
Year |
|
|
|
|
|
|
|
|
|
If there was no long-stop the discoverability limitation period would run to
the end of year 12. However, in the above example the long-stop prevents the
discoverability limitation period extending beyond year 10.
CHAPTER FIVE: CONSEQUENCES OF DISCOVERABILITY
This chapter considers the consequences, in particular situations, of the
introduction of a discoverability test.
I. Separate Incidents of Damage
A. The Present System
5.01 The problem under discussion here is the situation where there has been a tort resulting in separate heads of damage, A and B. When does the limitation period commence in respect of the later damage B: at the time of A; or at the time of B?
5.02 The concept of a cause of action[107] is the key element that in most cases triggers the limitation period. "A cause of action is every fact which it would be necessary for the plaintiff to prove if traversed in order to support his right to the judgment of the court."[108] In torts actionable per se the `gist of the action'[109] is the commission of the wrong[110] and not the damage. Consequently the limitation period starts to run from the date of the wrong.
5.03 Thus the problem only arises in connection with torts actionable on proof
of damage, such as negligence and nuisance where damage is the essential
element of the cause of action. We will examine the problem first of all on the
basis of the existing law - the limitation period starting to run from the date
of accrual.
(i) General Rule
5.04 The following is an illustration of where this problem might arise: P bought a house from a builder B in 1980. Cracks began to emerge in a side wall, which P noticed. In 1987 a major crack appeared in the foundations. P issued proceedings in 1990. The limitations period in respect of the cracks occurring in 1980, has expired by the time the plaintiff takes the action. The question arising is whether P can nevertheless sue in relation to the damage occurring in 1987.
5.05 The general rule here seems to be that the cause of action[111] accrues and time starts to run as from the date of the earliest item of damage.[112] Any damage occurring after the date of accrual is regarded as part of that cause of action. As Lord Halsbury put it in Darley Main Colliery Co v. Mitchell: [113] "A house that has received a shock may not at once shew all the damage done to it, but it is damaged none the less then to the extent that it is damaged, and the fact that the damage only manifests itself later on by stages does not alter the fact that the damage is there."
5.06 Therefore according to the general rule, the limitation period for both
sets of damage in the above example would start to run in 1980. Hence the
action in relation to the later damage would be statute-barred.
(ii) Possible Exceptions to General Rule
5.07 It is possible that there are two limitations to this proposition. The first is where there is more than one cause of action because a single act which is not actionable per se causes distinct damage on two separate occasions.[114] The second is where there is more than one cause of action because there is a continuing tort.
5.08 The first exception - where a single act causes distinct items of damage
on two separate occasions - has been interpreted as the `proper explanation'[115]
of
Darley Main
Colliery Co v.
Mitchell
.[116]
Here the excavation of
the plaintiff's land caused subsidence and a number of years later it caused
further subsidence. The new damage combined with the original wrongful act gave
a new cause of action with a fresh limitation period starting from the date of
the second subsidence. There has been limited support for this qualification to
the general rule in some Commonwealth jurisdictions. In
Jobbins v. Capel
Court Corporation
[117]
the
Federal Court of Australia, while applying the general rule to the facts of the
case, cited the following hypothetical situation as an example of where the
general rule might not apply:
"A simple example would be a false statement about the merits of a subdivision
leading, first, to the purchase of a particular block of land in the
subdivision, and, subsequently, to a separate purchase of another block of land
in the same subdivision. If the first purchase occurred more than three years
before the institution of proceedings, but the second purchase occurred within
that period, there is no reason a claim in respect of damage suffered by the
second purchase should be held to be barred."
5.09 At the other extreme, the New Zealand Court of Appeal in Mount Albert Borough Council v Johnson [118] treated subsequent damage flowing from the original damage as giving rise to a new cause of action. In this case, cracks appeared in 1967 and remedial work was done. Further cracking, occurring a number of years later, was held to create a new cause of action. It was held to be distinct from the earlier cracking, even though it was caused by the same acts of negligence. However it is unlikely that this approach will be followed in Australia[119] and it has been rejected outright in England.[120]
5.10 The second exception to the general rule, which is a continuing tort
(actionable only on proof of damage), has been illustrated most frequently by
nuisance cases. For example where there is constant loud noise caused by the
defendant which gradually renders the plaintiff deaf.[121]
A continuing tort consists of a course of conduct or a
series of actions or omissions so closely related as to amount to a course of
conduct. Where the tort is one actionable on proof of damage so long as the
damage is also continual, a cause of action continually accrues to the
plaintiff, or, if the damage is severable, each separate incident of damage
amounts to a separate cause of action. The practical consequence is that given
the possibility of a further action being brought, the court will not give
prospective damages. Damages will only be awarded for the loss suffered up to
the time that proceedings are instituted and a further action will be necessary
to recover the loss which occurs after this date.
B. Separate Incidents of Damage under a Discoverability Regime
5.11 Now let us consider the question of separate incidents of damage from the perspective of the proposed discoverability test. While it might be questioned whether this issue arises from the terms of reference, it is correct to regard it as at least incidental to them. One practical reason for saying this, is that in the English case-law, as can be seen below, the treatment of successive damage turned on the interpretation given to the Limitations Act, 1980 .[122] This would presumably be the case here too and so there is a need to give some guidance on this small, but real point.
5.12 In designing a law to regulate this situation, it is necessary to decide
whether the discoverability rule should be modelled on the existing law
relating to accrual, so that the limitation period in respect of each incident
of damage would run from the date of the first item of damage, or
alternatively, should a new rule be introduced on this point so that each
separate incident of damage would trigger a fresh limitation period. The
following considerations appear to be relevant:
(i) From the perspective of policy, this is a matter of trying to strike a fair
balance between the interests of defendants and those of plaintiffs. The
change to discoverability, in any case, moves the balance somewhat in the
plaintiff's favour. This is so because, under a discoverability regime, time
starts to run against him only when the earlier item of damage becomes
discoverable (when the plaintiff knows the damage is significant), rather than
as at present when it accrues. The implication of this difference is that the
plaintiff is on notice of the first item of damage, or, ought to know that
there has been damage, which is at least more than trivial. Thus, at least in
some circumstances, the position of the plaintiff has been improved in that he
has some chance to seek out the other head of damage which only becomes fully
discoverable at the later point.
(ii) Other jurisdictions,[123]
for example
England and Australia have applied the same rule to the discoverability test as
to accrual, with the effect that the cause of action is complete when the
initial damage becomes discoverable. Damage flowing from the same wrongful
act, which subsequently becomes apparent will form part of the original cause
of action. This is illustrated by
Horbury v. Craig Hall &Rutley.
[124]
In this case, the defendant, a
firm of chartered surveyors, provided the plaintiffs with a report on a
Victorian house in 1986, on which they relied to purchase the house. The report
failed to point out two defects which became apparent at different times.
First, in 1984 it was discovered that when the chimney was removed, the upper
portion was left unsupported in the loft. Second, in 1985 dampness caused the
plaintiffs to consult experts who reported that the property was infested with
dry rot. Applying the
Limitation Act
1980, s.14A, it was held there was
only a single cause of action arising out of the negligent making of the
report. Therefore both the claim in relation to the structural damage and in
relation to the dry rot formed part of the same cause of action. It was further
held that the plaintiff had "the knowledge required for bringing an action for
damages in respect of the relevant damage" in 1984 when she learned of the
defendants' negligence in failing to advise her about the matter of unsupported
remains of the partially demolished chimney stacks. Thus the cause of action
encompassing both claims was statute-barred since discoverability limitation
period commenced in 1984 and expired before the proceedings were commenced.
(iii) From the perspective of legal concepts, in the case of torts actionable
on proof of damage, the cause of action arises when the damage materialises.
Furthermore the limitation period applying to this cause of action shall apply
to all damage which either subsequently occurs or becomes apparent. Likewise
if a discoverability principle were to be adopted, the cause of action would
arise when the damage and the other elements of the cause of action become
discoverable. This is really a rule of public policy, although cast as a legal
dogma, aimed at preventing a defendant from being liable for a long and
indefinite period of time. However it appears, given the general assumptions of
the law on limitations, to be a reasonable policy, which there is no reason to
disturb, especially in the context of this Report, whose main thrust is in a
related field.
5.13 The Commission is of the opinion that the general rule to be applied
should be that the limitation period will start to run from the time the first
item of loss resulting from the wrongful act becomes discoverable, even in
respect of any other damage which becomes discoverable after that date. The
exceptions to the general rule
[125]
which apply in the context of accrual should also apply here to the extent
that they are accepted by the Irish courts.
5.14 Thus having considered the rule from the three perspectives set out above
and concluded that it should also apply to the proposed discoverability
provision, we can apply it to the example at para.5.06, on the assumption that
the law has been changed so that it is possible for P to invoke the
discoverability test. The facts were that P bought a house from a builder B in
1980. Small cracks begin to appear in a side wall in 2000. In 2007, a major
crack in the foundations becomes discoverable. P issues proceedings in 2010. If
the small cracks became discoverable to P in 2003 should the discoverability
time period for the cracks in the foundations also start to run at this time.
Based on the fact there is only one cause of action arising from the negligent
act and the general rule that the discoverability limitation period will start
to run from when the first item of damage becomes discoverable, the limitation
period would probably start to run when the small crack became discoverable by
P in 2003.
II. Subsequent Purchasers
A. Subsequent Purchasers under the Present Regime
5.15 Before addressing the main question here, a brief digression is made in
order to explain a rule which has caused much difficulty in England and to
establish whether it exists in Irish law or not.
The rule that a person who is not the owner of the property when the cause
of action
accrues, cannot sue.
5.16 It is well established that everyone concerned with the design and
construction of a building owes a duty in tort to a class of persons, not just
to the person with whom they contract; the class being the original owner and
his successors.[126]
However, at common law
in England there is a rule which is relevant to a claim by a subsequent
purchaser, namely that a person who is not the owner of the property when the
cause of action accrues cannot sue.[127]
The
rule was set out in the context of builders and subsequent purchasers by Lord
Denning in
Sparham-Souter
.[128]
Newey
J in
Perry v. Tendring
,[129]
relied
heavily on this decision when applying the rule:
"I think that it follows from the words of Lord Denning and Roskill LJ in
Sparham-Souter
, which I have quoted, and which were not disapproved in
Pirelli
and from Lord Fraser's words in
Pirelli
that when damage
to a building occurs its owner acquires a cause of action immediately, even
though he is not aware of it, and that unless he assigns that right of action,
when agreeing to convey or conveying the building to a successor, or possibly
transferring occupation of it to him, the successor has no right to sue."[130]
Thus, as the cause of action has already accrued when the subsequent purchaser
took possession, he has no right of action against the builder. There had not
been a contractual assignment of the cause of action and Newey J ruled out the
possibility of a cause of action in tort passing with the legal or equitable
title to the property. As a consequence of this decision the position of
subsequent purchasers against the builder was greatly weakened.[131]
5.17 This rule had to be uprooted in England, by s.3 of the Latent Damage Act, 1986, which states:. "a fresh cause of action shall accrue to the ...[subsequent owner] on the date on which he acquires his interest in the property". The question relevant here is whether this English common law rule exists here, in its unreformed vigour, and, if so, whether it ought to be removed or altered.
5.18 It bears noting, in the first place, that "this rule has not been accepted
outside England."[132]
From an Irish
perspective, this rule does not appear to have been expressly considered by the
Irish Courts. In
Colgan v Connolly Construction
Co
(Ireland)
Ltd
[133]
where McMahon J states that
"the principle of
Donoghue v. Stevenson
applies to the relationship
between builder and subsequent occupier" he did not distinguish between defects
which manifested themselves during the ownership of the subsequent purchaser
and the first purchaser. Also indicative that this rule does not exist in
Irish law is its non-appearance in the seminal case of
Ward v.
McMaster
,[134]
where although the
plaintiff was the first purchaser, the builder had lived in the house for 6
years before selling it and it was during this time that the damage occurred.
When finding that a duty of care was owed by the builder Costello J stated:
"There are no facts here arising under contract or otherwise that require that
that duty should be restricted or limited in any way: in particular, I do not
consider that the duty is in any way affected by the fact that instead of
selling it immediately after its completion, the defendant resided in it
himself for a number of years."[135]
This conclusion was not criticised by the Supreme Court.
5.19 The absence of such a rule in Irish law would be in line with the modern
trend in Irish law by which the Irish courts, as McMahon & Binchy[136]
remark, are "more willing than the House
of Lords[137]
to embrace the `neighbour' and
`proximity' principles espoused in
Donoghue v. Stevenson
and
Anns v.
Merton
."
5.20 It appears that there is no substantive rule in Irish law which
prevents a claim in tort for damage to property, where the plaintiff had no
interest in the property at the time
of the damage being inflicted.
Nonetheless we recommend legislation to this effect.
Subsequent Purchasers and the Accrual Limitation Period
5.21 Accordingly, it is necessary to consider, from the perspective of the present limitations regime, the situation where the original purchaser transfers property to the subsequent purchaser. Two situations are distinguishable. First, if when the subsequent purchaser comes into possession the cause of action has not yet accrued, then the 6 year limitation period will not start to run against him, until the cause of action accrues. The second situation, where the limitation period has already begun to run against the predecessor purchaser, is the one which concerns us. The question which arises here, whether the limitation period commences afresh for a subsequent purchaser, or whether he simply acquires the property with the limitation period running against him.
5.22 If the limitation period were to commence afresh against a subsequent
purchaser it would mean that:
"[i]f the property happened to be owned by several owners in quick succession,
each owning it for less than six years, the date when action would be
time-barred might be postponed indefinitely... I think the true view is that
the duty of the builder and of the local authority is owed to owners of the
property as a class, and that if time runs against one owner, it also runs
against all his successors in title . No owner in the chain can have a better
claim than his predecessor in title."[138]
Therefore the present law seems to be that where a cause of action accrues
under the predecessor owner it does not and should not commence afresh but does
and should continue to run against any subsequent owner.
B. Claim by a Subsequent Purchaser, under a Discoverability
Regime
.
5.23 An analysis is now made of the situation of a claim by a subsequent purchaser in the context of the discoverability limitation period proposed in this Report. Again, two situations are plainly distinguishable. The first arises if the damage becomes discoverable only when the house is owned by the subsequent purchaser. There is no difficulty here as the limitation period would begin to run from the point of discoverability. The second and more difficult situation arises, when the damage was discoverable by the predecessor owner. This is illustrated by the following example. P purchases a house from V and there are latent defects in the house caused by the builder: assume that these defects are discoverable by V but he has done nothing about them when he sells the house to P. Should the limitation period begin to run against P only when he could have discovered the defects; or from the time at which V could have discovered them?
5.24 A precise analogy cannot be made with the corresponding situation under
the accrual limitation period because the knowledge of the actual plaintiff is
fundamental to the application of the proposed discoverability regime. This
difficult situation has to be looked at from two perspectives. First from the
perspective of the defendant: if the limitation were to begin only when P, the
subsequent purchaser, could have discovered the defects, then this would amount
to a fresh limitation period. On this approach, if the period of limitation
were to commence afresh every time there was a change in ownership,
theoretically the builder would be liable just because of the accident of the
house being transferred, for a longer period of time, though not in perpetuity.
This is a significant fact. In contrast to the present regime, the builder is
not open to liability in perpetuity because the long-stop would limit the
period for which the builder could be held liable. He is effectively only
liable for an extra four years.[139]
Secondly, from the perspective of P, the plaintiff, if no concession is made by
the law to the fact there has been a change of ownership, it is P who would be
placed at a disadvantage. He would have a shorter period in which to take
action than would be the case if he were in the position of the normal
plaintiff, such as V. [140]
C. Can P not Sue his Surveyor?
5.25 It might be thought that the subsequent purchaser can avoid this situation (in the same way as a subsequent purchaser would at present where time starts to run from the date of accrual) by employing a surveyor to discover any damage which has already become apparent. If the surveyor discovered the damage, then P could negotiate either a reduction in the purchase price to take account of the defects or for the cause of action to be assigned to him by the predecessor owner.[141] Alternatively, if the surveyor fails to discover the damage, the fact that it ought to have been discovered (otherwise a cause of action would not have accrued to the original owner) suggests that he would have a remedy against the surveyor.
5.26 This solution was the one put forward in our Consultation Paper[142] as sufficient to obviate the need to make any special provision for the predicament of the subsequent purchasers. However in submissions received during the consultation process the Commission was urged, particularly by members of the relevant professions within the construction industry, to reconsider the practical effectiveness of this solution. A number of difficulties were brought to mind:
1. What if, as is often the case with houses below a certain price threshold, there is no survey? Alternatively, properties may be surveyed by the purchaser who may be reluctant to have a thorough investigation undertaken due to the expense. It is said with some authority that clients are quite capable of buying a building on a preliminary report or a superficial report.
2. Again, what if consultants make a negative report and the client nevertheless continues with the purchase?
3. Limitation and exclusion clauses will often be set out in the surveyor's
report. Qualifications on liability are often included in survey reports not
least because they are required by insurance companies providing professional
indemnity. In many cases a purchaser will rely on the survey commissioned by
the building society. The building society surveyor is under a duty to exercise
reasonable skill and care in carrying out the survey. This duty of care is
owed, not only to the building society, but also, as long as certain conditions
are satisfied, to the mortgagor.[143]
However, any duty of care to the mortgagor is usually excluded by a disclaimer
in the mortgage application form.[144]
There are numerous problems in relying on professional indemnity insurance
policies,[145]
both in relation to the
extent of the cover and the risk that there might not be insurance cover the
year the plaintiff makes the claim.
5.27 In short, there may be many reasons why an action against the surveyor is
not always a viable option.
D. Solutions adopted in other Jurisdictions
5.28 In England the Latent Damage Act, 1986 , s.3 provides that where the defect becomes discoverable only when the building is owned by the subsequent purchaser, he acquires a cause of action with a fresh limitation period which commences at the date of `discoverability'. However, where the defect was discoverable by the predecessor owner, even if the limitation period had not run out by the time of the transfer of property, the subsequent purchaser has no cause of action.
5.29 From a policy point of view, this provision sets the balance unduly in favour of the builder. Why should a builder be in a more defensible position if the predecessor owner sells the property rather than if he retains it? It seems likely that this rule is the outcome not so much of limitations policy as of the substantive approach that a person cannot sue if he is not the owner of the property at the time the damage occurred.[146] In any case, this rule seems unfair.
5.30 In contrast to English law, the law in Alberta[147] adopts a compromise position: Alberta Limitations Act, 1996 , s.3(2), provides that the limitation period begins: "against a successor owner of a claim when either a predecessor owner or the successor owner of the claim first acquired or ought to have acquired the knowledge". Thus, where the discoverability test is fulfilled under the ownership of the original owner, the subsequent purchaser will acquire the claim with the limitation period already running against him. It is implicit in this provision that the knowledge of the predecessor owner is imputed to the successor owner. In effect it makes the commencement of the limitation period solely referable to the fulfilment of the discoverability test, regardless of the person who owns the action at that time. But the crucial feature here is that no new limitation periods are triggered by the change in ownership. This was also the solution recommended by the Ontario Limitations Act Consultations Group.[148]
5.31 At the other extreme from the English Limitation Act, 1980 (as amended), the New Zealand Law Commission[149] recommends that time should only run against a subsequent owner of the property when he discovered or ought to have discovered the cause of action. The New Zealand Law Commission emphasises, the fact that the ultimate protection for the defendant is the 15 year `long-stop'. It is interesting to note that the English Law Commission in its recent Consultation Paper on Limitation of Actions [150] also recommends that a fresh cause of action should accrue to a subsequent owner of damaged property, when he has or ought to have knowledge of the facts, even where the previous owner had this knowledge (save in the unlikely case that the subsequent owner had the necessary knowledge before that date, in which case the limitation period would start to run when he acquired an interest in the property).
5.32 It will usually though not inevitably happen that if the defect was
discoverable by V, then it will also be discoverable by P when he or she
acquires an interest in the property. Presumably it was on this ground that the
Law Reform Commission of Western Australia[151]
recommended that, where the defect was discoverable by
the predecessor owner, the initial period should begin against a subsequent
owner when he or she acquires an interest in the property (unless the
subsequent owner had the necessary knowledge before that date).
E. Recommendation
5.33 After examining this comparative material, it seems that there are two
real options as regards the time at which the limitation period begins to run
against the successor owner P.
These are either:
(a) When the defect is discoverable by V which is the approach taken by the
Alberta Law Reform Institute, and the Ontario Law Commission;
(b) When the defect is discovered/discoverable by P which is the approach taken
by the New Zealand Law Commission and the English Law Commission.
In this area we encounter the all too common problem of a dispute between two
relatively innocent third parties. As indicated earlier when we considered the
issue from the perspectives of the builder and of the plaintiff, it is hard on
the defendant if his liability is to be extended simply because the building
happened to be sold by the party for whom the house was built. Conversely, it
is also hard on P, if his limitation period is to be reduced.
5.34 In this evenly balanced situation the Commission preferred solution
(a), in other words the limitation period should start to run against a
successor owner of a claim when it is or ought to be discoverable by either a
predecessor or the successor owner of the claim.
III. Discoverability and Equitable Remedies
5.35 The position at present is that s.11, the central provision in the
Statute of Limitations, 1957
does not apply to equitable remedies except
to the extent that it can be applied by analogy.[152]
It is excluded by subs.9:
"(a): This section shall not apply to any claim for specific performance of a
contract or for an injunction or for other equitable relief.
(b) Paragraph (a) of this subsection shall not be construed as preventing a
Court from applying by analogy any provision of this section in like manner as
the corresponding enactment repealed by this Act has heretofore been
applied."
5.36 Instead, the equitable remedies have developed what may be regarded as
their own limitation period: laches, by which it is a defence to an action that
the plaintiff has unreasonably delayed before taking action and the
circumstances are such as to make it inequitable to enforce the claim.[153]
While there are many factors which may
be relevant to the question of what is equitable, one of these factors is when
the plaintiff knew or should have known, that he had a cause of action. In
short, discoverability has always been built into the equitable test for
limitations. We see no need therefore to make any change to the subsection
which has just been quoted.
5.37 We recommend no change to the existing statutory provision which
excludes specific performance, injunctions and other equitable reliefs from the
purview of the Statute of Limitations, 1957
.[154]
IV. Burden of Proof
Allocation of the Burden of Proof
Present Position
5.38 The general rule is that the burden of proof is on the party who
affirmatively asserts the fact in issue - "he who asserts must prove". Lord
Maugham in
Constantine Line v. Imperial Smelting Corporation
said:
"The burden of proof in any particular case depends on the circumstances in
which the claim arises. In general the rule which applies is
Ei qui
affirmat non ei qui negat incumgit probatio
. It is an ancient rule founded
on considerations of good sense and should not be departed from without strong
reasons."[155]
This rule requires the party who would fail if no evidence were called to prove
that the issue should be decided in his favour.[156]
It is not relevant that that party in the pleadings is
stating a negative and the other party is stating an affirmative.
5.39 There are two burdens of proof: the legal burden; and the evidential burden.[157] The legal burden can be defined as "the burden of persuading the tribunal of fact, to the required standard of proof, and on the whole of the evidence, of the truth or probability of every essential fact in issue"[158] The evidential burden is the burden of adducing evidence to prove the facts in issue. It is implicit that the party who has the legal burden also has an evidential burden. Once this burden is discharged the evidential burden passes to the other party, who must adduce evidence in opposition. In this brief section we are mainly concerned with the incidence of the legal burden of proof.
5.40 Particular rules can apply for specific classes of cases so that it is necessary to resort to precedents in order to ascertain the true allocation of the burden of proof.
5.41 The specific question of the burden of proof in relation to the Statute
of Limitations is dealt with in the case of
Cartledge v. Jopling & Sons
Ltd.
[159]
In this case, claims were made
by the plaintiffs for damages for injuries caused by the contracting of
pnuemoconiosis in the course of work as steel dressers in the defendant's
factories. It was held by Glyn Jones J that the cause of action accrued more
than six years before the issue of the writ on the 1st of October
1956. On appeal the defendants argued that the burden of proving that the
injury occurred within the limitation period was on the plaintiff. The Court of
Appeal found for the defendants on this issue. Pearson LJ stated:
"Where there is a
joinder of issue
[160]
on a defendants's plea of the Statute of
Limitations.... the burden of proof is on the plainitff to show that his cause
of action accrued within six years of whatever is the relevant period for the
purposes of the statute:
Hurst v. Parker
(1817) 1 B&Ald 92;
Beale
v. Nind
(1821) B&Ald 568, 571;
Wilby v. Henman
(1834)2 Cr &
M 658;
Darley Main Colliery Co v. Mitchell
11 App Cas 127, 135...
O'Connor v. Issacs
[1956] 2 QB 288."[161]
The same view was taken by Harmon LJ.[162]
5.42 On appeal, to the House of Lords, Lord Pearce agreed with these judgments.
In his speech with which the other Law Lords agreed he stated:
"I agree with the judgments of the Court of Appeal ... I would only wish to add
a gloss to what was said on the onus of proof in the case of the plaintiff
South. I agree that when a defendant raises the Statute of Limitations the
initial onus is on the plaintiff to prove that his cause of action accrued
within the statutory period. When, however, a plaintiff has proved an accrual
of damages within the six years (for instance, the diagnosis by X-ray in 1953
of hitherto unsuspected pneumoconiosis), the burden passes to the defendants to
show that the apparent accrual of a cause of action is misleading and that in
reality the causes of action accrued at an earlier date. As, however, the judge
found that South was in fact suffering from pneumoconiosis in 1950, the
question of onus was not a deciding factor."[163]
The "gloss"added by the House of Lords here limits the extent of the burden of
proof on the plaintiff to an "initial" onus to show that the cause action
accrued within the limitation period. This leaves the defendant the burden of
proving that proceedings were not commenced within the limitation period.[164]
5.43 A further gloss was added by the Court of Appeal in
London
Congregational Union Incorporated v. Harriss & Harriss
[165]
where Lord Justice Ralph Gibson stated:
"In my judgment the burden on a plaintiff is to show that, on the balance of
probabilities, his cause of action accrued, ie came into existence, on a day
within the period of limitation. If he shows that, then the evidential burden
would, as stated by Lord Pearce, pass to the defendants to show, if they can,
that the apparent accrual of the plaintiffs' cause of action was misleading
etc."
Ralph Gibson LJ appears to be saying that the legal burden lies upon the
plaintiff, and once the plaintiff has discharged this burden and established a
prima facie
case, the defendant who bears no legal burden of proof,
acquires an evidential burden of proof.[166]
At this point the defendant must adduce some evidence against the plaintiff's
case or else the plaintiff will succeed.
5.44 There does not appear to be any Irish cases dealing specifically with the
burden of proof in relation to the Statute of Limitations. However having
examined: the Irish case-law dealing with the Statute of Limitations; the rules
of evidence; and the rules of practice and procedure, there does not appear to
be any reason why the incidence of the burden of proof should differ from that
set out above in the English case-law. Thus the burden of proving that the
cause of action took place within the limitation period is on the plaintiff,
while it is up to the defendant to show that the cause of action in fact
accrued outside the limitation period.
5.45 In summary, it is established at common law that when there is joinder
of issue,
[167]
the burden of proving,
that proceedings in respect of a cause of action were brought within the
limitation period, is on the plaintiff. The Commission is of the view that this
is and should remain the position in this jurisdiction. However because the
incidence of the burden of proof is an area of law better left to development
by the courts and one where a degree of flexibility in the law is necessary,
we do not recommend legislation.
5.46 In respect of the provisions relating to postponement of the limitation
period due to legal incapacity, fraud or mistake,[168]
the onus is on the plaintiff in each case to prove that
the limitation period has been postponed because of the existence of one of
these factors.
5.47 The Commission is of the view that this is the correct approach and
does not recommend any change in the law.
Impact of Discoverability Test on the Burden of Proof
5.48 The present allocation of the burden of proof, where a limitations defence
is pleaded, will work especially well under the proposed discoverability test.
Since the limitation period commences from when the plaintiff knows or ought to
know of the damage, there will be facts in certain cases of which only the
plaintiff is aware, and therefore, which the plaintiff is in the best position
to prove. Thus, it is appropriate that the burden of proof lies with the
plaintiff. Indeed, in personal injury cases coming within the 1991 (amendment)
Act s.2, where the date of discoverability is the date the limitation period
commences, it has been accepted that the onus of proof is on the plaintiff. [169]
5.49 The Commission recommends that the burden of proving that proceedings
in respect of a cause of action were brought within the discoverability
limitation period should be on the plaintiff. The Commission is of the view
that legislation to this effect is not required.
V. Transitional Provisions
5.50 Should the legislation which we propose apply only to actions which accrue after the date it comes into force, or should it apply to certain actions where the limitation period is already running at the date the act comes into force?
5.51 Before dealing with this question, it is important to note that either the act itself indicates the scope of its application, or in the absence of such a provision, the presumption in law against giving retrospective effect to a statute applies. O'Higgins CJ in Hamilton v. Hamilton [170] explained the policy behind this presumption as follows: "[r]etrospective legislation, since it necessarily affects vested rights, has always been regarded as being prima facie unjust".[171] This policy does not extend to procedural changes as they do not affect vested rights.[172] Thus even if the proposed act did not contain an express provision regarding its scope, the rule would probably not apply on the grounds that vested rights are not affected by a change in the limitations legislation.
5.52 We now move on to the question, whether or not the proposed statute should
expressly provide that it is to operate retrospectively. Two key issues arise
here: one is the constitutionality of such a provision; the other is where the
appropriate balance between the rights of the plaintiff and fairness to the
defendant lies.
(i) Constitutional Aspect
5.53 First, we look at the constitutional aspect. There are two constitutional
provisions which appear relevant in this regard: Ariticle 15.5 and Article
40.3. It is provided in Article 15.5 of the Constitution that:
"The Oireachtas shall not declare acts to be infringements of the law which
were not so at the date of their commission."
In interpreting Article 15.5 in
Sloan v. Culligan
,[173]
Finlay CJ stated that: "It does not contain any general
prohibition on retrospection of legislation, nor can it be by any means
interpreted as a general prohibition of that description." Thus the
retrospective effect of a statute, does not,
per se,
infringe Article
15.5 so long as no new infringement of law is created. Since the expiry of a
limitation period merely prevents a plaintiff bringing a claim where the
Statute of Limitations is pleaded by the defendant, and does not extinguish the
claim or the liability of the defendant, the constitutional right protected by
Article 15.5 is not infringed.
5.54 The other constitutional provision to be considered in this regard is Article 40.3 which protects "the personal rights of the citizen". The Supreme Court in The State (Nicolau) v. An Bord Uchtala [174] stated that the personal rights referred to in Article 40.3 "are those which may be called the natural personal rights and the reference therein to `laws' exclude such rights as are dependent only upon law". Since the right of a defendant to plead the statute of limitations is a right defined by statute and not a "natural personal right", any change in relation to the limitation law is not an infringement of Article 40.3.
5.55 It follows that a provision giving retrospective efect to the proposed
limitation legislation would not be unconstitutional.
(ii) Rights of Plaintiff and Fairness to Defendant
5.56 Having established that there is no constitutional bar to limitations legislation having retrospective effect, we turn to examine where the appropriate balance lies between protecting the rights of the plaintiff and ensuring fairness to a defendant. The possibility that a cause of action could be statute-barred under the present legislation even before the plaintiff knew or ought reasonably to have known of its existence, is an injustice to the plaintiff, and it was this which provoked our core recommendation to introduce a discoverability limitation period. However, because the proposed recommendations extend the limitation period, the defendant is inevitably made worse off. The hardship to the defendant would be particularly acute, if the proposed recommendations were to apply retrospectively. This is because many professionals and other potential defendants will have made insurance provisions for actions against them involving latent damage based on the present limitations legislation.
5.57 There have been express provisions concerning retrospective application in the Statute of Limitations, 1957 and the Statute of Limitations (Amendment) Act, 1991. The Statute of Limitations, 1957 , s.8 provides that the Act applies to all causes of action, except those barred before the Act came into force and those for which proceedings were commenced before the Act came into force. The Statute of Limitations (Amendment) Act, 1991 , s.7, provides that the Act applies to all causes of action in relation to personal injuries, which are not statute-barred at the date the Act comes into force. It even expressly includes those actions which were pending at the date at which the Act comes into force. The English Latent Damage Act, 1986 , ss.1 and 2, provides that, while the act does not apply to actions which are already statute-barred under the Limitations Acts 1939 or 1980, it applies to all other actions accruing before and after it comes into force.
5.58 But is the present injustice to the plaintiff greater than the hardship
that would be caused to the defendant by the retrospective introduction of
the legislation? In our
Consultation Paper on The Law of Limitation of
Actions arising from Non-Sexual Abuse of Children
,[175]
the Commission was of the view that the injustice to
the plaintiff was greater than the inconvenience caused to the defendant by
an extended period of liability. Similarly in our
Report on
the
Statute of Limitations Claims in Respect of Latent Personal Injuries
[176]
the Commission was of the view
that if the new legislation did not apply retrospectively, it would in certain
cases frustrate the proposed reform of the law. However, in this instance, the
injustice to the plaintiff does not involve either physical injury to the
person or sexual or physical abuse, but latent damage to his property. The
Commission is of the view there is no need for the legislation to be applied
retrospectively.
5.59 The Commission recommends that the proposed law in relation to latent
damage should only apply to actions which accrue after it comes into force.
CHAPTER SIX: ACCRUAL- STARTING POINT FOR LONG-STOP
6.01 Accrual remains a key and occasionally difficult concept. In the first place, it is the reference point for the present law and for reasons given in Chapter Three we recommend that it should be retained for patent loss. Secondly, it is ultimately the basis of the discoverability test, recommended in Chapter One, in that the underlying foundation of this test is the point at which the accrual of the cause of action becomes discoverable. Finally, it is the anchor-point for the long-stop recommended in Chapter Four.[177] Consequently for the long-stop to maintain certainty in the law, it is essential that the date of accrual can be easily ascertained.
6.02 "A cause of action does not accrue until every element of the cause of action is present."[178] Therefore clearly different types of action accrue at different times. Due to the rapid change in the substantive law of tort, there can sometimes be a difficulty in applying those rules. These difficulties are the focus of this chapter.
6.03 In Part I of the chapter, we consider certain aspects of accrual in
contract actions, in particular the difficulty of pin-pointing the date of
breach, especially in the case of continuing breach and construction industry
claims. Part II deals with claims in tort, focusing in particular on pure
economic loss claims; continuing torts; and construction industry claims in
cases involving a continuing tort; and finally pure economic loss cases
involving physical defects in tort. The difficulty in the latter instance is
most commonly encountered in construction cases.[179]
Finally in Part III we examine the possibility of
different dates of accrual applying to concurrent contract and tort actions.
These are complicated areas and we have thought it right to put forward
recommendations for reform only in respect of construction industry claims.
However, as this entire area is likely to be of increasing importance in the
future and, since there is a dearth of judicial and academic analysis, we
include our tentative discussion in the hope that it may assist future
developments.
I. Contract
A. Accrual: Date of Breach
6.04 The general rule[180] that applies in contract law is that the cause of action accrues when the breach occurs, rather than when any damage is suffered. The point at which the breach actually occurs, will depend on the nature of the breach and on the terms of the contract.
6.05 In a situation where the nature of the breach consists of an act or omission which renders the contract impossible to perform, then the date of this act or omission is the date when the breach occurs and the action accrues.
6.06 However there are other more common situations, where it is not the nature of the breach but the terms of the contract which determine when the breach occurs. These situations arise where it is stated in the contract that the promise be carried out by or on a specific date[181] or by or on the happening of a contingency;[182] and the innocent party accepts the non-performance as discharging the contract.
6.07 In construction cases the breach usually occurs either at the date of the
negligent act or on the completion of the work in question unless as is usual
in construction contracts there is a repair clause in the contract. In
Morgan v. Park Developments
[183]
a
clause in the contract provided for the builders to carry out repairs if
requested within 12 months of the date of completion. As a result of the
repair clause, the breach was held not to have occurred until the failure of
the second attempt to remedy the structural defect during the 12 month period
after the completion date. The High Court held that it was only at this point
that the limitation period began to run in respect of the original negligent
act. However, in a contract in which there is no contractual provision obliging
or giving the service-provider the right to rectify the work, then there is
not, nor should there be, a suspension of the limitation period. A separate
limitation period will apply in respect of the repairs carried out.
B. Difficulty Where there is no Specific Date by Which the Contract Must
be Performed.
6.08 The real difficulty arises where there is no specific date or implied term
indicating when the contract must be performed. Such were the circumstances in
Bell v. Peter Browne & Co.
[184]
In this case the defendant solicitors were employed by the plaintiff to act on
his behalf in divorce proceedings. They were to transfer the matrimonial home
into the sole name of the wife but the plaintiff's interest, being one sixth of
the proceeds of sale, was to be protected by trust. The property was duly
transferred in 1978, but the defendants neglected to take the appropriate steps
to protect the plaintiff's interest. This failure could have been remedied
until 1986 when the house was sold to a third party. However, the Court of
Appeal held that, while the contractual obligation continued until it could no
longer be performed, the breach itself, nonetheless occurred when the
obligation should have been performed, in 1978, the date of the transfer.
Nicholls LJ giving judgment for the Court stated:
"A remediable breach is just as much a breach of contract when it occurs as an
irremediable breach, although the practical consequences are likely to be less
serious if the breach comes to light in time to take remedial action. Were the
law otherwise, in any of these instances, the effect would be to frustrate the
purpose of the statutes of limitation, for it would mean that breaches of
contract would never become statute-barred unless the innocent party chose to
accept the defaulting party's conduct as a repudiation or, perhaps performance
ceased to be possible". [185]
6.09 What appears to be the general rule set out in this case is that the limitation period will start to run from when the obligation should have been performed. The advantage of this approach is that it eliminates the prospect that, other than in exceptional circumstances, a service provider is under a continuing contractual duty to remind himself everyday of the omission of which, often, he is unaware. It means that from a defendant's point of view it is reasonably possible to ascertain for how long a claim can be made against him. However, where the duty is not one to carry out a particular step at a particular time, "the date when the obligation should have been performed", could prove to be quite elusive.
6.10 The earlier decision in Midland Bank Trust Co Ltd v. Hett Stubbs & Kemp [186] appears to provide an exception to this general rule (though in Bell v. Browne, [187] Nicholls LJ said that the Midland Bank case was confined to its own special facts). The Midland Bank Trust case involved a solicitor's failure to register an option to purchase land in 1961, which led to the option being defeated in 1967. The breach of contract was held to have occurred not in 1961, as would be the case if the rule in Bell v. Browne were applied; but in 1967, when the obligation became impossible to perform.
6.11 In Midland Bank Trust Co Ltd Oliver J distinguished Bean v. Wade, [188] a case decided along the lines of Bell v. Browne . In Bean v. Wade the cause of action was held to have accrued at the time notice of the assignment of trust funds should have been given, as opposed to seven years later, when notice of a mortgagee's interest was given, thereby gaining priority. Oliver J pointed to a number of distinguishing factors: the terms of the retainer in the client /solicitor relationship; the fact that the payment was rendered in such a manner as to indicate the relationship had terminated; and that the contracting party at fault was treated as functus officio .[189] Furthermore, Oliver J noted that in Bean the claim was for losses incurred due to failure to give notice within a reasonable time. By contrast, in the Midland Bank case, the solicitors had never treated themselves as functus officio . Thus the cause of action was held not to have accrued until the option was defeated. An analogous situation in a construction project might be where an architect negligently designed a building. His duty to rectify this would continue right up until the completion of the building assuming the contractual relationship also continued until completion.
6.12
Halsbury's Laws of England
contains the following statement:
"[W]here a party, in breach of his contractual undertaking, fails to perform a
contractual obligation, the plaintiff's cause of action will accrue on the date
when the obligation should have been performed, notwithstanding that that
failure was capable of rectification at a later date, unless the parties remain
in a contractual relationship, in which case time will not start to run until
the date when the relevant obligation becomes impossible to perform".[190]
This general statement seems to encapsulate both the
Bell
and the
Midland Bank
decisions. However, as already stated, where the duty does
not entail the carrying out of particular steps at a particular time, "the date
when the obligation should have been performed", could prove to be quite
elusive. Inadvertently in such situations the decision in the
Midland
Bank
case may be applied, since the date when the obligation becomes
impossible to perform may be the only discernable date.
C. Continuing Breach of Contract
6.13 In cases where the breach of contract consists of a continuous course of conduct or a series of related acts or omissions so closely related as to amount to a continuous course of conduct, it is categorised as a continuing breach.[191] Authority for this is the Court of Appeal decision of National Coal Board v. Galley [192] which stated that whether a breach was a "continuing" one must depend on "the nature of the particular obligation broken."[193] An example given in this case was a contract of service for a specified time containing a clause that precluded an employee from carrying on, or being concerned in, any other business of the same kind as the employer's business. It was stated that should an employee work in such a business in breach of the stipulation in the contract "the breach would we think clearly be a continuing one"[194] and would continue until he ceased to work in such a business.
6.14 Where a breach amounts to a continuing breach, it gives rise to a
continuous cause of action. The plaintiff can bring an action based on the
continuing breach so long as the last moment of the course of conduct is within
the limitation period; in other words the action may be taken up to six years
after the last moment of the breach.
However, only the loss
which occurred within this limitation period can be recovered.[195]
Take a situation, in which a plaintiff took an action
in 1999 for a continuing breach of contract, which commenced in 1990 and ended
in 1994. Because the action was commenced 5 years after the course of conduct
ended, the plaintiff would only be able to recover for loss suffered as a
result of the causes of action accruing between 1993-1994 and not during the
three years prior to 1993.
D. Construction Liability Claims in Contract
6.15 The construction of a building can involve services provided by a number
of different contractors, companies and professional people. Therefore the
breach could occur at different times. Accordingly the limitation period for
the individual participants in the construction process starts at different
dates. Therefore it will also end at different dates. In circumstances where
the limitation period is in issue, much time and money could be spent trying to
pinpoint exactly when the breach committed by any particular participant took
place. This is one of the difficulties associated with insuring against latent
defects. Mullany listed examples of the different stages when a breach can
occur:
"1. When the building was incorrectly designed;
2. When the building, although correctly designed, was incorrectly drawn on the relevant plans;
3. When plans, either incorrectly designed or incorrectly drawn were submitted for the contractor's tender;
4. When the defective building was constructed;
5. When the building or that part of it containing the defect was improperly inspected; or
6. When the building while in a defective state, was handed over on
completion."[196]
The situation could be improved, if the cause of action in contract for each of
the participants accrued at a common point in the construction process such as
the date of completion or purported completion of the building.
6.16 Completion or purported completion is the date of the issue of the certificate of practical completion. A certificate of practical completion is issued when works are substantially complete having passed any prescribed final test, and there has been an undertaking to finish any outstanding work in the maintenance period provided for in the contract. In the construction industry there is a distinction between the carrying out of works and the snag list dealing with minor defects in them. In the absence of a certificate, the date of practical completion can be ascertained from the date of the release of the retention of title; the possession or occupation of the building by the purchaser; or can be deduced from the circumstances. In large building projects taking a number of years to finish, a certificate of completion can be issued for a section of the project where the works in that section are substantially complete.
6.17 The claimant would also benefit from such a provision, as the date of
practical completion would in most cases be later than the date of the actual
act or omission which gave rise to the defect.
6.18 The Commission recommends that in construction liability claims,
[197]
a cause of action in contract should
accrue for all the participants in the construction process at the date of
completion or purported completion.
II. Actions in Tort (Non-Personal Injury actions)
A. Torts Actionable Per Se and Torts Actionable on Proof of
Damage
6.19 S. 11(2) of the
Statute of Limitations
,
1957,
states that an
action founded on tort shall not be brought after the expiration of six years
from the date on which the cause of action accrued.[198]
For torts actionable on proof of damage, such as
negligence, the cause of action will accrue when the defendant's wrongful act
causes damage.[199]
For torts actionable
per
se
such as trespass, false imprisonment, and libel, the cause
of action will accrue when the wrongful act is committed. The distinction
between torts actionable
per se
and those actionable upon proof of
damage is a relic of the historical development of the law of tort and can be
explained by reference to the following underlying policy: torts actionable
per se
involve
prima facie
wrongful behaviour, the harm of which
is usually immediately apparent, and as the act was considered to be such as to
arouse violent resentment, it was in the interests of public security to
provide an instant remedy. For example, in trespass, the cause of action
accrues when there is a direct physical act which interferes with the
plaintiff's possession. By contrast in the case of torts actionable only upon
proof of damage, like negligence and nuisance, the fact of the damage was "the
catalyst which induced the courts to furnish redress."[200]
For example, a situation where a builder negligently
leaves a plank of wood so that it is about to fall from a scaffolding and
seriously injure a passer-by, there is no action in negligence unless the plank
falls and injures a passer-by. In contrast to torts actionable on proof of
damage, of their nature, torts actionable
per se
are less likely to
cause latent damage.[201]
Thus injustice in
the past due to the expiration of limitation periods prior to the discovery of
latent damage has arisen mainly in the case of negligence. Accordingly, it is
on torts, such as negligence, which are actionable only on proof of damage,
that we focus our discussion.
B. Torts Actionable on Proof of Damage
6.20 In causes of action, like negligence, actionable only on proof of damage,
damage is a prerequisite to the cause of action. In such cases, the point at
which damage occurs will dictate when the cause of action accrues. Three types
of damage can arise: physical loss; consequential economic loss; and pure
economic loss. The date of accrual is reasonably straightforward for each type
of loss. However certain anomalies exist concerning the accrual of a cause of
action for pure economic loss. These are dealt with below but first it is
helpful to examine each type of loss and its corresponding date of accrual.
(i) Physical loss
or damage is the most straightforward. It occurs when
there is actual physical damage. For example if a builder when putting the
finishing touches to a house accidentally lets his tools fall on top of the
conservatory smashing the glass roof, the damage to the conservatory is classed
as physical damage. The cause of action accrues when the physical damage
occurs.
(ii) In some cases the physical loss will cause a consequential economic
loss.
For instance, if due to the damage to the conservatory in the
example in (i), the plaintiff had to stay in a hotel while the damage was being
repaired, then this extra cost would be classed as consequential economic loss.
The limitation period in respect of this runs from the date of the physical
damage. This proposition follows from the principle, discussed in Chapter 5 at
para. 5.02, that a cause of action accrues when a "complete and available cause
of action
first
comes into existence".[202]
The effect of this is that, when the first damage
occurs, any subsequent deterioration or loss does not alter the date of accrual
of the cause of action.
(iii) Finally, pure economic loss
is defined as `financial loss which is
not causally consequent upon physical injury to the plaintiff's own person or
property'.[203]
For
example, if the wrong type of glass had been used in constructing a
conservatory, the cost of replacing the glass is classed as "pure economic
loss". It is only in the past twenty or so years that there has been recovery
for this type of loss in tort at all. After
Donoghue v. Stevenson
[204]
allowed recovery for economic loss
consequent on physical harm, it appeared unlikely that recovery for pure
economic loss would be allowed in the future. However in
Hedley Byrne v.
Heller & Partners
[205]
economic loss
arising from negligent misstatement was held to be recoverable. Subsequently
Junior Books v. Veitchi Co
[206]
extended recovery to pure economic loss resulting from a defect where there was
no physical damage. In this case the plaintiff recovered the cost of repairing
a defective floor from the defendant subcontractor, who had negligently
installed it
. Junior Books
has been approved and followed by the Irish
courts in
Ward v. McMaster
.[207]
In
this case pure economic loss resulting from non-dangerous defects in the
quality of workmanship was held to be recoverable.
C. Date of Accrual for Economic Loss Cases: Two Different
Rules
6.21 When determining the date of accrual in pure economic loss cases, it
appears that two different rules apply, depending on whether or not the loss is
caused by a physical defect. In law a physical defect such as exist in the
foundations, is distinct from the physical damage which it later causes to the
building. [208]
Pure Economic Loss Cases Where there is no Physical Defect
6.22 First, the case where there is no physical defect is examined. This is frequently the situation in professional negligence cases. A general rule of thumb here is that where the plaintiff suffers an immediate loss at the date he relies on negligent advice this is the date his cause of action accrues. Kelly LJ in McInerney Properties Ltd v. Department of the Environment [209] stated:" In cases of economic loss in my view the cause of action accrues from the moment when the plaintiff suffers a significant loss for which he can sue." However in situations where the loss suffered is not immediate or inevitable, at the time when the plaintiff acts in reliance on the advice, then the cause of action does not accrue, until the actual loss is incurred.
6.23 The general rule is illustrated in Forster v. Outred & Co [210] where the plaintiff in February 1973, at the offices of her solicitor executed a mortgage, on her house for the security for her son's borrowings. She believed that the mortgage was in relation to a temporary bridging arrangement and it was not until 1975, when a demand was made upon her by the mortgagee, that she discovered the truth. In 1980 she issued a writ against the solicitor claiming they had been negligent in not making her aware of the true nature of the transaction. The Court of Appeal held that the loss was suffered in 1973 when she executed the mortgage, this being the act of reliance on the defendant's advice. It has been suggested that this case lays down a rule that the cause of action accrues from the date of reliance.[211] However it was crucial to this decision that a financial loss had been incurred not in 1975, when the demand was made upon her, but at the earlier date when she obtained an interest which was of less value to her and demonstrably less than if the defendants had done their duty. In the words of Templeman LJ in Baker v. Ollard & Bentley [212] actual damage was suffered "because [she] did not get what [she] should have got."
6.24 In later cases[213] similar to Forster , the cause of action was held to accrue on the date of reliance on the act, but significantly in all of them, the plaintiff had also suffered an actual loss at this date though it had not yet fully materialised. Consistent with this approach, the Court of Appeal in UBAF Ltd v. European American Banking Corporation [214] held that the cause of action did not accrue, when in reliance on the negligent advice, the plaintiffs lent money to two Panamanian shipping companies, because no loss had been suffered at this point. It was not until subsequently when the shipping market deteriorated and the two companies got into difficulty that the loss occurred and the cause of action accrued. Ackner LJ giving the judgment for the Court of Appeal said that the question as to when the cause of action accrued in professional negligence cases, depended on the facts: "This must depend on the evidence. The mere fact that the innocent but negligent misrepresentation caused the plaintiff to enter into a contract which it otherwise would not have entered into, does not inevitably mean that it had suffered damage by merely entering into the contract".[215] He distinguished the present case from Forster v. Outred "a case dealing with a different situation";[216] one where the reliance on the negligent advice resulted in immediate economic loss.
6.25 Although the above case-law concerns the approach adopted in England, it
appears that the Irish courts have approved this case-law. In
Tuohy v.
Courtney
(No.1)[217]
the plaintiff
purchased a house in 1978 in the belief that he was acquiring a leasehold
interest which carried a statutory right to buy in the freehold estate. He
subsequently discovered that the house was held under a ninety nine year lease,
with less than 30 years to run. The defendant solicitor, who had acted for the
purchaser, pleaded the Statute in defence to the negligence action. Blayney J
held that the cause of action accrued in 1978 when the transaction was entered
into and accordingly the claim was barred. Here it seems to have been held
that the actual loss was suffered at the time of reliance although it had not
yet manifested itself.
Pure Economic Loss Caused by a Physical Defect
6.26 The second situation is where the pure economic loss is due to a physical defect.[218] This was the situation in Pirelli General Cable Works Ltd v. Oscar Faber & Partners. [219] Here the House of Lords deviated from the approach taken in pure economic loss cases like Forster v. Outred .
6.27 In
Pirelli,
the defendants were consulting engineers employed to
advise the plaintiffs on the design of a chimney at their factory. The chimney
was completed in July 1969. However the design of the chimney was negligent and
physical damage in the form of cracks occurred. These cracks were not
discovered by the plaintiffs until 1977 though the court held that they could
not have occurred later than 1970. The defendants submitted that there were
three possible dates on which the cause of action could have accrued. Lord
Fraser recorded their submissions thus:
"They suggest three possible dates as the date of accrual. The earliest
suggested date is that on which the plaintiffs acted in reliance on the
defendants' advise to install the chimney, which was bound to be defective and
eventually to fall down unless previously demolished. They did not fix this
date precisely but it must have been between March and June 1969, well outside
the limitation period. The second suggested date is that on which the building
of the chimney was completed, namely, July 1969. The third is that on which
cracks occurred, namely, April 1970. These three dates are all more than six
years before the issue of the writ, which as already mentioned was October 17,
1978."[220]
Lord Fraser adopting the third option stated: "The plaintiff's cause of action
will not accrue until damage occurs, which will commonly consist of cracks
coming into existence as a result of the defect..". Applying this conclusion to
the facts of this particular case the learned judge said " I would hold that
the cause of action accrued in spring 1970 when damage, in the form of cracks
near the top of the chimney, must have come into existence."[221]
6.28 The defendants argued that the cause of action should accrue immediately when the economic loss occurred on the basis that their negligence as consulting engineers was analogous to the that of the solicitor in Forster . Had Forster v. Outred been applied to the facts in Pirelli , the cause of action would probably have accrued when the building was completed in July 1969. At this point economic loss had already occurred as the chimney was less valuable and was in need of repair. Lord Fraser stated: "It is not necessary for the present purposes to decide whether that submission is well founded, but as at present advised, I do not think it is."[222]
6.29 In the later case of Dove v. Banhams Patent Locks [223] it was suggested that the reasoning in Forster had been undermined by the Pirelli decision. However, in the even later case of Moore v. Ferrier, [224] a pure economic loss case where there was no physical defect, O'Neill LJ stated that Forster was consistent with the Pirelli decision. The learned judge advised that "care be exercised in using the building cases as though they were a precise analogy" with other professional negligence cases.
6.30 Ralph Gibson LJ giving judgment for the Court of Appeal in
London
Congregational Union Incorporated v. Harriss & Harriss
[225]
incisively remarked that:
"There is an element of policy in the decision of the House of Lords in
Pirelli's
case in choosing, as the date of accrual of the cause of
action, the date when physical damage comes into existence. It was found to be
impossible to escape from a result, which was "unreasonable and contrary to
principle", by postponing accrual of the cause of action until the date of
discoverability. The solution lay in legislation. Meanwhile, as it seems to me
their lordships fixed upon that event which at least afforded to the victim of
the breach of duty a chance of discovering his right of action before it was
lost: namely, the coming into existence of physical damage resulting from the
negligent design."
While there may be a legitimate policy reason behind the
Pirelli
decision, it does not sit well with the principle of recovery of pure economic
loss. To say that a cause of action for economic loss does not accrue until
there is some physical damage, is to ignore the decisions of
Junior
Books
and
Ward v. McMaster
which permit a complete cause of action
to exist as soon as the economic loss occurs. The case-law in England, prior to
Junior Books
[226]
being
distinguished in
Murphy v.
Brentwood,
[227]
generally avoided dealing with the conflict between the
rule in
Pirelli
and the principle of recovery for economic loss, either
by not recognising it and reiterating the rule in
Pirelli,
[228]
or by acknowledging the point but
expressing no opinion one way or the other.[229]
This approach by the English courts shows support for
the policy behind the rule in
Pirelli
, which though conflicting with
the principle of recovery for economic loss, provides a plaintiff with a longer
period of time in which to notice the damage and bring an action. A consequence
of the rule in
Pirelli
is that there is less of a
possibility
that the limitation period will have run before the plaintiff even realises
that the cause of action exists.
6.31 The hardship caused to a plaintiff by allowing the cause of action to accrue when the economic loss occurs is illustrated in Irish Equine Foundation v. Robinson .[230] The plaintiffs brought an action for breach of contract and negligence due to the alleged faulty design of a roof. The architects had been retained in 1979 and prepared plans in 1982. A certificate of practical completion was issued in 1986 with a final certificate in 1987. There was an ingress of water through the ceiling in 1991 and a plenary summons was issued in 1996. The contract action was clearly statute- barred. The question here was whether an action founded on the tort of negligence was also statute-barred.
6.32 The plaintiff had a cause of action in tort arising in 1986 or 1987 for
the economic loss suffered in making good the defects in the defectively
designed roof. At this point, (or perhaps earlier at, the date the negligent
design plan was made) the cause of action was complete, and the subsequent
physical damage was immaterial to the date of accrual of the cause of action.
This was the outcome of Geoghegan J's analysis of the facts. However, it is
unclear whether the learned judge mistakenly applied the rule in
Pirelli
to the defect itself, as opposed to the actual physical damage, or whether
Geoghegan J was in fact applying the exception to the rule in
Pirelli
,
known as the "doomed from the start"[231]
exception, (explained below)
to arrive at this
result. Had the learned Judge correctly applied the rule in
Pirelli
the
limitation period would not start to run until 1991 when physical damage
occurred.
"Doomed from the Start" Exception to the Rule in Pirelli
6.33 There is one English case,
Kaliszewska v. John Clague &
Partners,
[232]
which acknowledges and
to some extent resolves the conflict between
Pirelli
and the principle
of recovery for pure economic loss. It does so by finding that in
Pirelli
the defect fits into the exception to the general rule which is referred to
by Lord Fraser in
Pirelli
, in the following terms:
"There may perhaps be cases where the defect is so gross that the building is
doomed from the start, and where the owner's cause of action will accrue as
soon as it is built, but it seems unlikely that such a defect would not be
discovered within the limitation period. Such cases, if they exist, would be
exceptional."[233]
6.34 This has become known as the "doomed from the start" principle, and there are reservations as to how seriously this exception should be taken. In the House of Lords decision, Ketteman v. Hansel Properties, [234] Lord Keith stressed that these comments were not necessary to the decision in Pirelli and were inconsistent with it. Lord Brandon dismissed it as "no more than obiter dicta ". However the exception has been applied, though not with any degree of consistency, in a small number of cases. From this limited body of case-law it appears that the "doomed from the start" exception will apply where, on the acquisition of a building, although physical damage has not yet occurred, but it is inevitable that it will occur in the future either as a result of the passing of time[235] or the use[236] to which the building is put. The defect itself must be serious[237] and exceptional.
6.35 This "doomed from the start exception" was used in the case of Kaliszewska v. John Clague & Partners [238] as a means of allowing the limitation period run from the date the economic loss occurred, and not the date of the subsequent physical damage. In this case, Judge White recognised that at the date of the acquisition of the bungalow, recoverable economic loss resulting from the cost of the repairs or the diminution in value of the building had been suffered; but the physical damage had not yet taken place. He concluded that as the defects were serious it could be said they came within the `exceptional case' contemplated by Lord Fraser in Pirelli.
6.36 This solution has been described as an "acceptable practical compromise"
by Merkin[239]
even though "[i]t is scarcely
consistent with
Junior Books
which does not rest upon proof of
substantial or exceptional economic loss but merely upon the establishment of a
duty of care." It seems clear that from a substantive perspective, the "doomed
from the start" exception enables recovery for the cause of action at the point
when the economic loss occurs, while from a limitations perspective it could
mean that the plaintiff's cause of action arose at an earlier date and
consequently, he might be prematurely out of time.
D. Continuing Torts
6.37 A continuing tort includes not only one continuous tortious act but also a series of wrongful acts which are so closely related that they effectively amount to a single course of conduct. The series of torts is treated as a single tort because each act contributes to a single harm. The most common instances arise out of the torts of trespass or nuisance. For example, a trespass which involves placing and leaving some object on another's land is a trespass which continues for as long as that object remains on the land.
6.38 There appears to be two different approaches to the question of when a
continuing cause of action accrues. On the one hand there is the view that it
accrues continually so that with every passing day a new cause of action arises
until the defendant discontinues the action. Consequently when the limitation
period for the final cause of action expires, only damage occurring within six
years from the date the final cause of action accrued, is recoverable. Pearson
LJ (as he then was) in
Cartledge v. E Jopling & Sons Ltd
[240]
states:
"In a case where there is a continuing breach of duty by the defendant
continually causing damage to the plaintiff there is a fresh cause of action
arising every day, and if the breach and resulting damage have continued for
more than the period of limitation, the Limitation Act, if relied upon by the
defendant, will bar the plaintiff's action for the damage occurring before the
critical date but not for the damage occurring after it."
6.39 The alternative approach which has found favour in many states in America
requires that the limitation period for a continuing tort begins at the time
the tortious conduct ceases.[241]
Accordingly so long as any of the damage occurred within the limitation period
the plaintiff will be able to recover for
all
the damage resulting from
all the wrongs of the defendant. In cases where the damage is ongoing, the
plaintiff effectively has the option of bringing an action immediately for the
ascertainable damages or waiting until the damage has ceased to recover all
damages. This "continuing tort doctrine", as it is known, provides an exception
to the rule that a limitation period runs from the date of accrual of the cause
of action. It is generally applied where "no single incident in a continuous
chain of tortious activity can `fairly or realistically be identified as the
cause of significant harm'[making it ] proper to regard the cumulative effect
of the conduct as actionable".[242]
The
value of this approach is that it avoids the need to determine at what point
during the continuous course of conduct the harm occurred, something which in
practice may be impossible.
E. Construction Liability Claims
6.40 Both because of the frequency of the disputes arising in the construction
industry and because of the difficulties in insuring against latent defects, a
fixed and easily ascertainable period of liability is essential. The Commission
proposes to make a special recommendation in respect of the long-stop in
construction liability claims in tort. Special provisions in relation to
construction liability claims can be found in the
Defective Premises
Act
,
1972
s.1(1) in the England and in our 1982
Report on
Defective Premises
whereby it was recommended that causes of action in
respect of a duty to build premises properly should be deemed to accrue:
"(a) on the date on which the premises were completed; or
(b) on the date when any person entitled to occupy the premises, whether as
first or subsequent owner or occupier, knew or ought reasonably to have known,
of any defect in the building work attributable to a breach of the duty [to
build premises properly]imposed by section 3."[243]
The Commission is of the view that the long-stop in an action in tort should
start at the date of practical or purported completion. Completion or purported
completion is the date of the issue of the certificate of practical
completion.[244]
This long-stop would apply
to both the discoverability and the accrual limitation periods as an overall
limitation period. As regards construction liability claims in contract, at
para. 6.18, it has been recommended that in, the date of completion or
purported completion should be the date of accrual. Accordingly, in contract,
the long-stop would also run from the date of practical or purported
completion.
6.41 The Commission recommends a special provision for construction
liability claims; the starting point of the long stop for construction
liability claims in both tort and contract should be the date of completion or
purported completion.
6.42 Our recommendation means that there would be a fixed period of liability in construction industry claims in both tort and contract running for 10 years from the date of completion or purported completion. This would make it easier for insurers to predict future claims and maintain adequate reserves, thereby lessening the cost and improving the scope and availability of latent defect insurance in the construction industry. However, if the contract was a contract under seal,[245] we believe that the limitation period should remain 12 years.
6.43 The Commission is conscious that recommending the completion date as the
starting point of the long-stop could give rise to the theoretical problem that
the limitation period provided by the long-stop could expire before the cause
of action actually accrued. However the Commission is of the opinion that the
advantage of, in construction liability claims, starting the long-stop at the
date of completion or purported completion outweighs any anomalies resulting
therefrom.
6.44 The Commission also recommends that construction liability claims be
defined as follows:
Construction liability claims
are claims arising from all construction
operations. Construction operation[246]
means, an operation of any of the following descriptions-
(a) construction, alteration, repair, maintenance, extension, demolition or
dismantling of buildings, or structures forming, or to form part of the land
(whether permanent or not);
(b) construction, alteration, repair, maintenance, extension, demolition or
dismantling of any works forming, or to form, part of the land including
(without prejudice to the foregoing) walls, roadworks, tunnels, bridges,
power-lines, telecommunications apparatus, aircraft runways , docks and
harbours, railways, reservoirs, water-mains, wells, sewers, industrial plant
and installations for purposes of land drainage, coast protection or
defence;
(c) installation in any building or structure of fittings or structures forming
part of the land, including (without prejudice to the foregoing) systems of
heating, lighting, air-conditioning, ventilation, power supply, drainage,
sanitation, water supply or fire protection, or security or communications
systems;
(d) external or internal cleaning of buildings and structures, so far as
carried out in the course of their construction, alteration, repair, extension
or restoration;
(e) operations which form an integral part of, or are preparatory to, or are
for rendering complete, such operations as are previously described in this
subsection, including site clearance, earth-moving, excavation, tunnelling and
boring, laying of foundations, erection, maintenance or dismantling of
scaffolding, site restoration, landscaping and the provision of roadways and
other access works.
III. Concurrent Contractual and Tortious Obligations
6.45 From a substantive law perspective, the question of whether concurrent obligations could exist in tort and contract actions was problematic for several years. The two obligations are different. Contractual obligations are voluntarily assumed by parties to the contract while tortious obligations are imposed by the general law. The method by which damages are assessed is also different. Contractual damages aim to put the plaintiff in the position he would have been in had the contract been performed; while tortious damages aim to put the claimant in the position he would have been in had the tort not taken place. A consequence of the continuing expansion of the law of torts is that the grounds of liability in tort and contract frequently overlap.
6.46 Originally it was thought that if there were concurrent obligations the
existence of a contractual relationship was a bar to recovery in tort.[247]
This came from the belief that tort could
not interfere in voluntarily assumed contractual relationships. It was also
the consequence of a line of authority in cases like
Howell v. Young
[248]
which admitted the existence of
concurrent liability but took the view that the plaintiff was bound by the
least favourable period of limitation.
6.47 However, much has changed. Now, if there is negligence in the
performance
of a contract, alternative claims may exist both in tort and contract. This is
partly due to the line of English cases starting with
Hedley Byrne v.
Heller & Partners Ltd
[249]
and
culminating in
Junior Books v. Veitchi Co
.
Ltd
.[250]
These cases allowed third parties to a contract to take
a cause of action in tort[251]
against the
defendant. But if a third party has a cause of action in tort, it would seem
logical that a party to the contract would also have a cause of action in tort.
This final step was taken by Oliver J in
Midland Bank Trust Co. v. Hett
Stubbs and Kemp
.[252]
Here it was held
that the existence of a contractual duty of care does not preclude a parallel
claim in tort.[253]
The client's right to
sue his solicitor for negligence in the discharge of his professional duties
lay in both tort and contract. There was no need here to decide whether the
plaintiff had the right to choose the action with the more favourable
limitation period as the action accrued in tort and contract at the same point.
Subsequently the case,
Tai Hing Cotton Mill Limited v. Liu Chong
Hing Bank Limited,
[254]
caused some
confusion. This case involved a commercial contract between a bank and a
customer. All duties, both tortious and contractual stemmed from this
contractual relationship. After some analysis, the Privy Council concluded that
in the circumstances the mutual obligations arising in tort could not be more
extensive than those found expressly or by necessary implication in the
contract. In such cases "[T]heir lordships do not believe that there is
anything to the advantage of the law's development in searching for a liability
in tort where the parties are in a contractual relationship."[255]
6.48 The decision of the Privy Council in
Tai Hing
does not inhibit a
duty of care in
tort imposed by the general law which arises independently of the contract from
being more extensive than the duty arising under the contract. This is
explained succinctly by Hirst J in
Holt v. Payne
[256]
as follows:
"In our opinion, there is no reason in principle why a
Hedley
Byrne
type of duty of care cannot arise in an overall set of circumstances
where by reference to certain limited aspects of those circumstances, the same
parties enter into a contractual relationship involving more limited
obligations than those imposed by the duty of care in tort. In such
circumstances, the duty of care in tort and the duties imposed by the contract
will be concurrent but not co-extensive. The difference in scope between the
two will reflect the more limited factual basis which gave rise to the contract
and the absence of any term in the contract which precludes or restricts the
wider duty of care in tort."
6.49 In cases where there is both a contractual duty, and a duty of care in tort which is independent of the contract, the plaintiff may pursue the action which is most advantageous. This is clear from the House of Lords decision in Henderson v. Merrett Syndicates Ltd. [257] Concurring with Oliver J's judgment speech in Midland Bank Trust Co, Lord Goff stated that, "given that the tortious duty is imposed by the general law, and the contractual duty is attributable to the will of the parties, I do not find it objectionable that the claimant may be entitled to take advantage of the remedy which is most advantageous to him, subject only to ascertaining whether the tortious duty is so inconsistent with the applicable contract that, in accordance with ordinary principle the parties must be taken to have agreed that the tortious remedy is to be limited or excluded."
6.50 It appears that the Irish courts are moving in a similar direction to the English courts. In the same year as the Midland Bank Trust case the Supreme Court in Finlay v. Murtagh [258] held that there can be liability in tort even where there is a contractual relationship.[259] This is a case where the plaintiff took an action against his solicitor for not instituting proceedings within the time imposed by the Statute of Limitations , 1957 .
6.51 Subsequently in
Kennedy and Others v. Allied Irish Banks PLC and AIB
Finance, Ltd,
[260]
Hamilton CJ was of
the view that, while it is established that where obligations in tort arise
from a contractual relationship, they cannot by necessary implication be
greater than those in the contract, this is not so where the obligation in tort
arises independently of the contract. Having cited a passage from
Henderson
v. Merrett Syndicates Ltd
,[261]
the
learned judge stated:
"[w]here a duty of care exists, whether such duty is tortious or created by
contract, the claimant is entitled to take advantage of the remedy which is
most advantageous to him subject only to ascertaining whether the tortious duty
is so inconsistent with the applicable contract that, in accordance with
ordinary principle, the parties must be taken to have agreed that the tortious
remedy is to be limited or excluded."
6.52 In summary, while often a duty of care in tort arises from the terms of the contract, and thus cannot be wider than the latter, this is not automatically the case. A tortious duty can exist independently of the contract. Therefore it is necessary to examine the facts and circumstances particular to each case. Provided there is no express term in the contract restricting or excluding a tortious duty, it is possible for the scope of the tortious duty to be wider than the duty set out in the contract. In such cases it is open to the plaintiff to choose whichever remedy is most advantageous.
6.53 The implication of concurrent causes of action in tort and contract for
the long-stop is that in certain circumstances there may be separate starting
points for each. This possibility could be eliminated by harmonising the dates
of accrual of a cause of action based upon a breach of a duty of care in
contract and tort. There are two possible solutions to this difficulty. One is
to provide that the cause of action based on a breach of duty of care in
contract or tort runs from the date of the breach.[262]
While this solution would be popular among defendants,
it would be unfair to a plaintiff, as the limitation period could start to run
before the cause of action accrued and the plaintiff had the right to take
proceedings. The alternative solution is to provide that the limitation period
will run from the date of the damage regardless of whether the action is in
tort or contract.[263]
But these solutions
appear too drastic and clearly carry their own sets of difficulties.
Accordingly we make no recommendation on this point.
CHAPTER SEVEN: SPECIAL CASES
7.01 If the plaintiff is not in a position to commence proceedings when time
begins to run, then factors such as (i) disability, (ii) fraud, and (iii)
mistake have traditionally prevented time from running, thereby extending the
limitation period. This rule is based on the idea that it would be unfair to a
plaintiff, who is subject to one of these factors, if no allowance were to be
made for them. While this body of law is not one which calls for review in the
present reference, we should like to state that in our view it is based on an
essentially fair policy. In this chapter we examine the impact of
discoverability, as a trigger for the commencement of the period of
limitations, upon the operation of the three factors identified above, and also
propose some consequential changes to the existing law as well as other limited
changes which do not flow from discoverability. Finally, in this chapter, we
examine the impact of the discoverability limitation period on the survival of
actions both for the benefit of and against the estate of the deceased.
I. Legal Incapacity
A. The present position
7.02 The running of a limitation period, where a plaintiff is under a legal
disability, is postponed by the
Statute of Limitations, 1957
, s.49. The
policy behind this provision is that where a plaintiff is so disadvantaged by a
particular circumstance that he can not manage his own affairs, then he should
be entitled automatically to an extension of the limitation period until that
disability ceases. This principle is well recognised and is present in, most if
not all, jurisdictions. The
Statute of Limitations,
1957,
s.
49.(1)(a), provides:
"If, on the date when any right of action accrued for which a period of
limitation is fixed by this Act, the person to whom it accrued was under a
disability, the action may, subject to the subsequent provisions of this
section, be brought at any time before the expiration of 6 years from the date
when the person ceased to be under a disability or died, whichever event first
occurred, notwithstanding that the period of limitation has expired."
7.03 A person is treated as being under a disability[264]
if he fits into one of the following three
categories:"(a) he is an infant or (b) he is of unsound mind.[265]
Formerly, there was a category (c) which consisted of
"a convict subject to the operation of the
Forfeiture Act, 1870
[266]
for whom no administrator has been
appointed". Subs.(1)(c) is obsolete since the
Forfeiture Act, 1870
was
repealed by the
Criminal Law Act, 1997
.[267]
Accordingly it should be removed.
7.04 The Commission recommends that s.48(1)(c) should be removed from the
Statute of Limitations, 1957.
B. Preliminary Points
7.05 Two preliminary matters ought to be addressed at this point.
7.06 The first point is in relation to the term `disability'. For reasons
referred to in the Consultation Paper[268]
we are of the opinion it is no longer an appropriate term, and therefore,
favour the adoption of the term "legal incapacity" in its place, to encompass
minority and unsoundness of mind.
7.07 The Commission recommends that the term `disability' in s.49 should be
replaced with the term 'legal incapacity'.
7.08 Secondly, the categories (a)-(b) in s. 48 above, may not be a reliable indicator of the individual's inability to manage his affairs. In particular, the Commission is of the view that "unsoundness of mind" may, as the New South Wales and the Western Australian Law Reform Commissions pointed out, be too narrow a concept.[269] It excludes categories of people who, though not suffering the necessary mental illness, should come within s.48 as they are incapable of managing their own affairs. Examples include: those who are unconscious or in a coma; or those who suffer from a very severe physical incapacity. To take account of these situations, the Commission is of the opinion that incapacity needs to be defined in wider terms Alternative definitions have been recommended in other jurisdictions. These have been classified into the following three groups by the Western Australian Law Reform Commission.[270]
7.09 The first group consists of those who recommended a definition along the
lines of the model in s.11(3) of the New South Wales
Limitation Act,
196l
.[271]
It provides that a person is
under a disability:
"[w]hile he is, for a continuous period of twenty eight days or upwards,
incapable of, or substantially impeded in, the management of his affairs in
relation to the cause of action in respect of the limitation period for which
the question arises, by reason of:
(i) any disease or impairment of his physical or mental condition;
(ii) restraint of his person, lawful or unlawful, including detention or
custody under the Mental Health Act, 1958;
(iii) war or warlike operations; or
(iv) circumstances arising out of war or warlike operations."
7.10 The second group consists of those who have recommended a definition along the lines of the model in the Canadian Uniform Limitation of Actions Act, 1931 whereby a person is "incapable of the management of his affairs because of disease or impairment of his physical or mental condition."[272]
7.11 The third group consists of other definitions not following either of the above models. For instance in South Australia under the Limitation of Actions Act, 1958, s. 45(2), a person is under a disability "while he is subject to a mental deficiency, disease or disorder by reason of which he is incapable of reasoning or acting rationally in relation to the action or proceeding that he is entitled to bring". In Alberta the Limitations Act, 1996 provides that a person under a disability means "(ii) a dependent adult pursuant to the Dependent Adults Act, or (iii) an adult who is unable to make reasonable judgments in respect of matters relating to a claim".
7.12 Having examined the different models of incapacity in these three groups,
the Commission favoured the Canadian definition. We are of the view that it
achieves the objective without being either unnecessarily complicated or too
broad.
7.13 Accordingly, the Commission is of the view that unsoundness of mind
should be replaced with a definition of disability along the lines of the
Canadian model. Thus s.48(1)b should be amended to read "where a person is
incapable of the management of his affairs because of disease or impairment of
physical or mental condition".
C. The Impact of the Discoverability Test in the Context of
Incapacity
7.14 Under the present law the accrual limitation period is postponed if the
legal incapacity occurs before the date of accrual. We see no reason not to
apply an analogy with the existing law when dealing with the proposed
discoverability test. Thus where the plaintiff is under a legal incapacity
before the date of discoverability,[273]
the
limitation period should be suspended until either the incapacity ceases or the
plaintiff dies. For this result to be achieved, s.49 needs to be amended.
7.15 The Commission recommends that if on the date when any right of action
became discoverable, the person to whom it became discoverable was under a
legal incapacity, the action may be brought at any time before the expiration
of three years after the legal incapacity has ceased.
D. Changes Proposed to the Existing Law
7.16 We turn next to consider two important modifications of the law, which
flow only partly from the introduction of the discoverability test.
(i) Supervening Incapacity
7.17 It is significant, that at present under s.49, the limitation period will only be suspended if the legal incapacity occurs before the date of accrual. In other words the period of limitation will not be suspended by some supervening legal incapacity, which occurs after the cause of action has accrued. Of the two categories of legal incapacity, only unsoundness of mind is affected by this restriction, since in contrast to minority, it can arise after the commencement of the limitation period.[274] This restriction derives from the rule that once time has started to run, it will continue to do so until proceedings are commenced or the claim is barred. This is said to be based on the premise that, by neglecting to take proceedings when time starts to run, a plaintiff implicitly accepts the risk that some unpredictable event may intervene and prevent him from doing so in the future.
7.18 The purpose of s.49 is to postpone the limitation period because a person suffering from a legal incapacity will be incapable of managing his affairs.However, a person suffering from an incapacity after the limitation period starts to run would be equally incapable of managing his affairs. Therefore, logically the limitation period should also be suspended in this instance.[275] Where an incapacity develops subsequent to the commencement of the primary limitation period, there is no justification for not postponing the limitation period.[276] The force of this argument has been recognised in the following foreign jurisdictions[277] which have changed the law so that a supervening incapacity may suspend the running of the limitation period: Alberta, Newfoundland, South Australia, Northern Territory and Australian Capital Territory, Manitoba and British Columbia. The English Law Commission[278] has also recommended that a supervening disability suspend the running of time.
7.19 When the supervening incapacity ceases, if the limitation period were to start afresh, this would be overly favourable to the plaintiff and would go beyond merely taking his incapacity into account. For this reason we recommend that, when the incapacity ceases only the remainder of the limitation period should be available to the plaintiff. In cases where the disability occurs near the end of the limitation period, the Commission does not consider it necessary to provide for a minimum amount of time in which an action can be brought after the disability ceases.[279] See the illustration below.
|
|
|
|
Dateof Discoverability |
|
Date Legal Incapacity ended |
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Date of Legal Incapacity |
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Discoverability
Limitation |
|
|
Remainder of Limitation Period |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
Year |
|
|
|
|
|
|
|
|
|
7.20 The Commission recommends that the legislation should be changed to
allow a supervening legal incapacity to suspend the accrual and the proposed
discoverability limitation periods.
(ii) Should there be a Long-Stop?
7.21 At present, where the plaintiff is under an incapacity, the limitation period does not start to run until that incapacity ceases. Thus, there is a possibility that the claim will not be litigated for an unlimited number of years after the event. As already discussed in Chapter Four, the possibility of a long and indefinite limitation period can cause problems for a defendant. Where he could be liable for an indefinite period of time, he would have to insure against such claims long into retirement. This extra cost to the defendant will ultimately be passed on to the consumer. Furthermore, there is the danger that the relevant evidence will have deteriorated to the extent that a fair trial is no longer possible. Alongside these factors is the likelihood that the interests of a minor or a person of unsound mind are looked after by a parent or guardian who could take an action on their behalf. Based on these arguments, the Commission concludes that there should be an ultimate fixed limitation period within which all such claims must be brought.
7.22 For reasons similar to those above, many Law Reform Commissions in other jurisdictions have recommended that legal incapacity be subject to a long-stop. The British Columbia Law Reform Commission;[280] the Newfoundland Law Reform Commission;[281] the New Zealand Law Reform Commission[282] and the English Law Commission[283] recommended that the long-stop should apply to adult disability but not minority.
7.23 The length of the limitation period remains to be determined and must be
considered separately, according to whether the plaintiff is of unsound mind or
a minor. First we consider the plaintiff who is of "unsound mind". Plainly, to
apply the 10 year long-stop which we recommend as a cap on the discoverability
limitation period would ignore the fact that those who suffer from an
incapacity are different to those who do not. It is noteworthy that there is at
present in s.49(1)(d) a 30 year limit on the extension of the limitation period
for disability in relation to actions for the recovery of land or an interest
charged on that land. The Commission is of the view that a 30 year ultimate
limitation period strikes a reasonable balance between the rights of a
plaintiff and the inconvenience caused to a defendant. It also achieves a
degree of uniformity in the application of s.49.
7.24 The Commission recommends that in cases where either the accrual or the
discoverability limitation period is postponed under s.49 because the plaintiff
is of unsound mind, there should be a 30 year long-stop for claims in respect
of physical damage.
7.25 The position is different where the plaintiff is a minor. The fundamental
difference between "unsoundness of mind" and "minority" is that the latter has
a fixed and ascertainable duration. Consequently, there are circumstances where
a 30 year long-stop might be overly generous to the infant plaintiff. For
instance in a situation where damage occurred only one year before the
plaintiff reached 18, there would be a further 29 years for the damage to
become discoverable before the expiry of the long-stop. Accordingly, we
recommend that a special limitation period be provided for postponement due to
minority under s.49. Having considered the numerous options, the Commission
came down in favour of a 10 year long-stop commencing at the age of majority.
In cases where this limitation period is excessive, and a large element of it
has been allowed to expire before the plaintiff commences proceedings, the
courts may use their inherent jurisdiction to strike out an action in the
interests of justice.[284]
7.26 The Commission recommends that in cases where either the accrual or the
discoverability limitation period is postponed due to minority there should be
a long-stop of 10 years commencing when the plaintiff reaches the age of
majority.
"Custody of a Parent or Guardian or other Carer" Rule
7.27 In many cases where there is postponement due to incapacity under s.49, the plaintiff will have a parent or a guardian who could bring an action for him.
7.28 In this jurisdiction, the Guardianship of Infants Act, 1964, s.6, ensures that in most cases a minor will have a guardian.[285]
7.29 In respect of adults under a legal incapacity, unfortunately there is as
yet no equivalent to the
Guardianship of Infants Act, 1996
. While there
are certain situations where an incapacitated adult may be made a ward of
court, there is no general procedure whereby a guardian can be appointed to
take care of the affairs of an incapacitated adult. Clearly legislation is
needed in this area. In Alberta, such legislation takes the form of the
Dependent Adults Act, 1980
. This Act permits any interested person to
apply to the court for an order appointing a guardian in respect of an adult.
Before a guardian can be appointed, the court must be satisfied that the
person is "(a) an adult, and (b) repeatedly or continuously unable (i) to care
for himself, and (ii) to make reasonable judgments in respect of matters
relating to his person." The court then decides the particular powers which
should be given to the guardian, for instance whether he should be allowed "to
commence, compromise or settle any legal proceeding that does not relate to the
estate of the dependent adult and to compromise or settle any proceedings taken
against the dependent adult that does not related to his estate".[286]
In Western Australia there is a similar
law; the
Guardianship and Administration Act, 1990
.
7.30 The Commission recommends that legislation along the lines of the
Dependent Adults Act, 1980 in Alberta, or the Guardianship and Administration
Act, 1990 in Australia be enacted in this jurisdiction.
7.31 The fact that an action may be brought on behalf of the plaintiff by a
guardian is not currently taken into account by s.49. In cases where this is
possible it appears unnecessary to subject a defendant to a long and indefinite
period of liability in situations where there is a guardian who could take the
action within the limitation period. The Commission is of the view that this is
unduly unfair to the defendant.
7.32 Thus the Commission recommends that the limitation period should not be
postponed unless the person under a legal incapacity can show that at the time
of the incapacity he was not in the custody of a parent or guardian. At present
and until the appropriate legislation concerning incapacitated adults is
enacted, this recommendation can only be applied to minors.
7.33 Other jurisdictions have adopted a similar approach.[287] In fact there was originally a provision to this effect concerning minors in the Statute of Limitations, 1957 . However, in O'Brien v. Keogh, it was declared unconstitutional . [288] The court held that because a parent or guardian could be the potential defendant, the provision did not adequately vindicate the rights of the minor. As a result it was removed by the Statute of Limitations (Amendment) Act, 1991 . A question-mark was raised over the correctness of this decision by O'Higgins CJ in the subsequent case of Moynihan v. Greensmyth. [289]
7.34 The Commission is of the view that the difficulty highlighted in
O'Brien v. Keogh
can be avoided by providing that the limitation period
will be postponed where the claimant is actually taking an action against the
parent or guardian. Such a provision was inserted in the Alberta
Limitations
Act
,
1996
, at s.5(2).
7.35 The Commission recommends that the limitation period should be
suspended where an action is brought by the claimant against the claimants
parent's or guardian, for a cause of action which occurred when the claimant
was a minor.
Notice to Proceed
7.36 Another device, which has been adopted to meet the same problem, is a
provision allowing a defendant to start the limitation period running against
the plaintiff under disability by either serving notice to proceed on the
plaintiff[290]
or by applying to the
court to appoint a litigation guardian for this plaintiff.[291]
This would ensure the plaintiff's interests are
safeguarded. The Commission is of the view that such a provision does not
really solve any problem because the onus is on the defendant to trigger the
limitation period and a defendant is likely to be reluctant to do this as it
may encourage a plaintiff to take an action against him and may even be
interpreted as an admission of liability
on his part.
II. Fraud and Mistake
A. The Present Position
7.37 When a cause of action is in peril of being statute-barred, it is generally not a defence to plead ignorance of the statute. However at present where the action is for fraud, fraudulent concealment or relief from the consequences of mistake, the normal limitation period provided for in s.11 of the Statute of Limitations, 1957 can be postponed indefinitely, under ss.71 and 72 of the Statute of Limitations, 1957. These are considered below.
7.38 However these exceptions are subject to the limitation that a further transaction with a bona fide purchaser will not be set aside.[292] As a matter of policy the Commission is of the view that this is the correct approach and accordingly does not recommend any change in respect of this limitation.
7.39 We need to consider two positions here. Firstly, s.71 of the
Statute of
Limitations,
1957
provides that:
"(a) Where in the case of any action based on the fraud of the defendant or his
agent or of any person through whom he claims or his agent, or
(b) the right of action is concealed by the fraud of any such person,
the period of limitation shall not begin to run until the plaintiff has
discovered the fraud or could with reasonable diligence have discovered it
."
In other words, where there is fraud or fraudulent concealment, the limitation
period will not begin to run until the fraud or the concealment thereof, as
opposed to the damage, is discovered or is reasonably discoverable. In respect
of (a) above, it follows from the wording that the fraud and not just some
ancillary event must be the basis of the action; "fraud must be proved for the
claim to succeed".[293]
Similarly in respect
of (b), for the plaintiff to benefit from postponement under this section, it
is essential that an element fundamental to the right of action is concealed by
fraud, that is either: (i) the damage; (ii) the fact the damage is significant;
or (iii) the identity of the defendant.
7.40 Secondly, s.72 provides that where:
"[T]he action is for relief from the consequences of mistake, the period of
limitation shall not begin to run until the plaintiff has discovered the
mistake or could with reasonable diligence have discovered it."
In circumstances where the mistake is an essential[294]
element of the cause of action, the limitation period
will not begin to run until the actual mistake is discovered or is with
reasonable diligence[295]
discoverable. S.72
applies to all mistakes whether of fact or law.[296]
B. The Impact of the Discoverability Provision in the Context of ss.71
and 72
7.41 In the majority of cases the introduction of the new discoverability limitation period would swallow up and make redundant ss.71 and 72. This stems from the similarity between it and ss.71 and 72. These sections essentially provide for the application of a discoverability test in cases of fraud and mistake. Indeed, the New Zealand Law Commission in its Report[297] entitled " Tidying the Limitation Act " recommends in light of the proposed discoverability provision, that the equivalent of ss.71 and 72 in relation to mistake and fraud, though not fraudulent concealment, be deleted from the Act. This simplifies the law by removing two of the exceptions to the general regime.
7.42 However, while admittedly, the date a mistake becomes discoverable under
s. 72 would coincide with the date on which the resulting loss becomes
discoverable under the discoverability test, this is not necessarily the case
where fraud and concealment by fraud are concerned. In these instances,
because, unlike mistake, fraud is essentially linked to the defendant's state
of mind, it is quite conceivable that the plaintiff might discover the loss and
then only at some later stage discover the fraud or fraudulent concealment.
Another point of difference is that below we recommend ultimate limitation
periods which diverge from the 10 year long-stop to be applied to the
discoverability limitation period.
7.43 The Commission recommends for the reasons outlined above that ss.71 and
72 of the Statute of Limitations 1957 be retained.
C. Supervening Fraudulent Concealment
7.44 The interpretation of the phrase " the limitation period will not begin to run" contained in both ss.71 and 72 has caused difficulty in relation to supervening fraudulent concealment.
7.45 In respect of ss.71(1)(a) and 72(1), which deal respectively with actions based on fraud and mistake, all the relevant circumstances will be in place at the date of accrual, that is the fraud or the mistake will already have occurred, thus the statutory wording "the limitation period will not begin to run" is entirely apt. However, this is not so in relation to fraudulent concealment, which can take place either before or after the date of accrual. Both of these possibilities are covered by the terms of s.71(b). Therefore, the question arises here whether, in a case where time has already started to run, a supervening fraudulent concealment should suspend the limitation period. If this is so, a further question arises, as to whether the entire limitation period or just the remaining limitation period should be available to the plaintiff when he discovers the fraudulent concealment.
7.46 First, the question as to whether a supervening fraudulent concealment should suspend the limitation period is examined. A comparison of the wording of s.71(1)(b) with s.49(1)(a), the provision dealing with the postponement of the limitation period in respect of a legal incapacity, is useful in this respect. S.49(1)(a) provides specifically that "If, on the date when any right of action accrued for which a limitation period is fixed by this Act, the person to whom it accrued was under a disability" [our emphasis] the limitation period will be postponed. This makes it clear that the section does not apply to a case where the legal incapacity occurs after the date of accrual. On the other hand s.71 does not contain such a specification. It could perhaps be deduced from this marked difference in language, that s.71 was intended to apply to fraudulent concealment which occurs both contemporaneously with or subsequent to the date of accrual.
7.47 There does not appear to be any Irish case which turns on this point.
However, in
Morgan v. Park Developments
[298]
(when Carroll J dismissed the s.71(b) defence due to
the absence of a special relationship between the plaintiff and the foreman),
no reference was made at all to the fact that the fraudulent concealment, by
the foreman, took place after the damage was done and the limitation period had
started to run. In the English case of
Sheldon v.Outhwaite
[299]
the majority of the House of Lords took
the view that fraudulent concealment which took place after time had commenced
to run would in fact postpone the running of time under s.32(1) of the 1980
Act[300]
- the English equivalent of, and
with wording identical to, s.71(1)(b). In other words, time would stop running
and commence to run, anew, from the time of discovery of the fraudulent
concealment. Megarry VC in
Tito v. Waddell(No.2),
[301]
when interpreting the identical provision[302]
in an earlier Act, had reached the
opposite conclusion stating: "If time has already begun to run, I do not think
that a supervening fraudulent concealment will start time running again". In
the later case of
Sheldon
, the House of Lords noted that the decision of
Megarry VC on the legislation, as it had earlier stood, was
obiter
. Lord
Nichols of Birkenhead giving one of the majority speeches stated that:
"[I]f a plaintiff is aware of all facts relevant to his right of action, there
cannot be subsequent concealment of them from the plaintiff. He already knows
the position. But if he does not, and the defendant takes steps deliberately
aimed at keeping the plaintiff in the dark, there is as much need to prevent
that defendant from gaining a limitation advantage as with the defendant who
conceals the position from the outset."[303]
He held that "the purpose of s.32(1)(b) is clear; a defendant is not to obtain
an advantage from deliberately concealing a fact relevant to the plaintiff's
right of action."[304]
7.48 The second question to be examined is whether the entire limitation period or just the remainder of the limitation period, should be available to the plaintiff after he discovers the fraudulent concealment. It is clear from the judgment in Sheldon v. Outhwaite [305] that, while the preferred solution of the majority was to make the remainder of the limitation period available to the plaintiff when he discovered the fraudulent concealment, the majority felt constrained by the wording of s.32 of the 1980 Act to allow the limitation period recommence at this point.
7.49 The Commission is of the view that recommencing the full limitation period
is overly kind to the plaintiff. Therefore we recommend that s.71 be amended to
clearly indicate, that where there is a supervening fraudulent concealment,
the remainder of the limitation period, and not the entire limitation period,
will start to run against the plaintiff from when the fraudulent concealment
is discovered or discoverable.
7.50 The Commission recommends that a supervening fraudulent concealment
should suspend only the remainder of the limitation period, until the
fraudulent concealment becomes discoverable.
D. Should there be a Long-Stop?
7.51 At present under ss.71 and 72 the limitation period can be postponed
indefinitely until the plaintiff has or could with reasonable diligence
discover the fraud or mistake; there is no ultimate limitation period or
long-stop, after the expiry of which no further claim can be brought. It is
clear that while the purpose of a limitations scheme is to benefit defendants
who may be unfairly prejudiced by an excessive delay in bringing an action, it
is not intended to allow fraudulent defendants to escape the consequences of
their conduct. The introduction of a long-stop to s.71 would in certain cases
allow the wrongdoer to benefit from his own wrong. The Commission is of the
view that the Statutes of Limitations is not intended nor should it be used as
an instrument of fraud. Therefore there should be no long-stop provision. Some
Law Reform Commissions[306]
have adopted a
similar position, others have simply extended[307]
the length of the long-stop. In this regard we see no
reason to distinguish between fraud and the concealment of fraud by the
defendant.[308]
An ancillary point here is
that because a defendant cannot and is not in the future likely to be able to
insure against fraud committed by him, the absence of a long-stop is unlikely
to have any cost ramifications for the consumer.
7.52 The Commission recommends that a long-stop should not be applicable to
ss.71(a) or (b).
7.53 Different factors arise when considering the long-stop in the context of
postponement due to mistake under s.72, in that there is no requirement of any
wrong doing on the part of the defendant. Essentially it is necessary to
balance the need to achieve a fixed and determinable limitation period against
the interests of the parties to the agreement entered into under a mistake.
The Commission is of the opinion that a reasonable balance would be achieved by
applying a 30 year long-stop to all actions postponed under s.72. The
Commission reasoned that there will be very few meritorious claims after 30
years, and furthermore it is unlikely that after 30 years the quality of
evidence would allow a proper determination of the issues involved in such
claims.
7.54 The Commission recommends that a long-stop of 30 years be applied to
the postponement of the primary limitation period under s.72.
E. The Meaning of `Fraud' and `Concealed by Fraud'
7.55 The word `fraud' as used in ss.71(1)(a) and 71(1)(b) has two different meanings. Fraud in this section is given its common law meaning, in other words the tort of deceit.[309] Traditionally it has been regarded as involving "some element of moral turpitude, such as deliberate untruth or some dishonesty." [310]
7.56 On the other hand s. 71 (b) refers to a "right of action concealed by
fraud". The case-law interpreting this term shows that `fraud' in this section
is not given its common law meaning but is used in the wider equitable sense.[311]
Lord Evershed M.R. when interpreting the
English provision[312]
equivalent to
s.71(b), in
Kitchen v. Royal Air Force Association
[313]
stated that it covered conduct "[w]hich having
regard to some special relationship between the two parties concerned, is an
unconscionable thing for the one to do towards the other."[314]
Subsequent cases latched on to this reference to a
`special relationship' and in circumstances where active concealment was absent
it was regarded as a condition precedent to the application of the section.
However, the later cases no longer appear to attach as much significance to the
existence of a special relationship preferring to examine the actual
circumstances of the case at hand. Thus this liberal interpretation of the
phrase `fraudulent concealment' effectively covers any unconscionable failure
to reveal. Lord Denning's comments in
King v. Victor Par
sons
&
Co
.[315]
illustrate this point well:
"In order to show that he concealed the right of action `by fraud' it is not
necessary to show that he took active steps to conceal his wrongdoing or breach
of contract. It is sufficient that he knowingly committed it and did not tell
the owner anything about it. He did the wrong or committed the breach secretly.
By saying nothing he kept it secret. He conceals the right of action. He
conceals it by `fraud' as those words have been interpreted in the cases. To
this word `knowingly' must be added `recklessly'."[316]
7.57 The Irish courts also appear willing to adopt this liberal approach. Morris J in McDonald v McBain [317] expressed approval of Lord Denning's wide interpretation though on the facts of that case, this approach was not necessary as the plaintiff had knowledge of all the necessary facts to take the action. However, since Carroll J's judgment in Morgan v. Park Developments Ltd, [318] there is doubt as to whether this liberal interpretation is contingent on the existence of a `special relationship'. In this case the foreman (the defendant's agent) advised the plaintiff that the cracks in the building, which turned out to be symptoms of severe structural problems, were mere settlement cracks. Carroll J relied on the absence of a `special relationship' between the parties in holding there was no fraudulent concealment. This may not be a departure from the liberal approach pioneered by Lord Denning. For an alternative interpretation is suggested by Brady and Kerr,[319] namely, it may simply be a pragmatic solution to a situation which did not reveal any behaviour on the defendant's part amounting to `unconscionable conduct'. It is clear from some construction cases[320] that covering up of a defect which occurs in the course of the succeeding work is not sufficient to qualify as fraudulent concealment; some further evidence of knowledge of concealment is necessary.
7.58 The English
Limitation Act, 1980
on the recommendation of the Orr
Committee[321]
replaced "fraudulent
concealment" in s.32 (1)(b) with "deliberate concealment" to make it clear that
the section was not referring to fraud at common law but rather to the wider
equitable meaning of the word. The English initiative was also followed in New
South Wales.[322]
7.59 The Commission recommends that in section 71(1) (b) that the words
"
concealed by fraud
"
should be replaced with the words
"
deliberately concealed
"
, so that the section would
read:
"
the plaintiff's right of action is deliberately concealed by the
defendant
".
III. Survival of Actions
A. Survival of Certain Causes of Action Vested in the Deceased
Present Position
7.60 Under the present law any cause of action which is vested in a person
before his death is transmitted to his estate and his personal representatives
may take an action on behalf of the estate. [323]
S.7.1 of the
Civil Liability Act, 1961
provides
that:
"On the death of a person on or after the date of the passing of this Act all
causes of actions (other than excepted causes of action) vested in him shall
survive for the benefit of his estate."
Since there is no provision for a special limitation period for actions
surviving for the benefit of the deceased's estate, the ordinary limitation
period starting at the date of accrual applies. In circumstances where the
six year accrual limitation period is still running at the date of death, the
remainder will continue to run against the personal representative.
7.61 A practical problem may arise where there is a delay in appointing the
personal representative and most of the limitation period has already run at
the date of death. However, any exception in this situation would be open to
abuse, as it would enable a plaintiff to postpone the limitation period
indefinitely simply by not appointing a personal representative. The Commission
does not recommend that any exception be made in this situation.
Impact of the Discoverability Test
7.62 In this regard three possible situations present themselves for
consideration:
(a) The discoverability limitation period expires before the death of the
person with a cause of action, and there have been no proceedings
instituted.
This first possibility does not present any real difficulty, as the cause of
action would be statute-barred before his death and should remain barred after
his death.
(b) The discoverability limitation period is still running at the date of the
death of the person who has suffered the loss.
In this situation the personal representative will acquire the claim with the
limitation period already running against him. The knowledge of the deceased
is imputed to the personal representative.[324]
This particular situation is also dealt with in our
Personal Injury Report
, where the recommendation, (adopted in the
Statute of Limitations
(Amendment) Act,
1991), is very favourable
towards the deceased's estate:
"We consider that, where a person injured dies before the expiration of the
limitation period the period applicable in both `discoverability' and
`non-discoverability' cases as respects the cause of action surviving for the
benefit of his estate by virtue of s.7 of the
Civil Liability Act, 1961
should be three years from the date of death or the date of discoverability by
the personal representative, whichever is the later."[325]
However, the Commission is of the opinion that where physical damage as
opposed to personal injury is the basis of the action, such a generous
provision is much less justifiable.
[326]
Therefore the Commission does not recommend any
change in the law in this regard.
(c) The discoverability limitation period has not started to run at the date of
death.
The only way this situation can be dealt with is by providing that the
discoverability limitation period will run against the plaintiff's personal
representative from when it becomes discoverable to him. This would be subject
to the 10 year long-stop.
B. Survival of Certain Causes of Action Subsisting against the Deceased
Present Position
7.63 S. 8 of the
Civil Liability Act, 1961
provides that, on the death
of a person, all causes of action subsisting against him shall subsist against
his estate. S.9 (2) contains an express provision concerning limitation periods
in relation to such claims:
"No proceedings shall be maintainable in respect of any cause of action
whatsoever which has survived against the estate of a deceased person unless
either
(a) proceedings against him in respect of that cause of action were commenced
within the relevant period and were pending at the date of his death , or
(b) proceedings are commenced in respect of that cause of action within the
relevant period or within the period of two years after his death whichever
period first expires."
Impact of Discoverability
7.64 Since it is concerned with the perspective of the plaintiff, discoverability, does not affect the provision, except that the `relevant period' referred to in (b) above, will now also refer to the 3 year discoverability period.
7.65 In summary, we recommend no change in the limitations law as regards
either causes of action vested in the deceased which are taken by his estate,
or causes of action subsisting against the deceased and taken against his estate.
CHAPTER EIGHT: SUMMARY OF RECOMMENDATIONS
Chapter Two: The Discoverability Test
The Commission recommends that the discoverability limitation period commence
when the claimant first knew or in the circumstances ought reasonably to have
known of the elements listed in the discoverability formula.(
para.
2.29)
The Commission recommends that the discoverability limitation period should be
applicable to all actions for breach of duty whether the breach occurs in tort,
contract, statute or independent of any such provision, except that this should
not include libel, slander, and injurious falsehood.
( para.
2.40)
The Commission recommends that the Alberta Limitations Act, 1996 model, be
taken as the model for the drafting of the discoverability test
.
See
Appendix 1.
(para.2.54)
Thus the Statutes of Limitations 1957-2000 should be amended to include the
following:
"An action claiming damage in respect of loss or damage (other than personal
injury) caused by a breach of duty whether the duty exists in tort, contract,
statute, or independent of any such provision, shall not be brought after the
later of either the expiration of:
(a) six years from the date on which the cause of action accrued; or
(b) three years from the date on which the person first knew or in the
circumstances ought reasonably to
have known:
(i) that the loss for which the person seeks a remedy had occurred;
(ii) that the damage was attributable to the conduct of the defendant; and
(iii) that the loss, assuming liability on the part of the defendant, warrants
bringing proceedings."
The Commission also recommends that the clause set out below be included in the
interpretations section of the draft legislation.
"The Law Reform Commission Report (LRC-64, 2001) may be considered by any court
when interpreting any provision of this Act and shall be given such weight as
the court considers appropriated in the circumstances." (
See paras.
2
.53-2.54)
Chapter Three: Discoverability Combined with the Present Accrual Law
The Commission recommends the following test: the plaintiff may take action
within either six years from the accrual of the cause of action (present
position) or three years from the date the cause of action is or ought to be
discoverable to the plaintiff, whichever expires later.
(para. 3.05)
Chapter Four: The Long-Stop Period
The Commission recommends that the length of the long-stop should be 10 years.
(para.4.16)
The Commission recommends that the long-stop start at the date of accrual of
the cause of action.
(para. 4.21)
Chapter Five: Consequences of a Discoverability Test
Separate Incidents of Damage
The Commission is of the opinion that the general rule to be applied should be
that the limitation period will start to run from the time the first item of
loss resulting from the wrongful act becomes discoverable, and that any other
damage which becomes discoverable after that date is part of the original cause
of action. The exceptions to the general rulewhich apply in the
context of accrual should also apply here to the extent that they are accepted
by the Irish courts.
(para.5.13)
Successive Purchasers
It appears that there is no substantive rule in Irish law which prevents a
claim in tort for damage to property where the plaintiff had no interest in the
property at the time of the damage being inflicted. Nonetheless, the Commission
is of the view that in order to put the matter beyond doubt there should be
legislation to this effect.
(para.5.20)
The Commission recommends that the limitation period should start to run
against a successor owner of a claim when it is or ought to be discoverable by
either a predecessor or the successor owner of the claim.
(para.5.34)
Discoverability and Equitable Reliefs
The Commission does not recommend any change to the existing statutory
legislation which excludes specific performance, injunctions and other
equitable reliefs from the purview of the Statute of Limitations.
(para.5.37)
Burden of Proof
In summary, it is established at common law that when there is joinder of issue
the burden of proving that proceedings in respect of a cause of action were
brought within the limitation period[327]
is
on the plaintiff. The Commission is of the view that this is and should remain
the position in this jurisdiction. However, because the incidence of the burden
of proof is an area of law better left to development by the courts and one
where a degree of flexibility in the law is necessary, we do not recommend
legislation.
(para.5.45)
In respect of the provisions relating to postponement of the limitation period
due to legal incapacity, fraud or mistake, the onus is on the plaintiff in each
case to prove that the limitation period has been postponed because of the
existence of one of these factors. The Commission is of the view that this is
the correct approach and does not recommend any change in the law.
(para.5.46-5.47)
The Commission recommends that the burden of proving that proceedings in
respect of a cause of action were brought within the discoverability limitation
period should be on the plaintiff. The Commission is of the view that
legislation to this effect is not required.
(para.5.49)
Transitional Provisions
The Commission recommends that the proposed law in relation to latent damage
should apply to actions which accrue only after it comes into force.
(para.5.59)
Chapter Six: Accrual of Causes of Action- Starting Point for the
Long-Stop
Construction Industry Claims
The Commission recommends that in construction liability claims, a cause of
action in contract should accrue for all the participants in the construction
process at the date of completion or purported completion.
(para.6.18)
The Commission also recommends that in construction liability claims,[328]
the starting point of the long-stop for
construction liability claims in both tort and contract should be the date of
completion or purported completion.
(para 6.41.)
The Commission also recommends that construction liability claims be defined as
follows:
Construction liability claims are claims arising from all construction
operations. Construction operation means, an operation of any of the following
descriptions-
(a) construction, alteration, repair, maintenance, extension, demolition or
dismantling of buildings, or structures forming, or to form part of the land
(whether permanent or not);
(b) construction, alteration, repair, maintenance, extension, demolition or
dismantling of any works forming, or to form, part of the land including
(without prejudice to the foregoing) walls, roadworks, tunnels, bridges,
power-lines, telecommunications apparatus, aircraft runways , docks and
harbours, railways, reservoirs, water-mains, wells, sewers, industrial plant
and installations for purposes of land drainage, coast protection or
defence;
(c) installation in any building or structure of fittings or structures forming
part of the land, including (without prejudice to the foregoing) systems of
heating, lighting, air-conditioning, ventilation, power supply, drainage,
sanitation, water supply or fire protection, or security or communications
systems;
(d) external or internal cleaning of buildings and structures, so far as
carried out in the course of their construction, alteration, repair, extension
or restoration;
(e) operations which form an integral part of, or are preparatory to, or are
for rendering complete, such operations as are previously described in this
subsection, including site clearance, earth-moving, excavation, tunnelling and
boring, laying of foundations, erection, maintenance or dismantling of
scaffolding, site restoration, landscaping and the provision of roadways and
other access works.
(para.6.44)
Chapter Seven: Special Cases
Legal Incapacity
The Commission recommends that s.48(1)(c) should be removed from the
Statute
of Limitations, 1957
.
(para.7.04)
The Commission recommends that the term "disability" in s.49 should be replaced
with the term "legal incapacity".
(para.7.07)
The Commission is of the view that unsoundness of mind should be replaced with
a definition of disability along the lines of the Canadian model. Thus s.48(1)b
should be amended to read "where a person is incapable of the management of his
affairs because of disease or impairment of physical or mental condition."
(para.7.13)
The Commission recommends that if on the date when any right of action for
which a limitation period is fixed by this act, became discoverable, and the
person to whom it became discoverable was under a legal incapacity, the action
may be brought at any time before the expiration of three years after the legal
incapacity has ceased
.(para.7.15)
The Commission recommends that the legislation should be changed to allow a
supervening legal incapacity to suspend the accrual and the proposed
discoverability limitation periods.
(para.7.20)
The Commission recommends that in cases where either the accrual or the
discoverability limitation period is postponed under s.49 due to `unsoundness
of mind'; there should be a 30 year long-stop for physical damage
claims.
(para.7.24)
The Commission recommends that in cases where either the accrual or the
discoverability limitation period is postponed due to minority, there should be
a long-stop of 10 years commencing when the plaintiff reaches the age of
majority.
(para.7.26)
The Commission recommends that legislation along the lines of the
Dependent
Adults Act, 1980
in Alberta, or the
Guardianship and Administration Act,
1990
in Australia be enacted in this jurisdiction.
(para.7.30)
The Commission recommends that the limitation period should not be postponed
unless the person under a legal incapacity can show that at the time of the
incapacity he was not in the custody of a parent or guardian. However, until
the appropriate legislation concerning incapacitated adults is enacted, this
recommendation can only apply to minors.
(para.7.32)
The Commission recommends that the limitation period should be suspended where
an action is brought by the claimant against the claimants parent's or
guardian, for a cause of action which occurred when the claimant was a minor.
(para.7.35)
Fraud and Mistake
The Commission recommends that ss.71 and 72 of the
Statute of Limitations,
1957
be retained.
(para.7.43)
The Commission recommends that a supervening fraudulent concealment should
suspend only the remainder of the limitation period, until the fraudulent
concealment becomes discoverable.
(para.7.50)
The Commission recommends that a long-stop should not be applicable to s.71(a)
or (b).
(para.7.52)
The Commission recommends that a long-stop of 30 years be applied to the
postponement of the primary limitation period under s.72.
(para.7.54)
The Commission recommends that in s.71(1) (b), the words "concealed by fraud"
should be replaced with the words "deliberately concealed", so that the section
would read: "the plaintiff's right of action has been deliberately concealed by
the defendant".
(para.7.59)
In summary, we recommend no change in the limitations law as regards either
causes of action vested in the deceased which are taken by his estate, or
causes of action subsisting against the deceased and taken against his
estate.
(para.7.65)
APPENDIX 1: DRAFT LEGISLATION
STATUTE OF LIMITATIONS (AMENDMENT) ACT
An Act to amend and extend the Statute of Limitations, 1957, by making new
provisions as regards the date from which the period of limitations is to run
in respect of actions for certain loss and damage (not being loss and damage
for personal injuries), and to amend related provisions in other statutes, and
to provide for other matters connected therewith.
Be it enacted by the Oireachtas as follows:
PART I
PRELIMINARY AND GENERAL
1. (1)This Act may be cited as the Statute of Limitations (Amendment) Act
2001.
(2)This Act shall not apply to any cause of action accruing before its
passing.
(3)The Principal Act, the 1991 Act, the 2000 Act and this Act shall be
construed as one, and may be cited together as the Statutes of Limitations.
2. (1)In this Act -
"The Principal Act" means the Statute of Limitations, 1957.
"The 1991 Act" means the Statute of Limitations (Amendment), Act 1991.
"The 2000 Act" means the Statute of Limitations (Amendment) Act, 2000.
"Damage" in Part I and II of this Act means loss or damage caused by a breach
of duty, whether the duty exists in tort, contract, statute or independent of
any such provisions, except that it does not include loss or damage caused by
libel, slander or injurious falsehood.
"Personal representative" includes any person who is or has been a personal
representative of the deceased, including an executor who has not proved the
will (whether or not that person has renounced probate).
"Construction claim" means a claim for damages for loss or damage arising from
all construction operations which include:
(a) construction, alteration, repair, maintenance, extension, demolition or
dismantling of buildings, or structures forming, or to form part of the land
(whether permanent or not);
(b) construction, alteration, repair, maintenance, extension, demolition or
dismantling of any works forming, or to form, part of the land including
(without prejudice to the foregoing) walls, roadworks, tunnels, bridges,
power-lines, telecommunications apparatus, aircraft runways, docks and
harbours, railways, reservoirs, water-mains, wells, sewers, industrial plant
and installations for purposes of land drainage, coast protection or
defence;
(c) installation in any building or structure of fittings or structures forming
part of the land, including (without prejudice to the foregoing) systems of
heating, lighting, air-conditioning, ventilation, power supply, drainage,
sanitation, water supply or fire protection, or security or communications
systems;
(d) external or internal cleaning of buildings and structures, so far as
carried out in the course of their construction, alteration, repair, extension
or restoration;
(e) operations which form an integral part of, or are preparatory to, or are
for rendering complete, such operations as are previously described in this
subsection, including site clearance, earth-moving, excavation, tunnelling and
boring, laying of foundations, erection, maintenance or dismantling of
scaffolding, site restoration, landscaping and the provision of roadways and
other access works.
(2) For the purposes of this Act a construction claim in contract accrues on
the date of the issue of the certificate of practical completion, or on the
date of purported completion of the building work where no such certificate is
issued.
(3) The Law Reform Commission Report (LRC-64, 2001) may be considered by any
court when interpreting any provision of this Act and shall be given such
weight as the court considers appropriate in the circumstances.
PART II
PERIODS OF LIMITATION FOR NON-PERSONAL INJURY ACTIONS
3. (1) An action claiming damage in respect of loss or damage (other than
personal injury) caused by a breach of duty whether the duty exists in tort,
contract, statute, or independent of any such provision, shall not be brought
after the later of either the expiration of:
(a) six years from the date on which the cause of action accrued; or
(b) three years from the date on which the person first knew or in the
circumstances ought reasonably to have known:
(i) that the loss for which the person seeks a remedy had occurred;
(ii) that the damage was attributable to the conduct of the defendant; and
(iii) that the loss, assuming liability on the part of the defendant, warrants
bringing proceedings.
(2) Notwithstanding subsection (1), no claim to which subsection (1) applies
shall be brought later than 10 years after the date on which the cause of
action accrued.
(3) Notwithstanding subsections (1) and (2), a construction claim cannot be
brought more than 10 years after the date of issue of the certificate of
practical completion in respect of the construction operation or, the date of
purported completion of the construction operation in cases where no
certificate of practical completion is issued.
(4) Section 11(2) of the Principal Act as amended by the 1991 Act is hereby
amended by the substitution of the following paragraph for paragraph (a):
" Subject to section 3(1) of the Statute of Limitations (Amendment) Act, 1991,
and to sections 3 (1), (2), and (3) of the Statute of Limitations (Amendment)
Act, 2001, an action founded on tort shall not be brought after the expiration
of six years from the date on which the cause of action accrued."
4. (1) Notwithstanding section 11 (2)(d) (inserted by section 13(8) of the Sale
of Goods and Supply of Services Act, 1980) of the Principal Act, an action for
damages under section 13(7) of the Sale of Goods and Supply of Services Act
1980, shall not be brought after the expiration of two years from the date on
which the cause of action accrued, or the appropriate date in section 3(b),
whichever is later.
(2) The reference in section 21(4) of the Control of Dogs Act 1986, to section
11(2) (b) of the Principal Act as amended by the 1991 Act shall be construed in
actions for damage as a reference to subsection (1) of this section.
5. It shall not be a bar to an action for damage to property that the plaintiff had no interest in the property at the time at which the damage occurred or became discoverable.
6. The limitation period provided by section 3(1)(b) begins
(a) against a successor owner of a claim when either a predecessor owner or the
successor owner of the claim first knew or ought reasonably to have known, the
matters set out in subparagraphs (i)-(iii) of section 3(1)(b), whichever is the
earlier
(b) against a personal representative of a deceased person as a successor owner
of a claim, when either the deceased or the personal representative first knew
or in the circumstances ought reasonably have known, of the matters set out in
subparagraphs (i)-(iii) of section 3(1)(b), whichever is the earlier.
PART III
EXTENSION OF LIMITATION PERIODS IN CASE OF LEGAL INCAPACITY, FRAUD AND
MISTAKE
7. The term 'disability' as it appears in the Statutes of Limitation 1957, 1991 and 2000, is replaced by the term 'legal incapacity'.
8. Section 48 of the Principal Act is hereby amended by the substitution of the
following subsection for subsection (1):
"(1) For the purposes of this Act, a person shall be under a disability
while-
(a) s/he is a minor who is not under the actual custody of a parent or
guardian, or
(b) s/he is incapable of the management of his/her affairs because of disease
or impairment of his/her physical or mental condition."
9. Section 49(1) of the Principal Act is hereby amended by the substitution of
the following paragraph for paragraph (a) :
"(a)(i) If on or after the date when a limitation period fixed by this Act
commences, the plaintiff is under a legal incapacity, subject to the subsequent
provisions of this section, the limitation period, or in circumstances where it
has already commenced, the remainder of the limitation period, is suspended
until such time as the legal incapacity ceases or the plaintiff dies.
(ii) Notwithstanding subparagraph (1), no claim to which subparagraph (1)
applies may be brought after 30 years from the date the cause of action
accrued.
(iii) Where the limitation period is suspended under subsection (i) because the
plaintiff is a minor who is not under the actual custody of a parent or
guardian, no claim may be brought later than 10 years from the date the cause
of action accrued.
(iv) Where an action is brought by the plaintiff against the plaintiff's parent
or guardian, and the claim arose while the plaintiff was a minor, the operation
of the limitation period fixed by this Act shall, subject to subparagraph
(iii), be suspended during the period that the plaintiff is a minor."
10. Section 71 of the Principal Act shall be amended by the substitution of the
following subsection for subsection (1):
"(1) Where, in the case of an action for which a period of limitation is fixed
by this Act, either-
(a) the action is based on the fraud of the defendant or his agent or of any
person through whom he claims or his agents, or
(b) the plaintiff's right of action has been deliberately concealed by any such
person,
the period of limitation shall not begin to run until the person has discovered
the fraud or could with reasonable diligence have discovered it."
11. Section 72 of the Principal Act is hereby amended by the substitution for
that section of the following section:
"72(1) Where, in the case of any action for which a period of limitation is
fixed by this Act, the action is for relief from the consequences of mistake,
the period of limitation shall not begin to run until the plaintiff has
discovered the mistake or could with reasonable diligence have discovered
it.
(2) Notwithstanding subsection (1), no action shall be brought after the expiry
of 30 years from the date the cause of action accrued."
(2) Nothing in subsection (1) or (2) of this section shall enable any action to
be brought to recover, or enforce any charge against, or, set aside any
transaction affecting, any property which has been purchased for valuable
consideration, subsequent to the transaction in which the mistake was made, by
a person who did not know or have reason to believe that the mistake was made."
APPENDIX 2: ACKNOWLEDGEMENTS
The Commission wishes to acknowledge the advice and assistance of those who
made written submissions on this project, who met with the Commission to advise
it on particular matters, and all those who attended the seminar.
Responsibility for this Report, of course, rests with the Commission alone.
Persons who forwarded submissions
:
Eoin Quill
University of Limerick
Fiona Barry
William Fry Solrs.
Elma Lynch
Solicitors' Mutual Defence Fund Ltd
Des Byrne
Irish Mortgage & Savings Association (IMSA)
Charles Lysaght
Barrister -at- Law
John Graby
Royal Institute of the Architects of Ireland (RIAI)
Mike Jones
Construction Industry Federation (CIF)
Daniel B. McCrystal
Consultant Quantity Surveyor
Denise O'Connor
McCann FitzGerald Solrs.
Michael McCarthy
Department of the Environment and Local Government
Irene McMahon
Persons present at the Seminar on 23rd of March 1999: The
Statutes of Limitation: Claims in Contract and Tort in Respect of Latent Damage
(other than Personal Injury)
Michael Green
Construction Industry Federation
Eimer O' Rourke
Irish Mortgage and Savings Association
Dan McCrystal
Acrhitects' and Surveyors' Institute
David Keane
Architects' and Surveyors' Institute
Eoin Quill
University of Limerick
Dr Gerard Quinn
University College Galway
Eoin O' Dell
Trinity College, Dublin
Michael Foster
Law Reform Advisory Committee for Northern Ireland
Michael O' Reilly
McCann FitzGerald Solicitors
Helen Collins
McCann FitzGerald Solicitors
Elizabeth Crilly
McCann FitzGerald Solicitors
Denise O' Connor
McCann FitzGerald Solicitors
John Molloy
Solicitor
Greg O' Neill
Brophy Solicitors
Hugh O'Neill
Solicitor
Elma Lynch
The Solicitors' Defence Fund
Fiona Barry
William Fry Solicitors
Imelda Tierney
Arthur Cox Solicitors
Peggy O' Rourke
Arthur Cox Solicitors
Tony Williams
Matheson Ormsby Prentice Solicitors
Owen McIntyre
Law Society of Ireland
The Hon Mr Justice Budd
High Court
Her Honour Judge Yvonne Murphy
Circuit Court
Rex Mackey
Senior Counsel
Charles Lysaght
Barrister -at- Law
Persons who assisted the Commission on other Occasions
Anthony Kerr
Barrister -at- Law, University College Dublin
Click here for Picture
LIST OF PUBLICATIONS
First Programme for Examination of Certain Branches of the Law with a View to their Reform (December 1976) (Prl. 5984) [out of print] |
|
Working Paper No. 1-1977, The Law Relating to the Liability of Builders, Vendors and Lessors for the Quality and Fitness of Premises (June 1977) |
|
Working Paper No. 2-1977, The Law Relating to the Age of Majority, the Age for Marriage and Some Connected Subjects (November 1977) |
|
Working Paper No. 3-1977, Civil Liability for Animals (November 1977) |
[£ 2.50 Net] |
First (Annual ) Report (1977) (Prl. 6961) |
[ 40p Net] |
Working Paper No. 4-1978, The Law Relating to Breach of Promise of Marriage (November 1978) |
|
Working Paper No. 5-1978, The Law Relating to Criminal Conversation and the Enticement and Harbouring of a Spouse (December 1978) |
|
Working Paper No. 6-1979, The Law Relating to Seduction and the Enticement and Harbouring of a Child (February 1979) |
|
Working Paper No. 7-1979, The Law Relating to Loss of Consortium and Loss of Services of a Child (March 1979) |
|
Working Paper No. 8-1979, Judicial Review of Administrative Action: the Problem of Remedies (December 1979) |
|
Second (Annual ) Report (1978/79) (Prl. 8855) |
[ 75p Net] |
Working Paper No. 9-1980, The Rule Against Hearsay (April 1980) |
[£ 2.00 Net] |
Third (Annual ) Report (1980) (Prl. 9733) |
[ 75p Net] |
First Report on Family Law - Criminal Conversation, Enticement and Harbouring of a Spouse or Child, Loss of Consortium, Personal Injury to a Child, Seduction of a Child, Matrimonial Property and Breach of Promise of Marriage (LRC 1-1981) (March 1981) |
|
Working Paper No. 10-1981, Domicile and Habitual Residence as Connecting Factors in the Conflict of Laws (September 1981) |
[£ 1.75 Net] |
Fourth (Annual ) Report (1981) (Pl. 742) |
[ 75p Net] |
Report on Civil Liability for Animals (LRC 2-1982) (May 1982) |
[£ 1.00 Net] |
Report on Defective Premises (LRC 3-1982) (May 1982) |
[£ 1.00 Net] |
Report on Illegitimacy (LRC 4-1982) (September 1982) |
[£ 3.50 Net] |
Fifth (Annual ) Report (1982) (Pl. 1795) |
[ 75p Net] |
Report on the Age of Majority, the Age for Marriage and Some Connected Subjects (LRC 5-1983) (April 1983) |
|
Report on Restitution of Conjugal Rights, Jactitation of Marriage and Related Matters (LRC 6-1983) (November 1983) |
|
Report on Domicile and Habitual Residence as Connecting Factors in the Conflict of Laws (LRC 7-1983) (December 1983) |
|
Report on Divorce a Mensa et Thoro and Related Matters (LRC 8-1983) (December 1983) |
|
Sixth (Annual ) Report (1983) (Pl. 2622) |
[£ 1.00 Net] |
Report on Nullity of Marriage (LRC 9-1984) (October 1984) |
[£ 3.50 Net] |
Working Paper No. 11-1984, Recognition of Foreign Divorces and Legal Separations (October 1984) |
|
Seventh (Annual ) Report (1984) (Pl. 3313) |
[£ 1.00 Net] |
Report
on Recognition of Foreign Divorces and Legal Separations |
|
Report on Vagrancy and Related Offenses (LRC 11-1985) (June 1985) |
[£ 3.00 Net] |
Report on the Hague Convention on the Civil Aspects of International Child Abduction and Some Related Matters (LRC 12-1985) (June 1985) |
|
Report on Competence and Compellability of Spouses as Witnesses (LRC 13-1985) (July 1985) |
[£ 2.50 Net] |
Report
on Offenses Under the Dublin Police Acts and Related Offences |
|
|
|
Report on the Hague Convention on the Taking of Evidence Abroad in Civil or Commercial Matters (LRC 16-1985) (August 1985) |
|
Report on the Liability in Tort of Minors and the Liability of Parents for Damage Caused by Minors (LRC 17-1985) (September 1985) |
|
Report on the Liability in Tort of Mentally Disabled Persons (LRC 18-1985) (September 1985) |
|
Report on Private International Law Aspects of Capacity to Marry and Choice of Law in Proceedings for Nullity of Marriage (LRC 19-1985) (October 1985) |
|
Report on Jurisdiction in Proceedings for Nullity of Marriage, Recognition of Foreign Nullity Decrees, and the Hague Convention on the Celebration and Recognition of the Validity of Marriages (LRC 20-1985) (October 1985) |
|
Eighth (Annual ) Report (1985) (Pl. 4281) |
[£ 1.00 Net] |
Report on the Statute of Limitations: Claims in Respect of Latent Personal Injuries (LRC 21-1987) (September 1987) |
|
Consultation Paper on Rape (December 1987) |
[£ 6.00 Net] |
Report on the Service of Documents Abroad re Civil Proceedings -the Hague Convention (LRC 22-1987) (December 1987) |
|
Report on Receiving Stolen Property (LRC 23-1987) (December 1987) |
[£ 7.00 Net] |
Ninth (Annual ) Report (1986-1987) (Pl. 5625) |
[£ 1.50 Net] |
Report on Rape and Allied Offences (LRC 24-1988) (May 1988) |
[£ 3.00 Net] |
Report on the Rule Against Hearsay in Civil Cases (LRC 25-1988) (September 1988) |
|
Report on Malicious Damage (LRC 26-1988) (September 1988) |
[£ 4.00 Net] |
Report on Debt Collection: (1) The Law Relating to Sheriffs (LRC 27-1988) (October 1988) |
[£ 5.00 Net] |
Tenth (Annual ) Report (1988) (Pl. 6542) |
[£ 1.50 Net] |
Report on Debt Collection: (2) Retention of Title (LRC 28-1988) (April 1989) |
[£ 4.00 Net] |
Report on the Recognition of Foreign Adoption Decrees (LRC 29-1989) (June 1989) |
|
Report on Land Law and Conveyancing Law: (1) General Proposals (LRC 30-1989) (June 1989) |
|
Consultation Paper on Child Sexual Abuse (August 1989) |
[£10.00 Net] |
Report on Land Law and Conveyancing Law: (2) Enduring Powers of Attorney (LRC 31-1989) (October 1989) |
|
Eleventh (Annual ) Report (1989) (Pl. 7448) |
[£ 1.50 Net] |
Report
on Child Sexual Abuse (LRC 32-1990) (September 1990) |
|
Report on Sexual Offences against the Mentally Handicapped (LRC 33-1990) (September 1990) |
|
Report on Oaths and Affirmations (LRC 34-1990) (December 1990) |
[£ 5.00 Net] |
Report
on Confiscation of the Proceeds of Crime (LRC 35-1991) |
|
Consultation Paper on the Civil Law of Defamation (March 1991) |
[£20.00 Net] |
Report on the Hague Convention on Succession to the Estates of Deceased Persons (LRC 36-1991) (May 1991) |
|
Twelfth (Annual ) Report (1990) (Pl. 8292) |
[£ 1.50 Net] |
Consultation Paper on Contempt of Court (July 1991) |
[£20.00 Net] |
Consultation Paper on the Crime of Libel (August 1991) |
[£11.00 Net] |
Report on the Indexation of Fines (LRC 37-1991) (October 1991) |
[£ 6.50 Net] |
Report on the Civil Law of Defamation (LRC 38-1991) (December l99l) |
[£ 7.00 Net] |
Report on Land Law and Conveyancing Law: (3) The Passing of Risk from Vendor to Purchaser (LRC 39-1991) (December 1991); (4) Service of Completion Notices (LRC 40-1991) (December 1991) |
|
Report on the Crime of Libel (LRC 41-1991) (December 1991) |
[£ 4.00 Net] |
Report on United Nations (Vienna) Convention on Contracts for the International Sale of Goods 1980 (LRC 42-1992) (May 1992) |
[£ 8.00 Net] |
Thirteenth (Annual ) Report (1991) (PI. 9214) |
[£ 2.00 Net] |
Report on The Law Relating to Dishonesty (LRC 43-1992) (September 1992) |
[£20.00 Net] |
|
|
|
[£20.00 Net] |
Consultation Paper on Occupiers' Liability (June 1993) [out of print] |
[£10.00 Net] |
Fourteenth (Annual ) Report (1992) (PN. 0051) |
[£ 2.00 Net] |
Report on Non-Fatal Offences Against The Person (LRC 45-1994) (February 1994) |
[£20.00 Net] |
Consultation Paper on Family Courts (March 1994) |
[£10.00 Net] |
Report on Occupiers' Liability (LRC 46-1994) (April 1994) |
[£ 6.00 Net] |
Report on Contempt of Court (LRC 47-1994) (September 1994) |
[£10.00 Net] |
Fifteenth (Annual ) Report (1993) (PN. 1122) |
[£ 2.00 Net] |
Report on the Hague Convention Abolishing the Requirement of Legalisation for Public Documents (LRC 48-1995) (February 1995) |
|
Consultation Paper on Intoxication as a Defence to a Criminal Offence (February 1995) |
[£10.00 Net] |
Report on Interests of Vendor and Purchaser in Land during the period between Contract and Completion (LRC 49-1995) (April 1995) |
[£ 8.00 Net] |
Sixteenth (Annual ) Report (1994) (PN. 1919) |
[£ 2.00 Net] |
An Examination of the Law of Bail (LRC 50-1995) (August 1995) |
[£10.00 Net] |
Report on Intoxication (LRC 51-1995) (November 1995) |
[£ 2.00 Net] |
Report on Family Courts (LRC 52-1996) (March 1996) |
[£10.00 Net] |
Seventeenth (Annual ) Report (1995) (PN. 2960) |
[£ 2.50 Net] |
Report on Sentencing (LRC 53-1996) (August 1996) |
[£ 8.00 Net] |
Consultation Paper on Privacy: Surveillance and the Interception of Communications (September 1996) |
|
Report on Personal Injuries (LRC 54-1996) (December 1996) |
[£10.00 Net] |
Consultation Paper on the Implementation of The Hague Convention on Protection of Children and Co-operation in Respect on Intercountry Adoption,1993 (September 1997) |
|
Report on The Unidroit Convention on Stolen or Illegally Exported Cultural Objects (LRC 55-1997)(October 1997) |
|
Report on Land Law and Conveyancing Law; (6) Further General Proposals including the execution of deeds (LRC 56-1998) (May 1998) |
|
Consultation Paper on Aggravated, Exemplary and Restitutionary Damages (May 1998) |
|
Report on Privacy: Surveillance and the Interception of Communications (LRC 57-1998)(June 1998) |
|
Report on the Hague Convention on Protection of Children and Co-operation in Respect on Intercountry Adoption,1993 (LRC-58) (June 1998) |
|
Consultation
Paper on The Statutes of Limitation: Claims in Contract and Tort in Respect of
Latent Damage (Other Than Personal Injury) |
|
Consultation Paper on Statutory Drafting and Interpretation: Plain Language and the Law (July 1999) (LRC-CP14-1999) |
|
Consultation
Paper on Section 2 of the Civil Liability (
Amendment
) Act, 1964:
The
Deductibility of Collateral Benefits from Awards of Damages
|
|
Report on Gazumping (LRC 59-1999) (October 1999) |
[£ 5.00 Net] |
Twenty First (Annual ) Report (1999) (PN. 8643) |
[£3.00 Net] |
Report on Aggravated, Exemplary and Restitutionary Damages (LRC 60 - 2000) (August 2000) |
[£6.00 Net] |
Consultation Paper on the Law of Limitation of Actions Arising from Non-Sexual Abuse Of Children (LRC-CP16-2000) (September 2000) |
[£5.00 Net] |
Second Programme for Examination of Certain Branches of the law with a view to their Reform 2000-2007 |
|
Report on Statutory Drafting and Interpretation: Plain Language and the Law (LRC 61-2000) (December 2000) |
[£6.00 Net] |
Report
on the Rule against Perpetuities and Cognate Rules |
[£6.00 Net] |
Report on Variation of Trusts (LRC 63-2000) (December 2000) |
[£8.00 Net] |
[1]
Per Best CJ in
A'Court v. Cross
(1825) 3 Bing 329, 332-333.
[2]
Law Reform Commission
Consultation Paper
on the Statutes of Limitation: Claims in Contract and Tort in Respect of Latent
Damage (other than Personal Injury
) (November, 1998) at 7.
[3]
Legislation dealing with non-sexual
physical abuse cases, and legislation dealing with latent damage (other than
personal injury).
[4]
In cases involving personal injuries, the
limitation period is three years from the accrual of the cause of action, or
the date of knowledge, as defined in s.2 of the
Statute of Limitations
(Amendment) Act, 1991
, if it is
later.
[5]
Read v. Brown
(1888) 22 QBD 128, 131
per
Lord Esher MR, tacitly accepted by Finlay CJ in
Hegarty
v.O'Loughran
[1990] 1 IR 148.
[6]
Per
Griffin J in
Hegarty
ibid
at 178.
[7]
[1983] 2 AC 1.
[8]
While subsequent English cases have
limited
Pirelli
to the factual scenario with which it was concerned,
that is where there is an
inter partes
professional relationship or a
special relationship amounting to reliance, the decision on the limitation
point still stands. See
Nitrigin Eireann Teoranta v. Inco Alloys Ltd
[1992] 1 All ER 854;
28 Halsbury's Laws of England
(4th ed. Reissue)
para.821. More importantly the
Latent Damage Act, 1986
in the UK has
altered the picture considerably. This is discussed
below
, at
paras.1.09-1.10. In terms of Irish law however,
Pirelli
found favour
with the Supreme Court in
Hegarty v. O Loughran
and is therefore still
relevant. See para. 1.03.
[9]
[1976] QB 858.
[10]
The
Latent Damage Act, 1986
was
enacted to address the potential for injustice that the
Pirelli
decision
revealed.
[11]
[1983] ILRM 156.
[12]
Ibid.
at 160.
[13]
[1990] 1 IR 148.
[14]
Ibid.
at164.
[15]
Law Reform Commission,
Report on the
Statute of Limitations: Claims in Respect of Latent Personal Injuries (No. 21,
1987).
[16]
Ibid
. at 42, quoting from
Morgan v. Park Developments
[1983] ILRM 156, 160 (per Carroll J).
[17]
Attempts to have the Bill amended at
Committee Stage to include "non-personal injuries" were ruled out of order: see
409 Dáil Debates cols.2333-2350. See paras. 2.01-2.19 for an analysis of
the 1991 Act.
[18]
These constituent parts of "knowledge"
are almost identical to those found in s.14(1) of the English
Limitation
Act, 1980
. See also
Whitely v. Minister for Defence, Ireland and the
Attorney General
, [1997] 2 ILRM 416, where Quirke J. deals with some of the
principles concerning the application of s.2 of the
Statute of Limitations
(Amendment) Act, 1991
.
[19]
S.7 of the Act implementing Article 10
of the Directive 85/374/EEC.
[20]
S.7(5) (c) of the Liability for
Defective Products Act, 1991.
[21]
In Canada and the United States,
discoverability provisions are widespread. Latent defects are also catered for
in the laws of New Zealand, Scotland, England and Wales, Austria, Norway, Italy
and France. See chap. 3 of our
Consultation Paper
on The Statutes of
Limitation: Claims in Contract and Tort in respect of Latent Damage (other than
Personal Injury
) (Nov.1998).
[22]
Report on Latent Damage
(No.24,
1984) at 19. It was only concerned with actions for negligence not involving
personal injury.
[23]
S.14A(7) This is essentially the same
formula used to define `significant' in s.14(2) of the
Limitation Act,
1980
in respect of personal injury. Although the word 'significant' is not
employed in s.14A(7).
[24]
These are the same as under s.2 (1)
(c)-(e) of the Irish
Statute of Limitations (Amendment) Act, 1991.
[25]
The purpose of the 1991 Act was to
provide for a discoverability test in relation to latent personal injury
cases.
[26]
S.2(1).
[27]
S.2(2).
[28]
Per
O' Higgins J in
Gallagher
v. Minister for Defence
High Court, [1998] 4 IR 457, citing Lord Donaldson
in
Halford v. Brookes
[1991] 1 WLR 428, 433. See also
Nash v. Eli
Lilly & Co
[1993] 1 WLR 782, 792.
[29]
Dobbie v. Medway Health Authority
[1994] 1 WLR 1234.
[30]
S. 14(2)
Limitations Act,
1980
.
[31]
[1977] 1 WLR 1073, 1081.
[32]
LRC No.21, 1987 at 17.
[33]
Report on the Statute of Limitations:
Claims in Respect of Latent Personal Injuries
(No. 21, 1987) at 45.
[34]
[1998] 4 IR 442.
Whitely
was
recently confirmed by the Supreme Court in
Bolger v. O'Brien
[1999] 2 ILRM 372.
[35]
[1998] 4 IR 442, 452-453.
[36]
Ibid.
at 453.
[37]
"Knowledge which he might reasonably
have been expected to acquire from facts observable or ascertainable by
him".
[38]
High Court, 24 April 1998.
[39]
Ibid
. at 12.
[40]
Ibid.
at 13.
[41]
[1999] 2 ILRM 372.
[42]
Ibid
. at 380,
per
Hamilton
CJ.
[43]
Report on
the
Statute
of Limitations Claims in Respect of Latent Personal Injuries
(No.21,
2000).
[44]
[1993] 1 WLR 782 at 799.
[45]
[1997] QB 402.
[46]
Ibid.
[47]
Court of Appeal, 30 April 1998. See also
Fenech v. East London & City Health Authority
[2000] Lloyd's Rep Med
35.
[48]
Poole J in
O'Driscoll v. Dudley
Health Authority
[1996] 7 Med LR 408.
[49]
Parry v. Clwyd Health Authority
[1997] PIQR 1, 10.
[50]
Per
O' Higgins J in
Gallagher
v. Minister for Defence
High Court, [1998] 4 IR 457, citing Lord Donaldson
in
Halford v. Brookes
[1991] 1 WLR 428, 433.
[51]
Limitation Defences in Civil
Proceedings
(No. 6, 1988) at 72.
[52]
Consultation Paper on Limitation of
Actions
(No.51, 1998).
[53]
Ibid.
at 271.
[54]
S.3 provides for a limitation period of
2 years. However, in this Report we propose that the discoverability limitation
period be 3 years.
[55]
Alberta Law Reform Institute
Report
on Limitations
(No. 55, 1989) Chap. 4 at 33.
[56]
McMahon & Binchy,
Irish Law of
Torts
(3rd ed., Butterworths, 1990) at paras.7.05-7.06.
[57]
McMahon & Binchy,
Irish Law of
Torts
(3rd ed., Butterworths, 1990) at paras.7.05-7.06.
[58]
See paras.2.39-2.54.
[59]
In the law of negligence it is the
defendant's conduct which is being judged by reference to the standard of the
"reasonable person".
[60]
Vaughan v. Menlove
(1837) 3 Bing
NC 468. See also Salmond and Heuston,
The Law of Torts
(20th
ed.) at 226.
[61]
McMahon & Binchy,
Irish Law of
Torts
(3rd ed., Butterworths, 1990) at paras7.05-7.06.
[62]
See para. 2.29.
[63]
See for a thorough discussion Warren
Seavey, "Negligence - Subjective or Objective
?
" (1927) 41 Harv LR 1. See
also James, "The Qualities of the Reasonable Man in Negligence Cases" (1951) 16
M LR.
[64]
[1974] IR 75, 89 [his emphasis].
[65]
Ibid
.
[66]
Warren Seavey, "Negligence - Subjective
or Objective
?
" (1927) 41 Harv LR 1, 11.
[67]
The 1980 Act, s. 14A(7), provides for an
objective test based on the reasonable person.
[68]
[1996] 1 EGLR 133.
[69]
Coban v. Allen
[1996] TLR 566.
[70]
Once this provision applies to the right
of action for breach of duty in tort, contract, statute or independent
provision, "it equally applies to any co-extensive right in relation to the
constitution". See the judgement of Keane J in
McDonnell v. Minister for
Communications and An Post
Supreme Court, 23 July 1997.
[71]
Dobbie v. Medway Health Authority
[1994] 1 WLR 1234.
[72]
Alberta Law Reform Institute,
Report
For Discussion on Limitations
(No.4, 1986) at para. 2.180. See also the
section headed, "Separate Incidents of Damage" in Chap. 5 of this Report at
paras. 5.01-5.10.
[73]
See paras.2.05-2.14.
[74]
See para. 2.29.
[75]
See para. 2.46.
[76]
Report on Limitations
(No.55,
1989) at 33.
[77]
A situation can be easily envisaged in
construction industry cases where the projects are of a technical nature so
that it may take some time before it is clear to whom the act or omission is
attributable. It would be unfair to a claimant in such instances to start the
limitation period running before this date.
[78]
See para. 2.29.
[79]
LRC No. 61, 2000.
[80]
See the Introduction to this Report at
paras. 8-10 and LRC No.14, 1999.
[81]
Ibid.
[82]
See Chap. 4
below
.
[83]
A proposed amendment which would have
introduced a long-stop of 20 years for latent defects was postponed until the
review of the entire Directive on which the Act is based.
[84]
Report on
The Statute of
Limitations: Claims in respect of Latent Personal Injury (No. 21, 1987); Report
on Defective Premises
(No. 3, 1982).
[85]
Consultation Paper on The Statutes of
Limitation: Claims in Contract and Tort in respect of Latent Damage (other than
Personal Injury) (Nov. 1999)at para. 4.41. See also the earlier discussion in
this Report in respect of the inherent differences between personal injury and
non-personal injury actions at paras. 2.11-2.14.
[86]
See paras. 2.11-2.14.
[87]
This factor could be offered as
justification for the fact that the Liability for Defective Products
legislation which came from the European Community, there are no ultimate
limitation periods on the Irish statute books. Those countries which favour the
use of long-stops do not necessarily have such a well-developed tradition in
regard to such an equitable jurisdiction.
[88]
See
O' Domhnaill v. Merrick
[1984] IR 151,
Toal v. Duignan
1991 ILRM 140. See also
Glynn v. The
Coombe
High Court, 6 April 2000, where O' Sullivan J reluctantly accepted
that the court has jurisdiction to dismiss an action brought within the
limitation period in the interests of justice.
[89]
See
Rules of the Superior Courts
,
Order 27 rule1, Order 36 rules12-13 and Order 122 rule 11.
[90]
[1996] 2 IR 459.
[91]
O' Hanlon J in
Celtic Ceramics Ltd v.
IDA
[1993] ILRM 248 said "it should not be forgotten that long delay before
issue of the writ will have the effect of any post-writ delay being looked at
critically by the court and more readily being regarded as inordinate and
inexcusable than would be the case if the action had been commenced soon after
the accrual of the cause of action. And that if the defendant has suffered
prejudice as a result of such delay before issue of the writ he will only have
to show something more than minimal additional prejudice as a result of the
post-writ delay to justify striking out the action. "This was also the approach
taken by the Supreme Court in
Kelly v. Cullen
Supreme Court, 27 July
1998. Here, Barron J giving the judgment for the court
,
stated "Delay
cannot really be inordinate if the proceedings are commenced within the
limitation period. Nevertheless, delay thereafter is more likely to be found to
be inordinate the less excuse there is for delay in commencing the proceedings.
Again, the longer it is since the cause of action arose, the less likely it is
that circumstances giving rise to delay will be regarded as excusable".
[92]
A 15 year long-stop was recommended by
the New Zealand Law Reform Commission in their
Discussion Paper on the
Limitations Act, 1950
at 48, and also by the Law Reform Commission of
Western Australia,
Report on Limitation and Notice of Actions
(Project
No. 36 Part II 1997) paras. 7.30 and 7.54.
[93]
Aachener Institut fur
Bauschadensforcshung und angewandte Bauphysik.
[94]
Moniteur des Travaux Publiques 19.06.87
at 60.
[95]
HomeBond is a scheme set up to provide
home owners with a warranty against major structural defects. HomeBond members
consist of builders and developers. Dwellings constructed by its members come
within the HomeBond scheme.
[96]
HomeBond 1997 rule 50(n) defines the
liability period as "a period of 10 years from the date of issue of the Final
Notice".
[97]
The English Law Commission in their
Consultation Paper on Limitation of Actions
(No. 151,1998), recommend a
long stop of 10 years. This is also the position in Alberta, see the
Limitations Act, 1996
cL-15.1, s3(1)(b), although the Alberta Law Reform
Institute recommended a 15 year long-stop in their
Limitations Report
(No.55 1989).
[98]
The Forum for the Construction Industry
has been given the task of implementing a recommendation from the Report,
"Strategic Review of the Construction Industry" (Pn.3839, Government
Publications) 1997 concerning the introduction of a national latent defects
insurance scheme.
[99]
Liability for Defective Products Act,
1991
s. 7(2)(a).
[100]
See fn. 95.
[101]
Deeds conveying an interest in land
must be sealed (see Wylie,
Irish Conveyancing Law
(2nd ed.,
Butterworths, 1996) at para. 18.122) and sealing is also still necessary in the
case of some company transactions. See
Aiken
v. Stewart Wrightson
Members Agency Ltd
[1995] 1 WLR 1281, affirmed in [1996] 2 Lloyd's Rep
117, for further discussion.
[102]
British Columbia Law Reform
Commission,
Report
on
Limitations
(No. 15, 1974) at
27-28.
[103]
Report on Limitation and Notice of
Actions
(Project No 36 Part II),1997 at para. 12.12.
[104]
English Law Commission,
Consultation Paper
on
Limitation of Actions
(No. 151,
1998) at para. 13.36.
[105]
See New Zealand Law Reform Commission
Report on Limitation Defences in Civil Proceedings
(No. 6, 1988) at
para. 169. See also chap. 6 where the problems associated with determining the
date of accrual are examined.
[106]
The Ontario Limitations Act
Consultation Group,
Group Recommendations for a New Limitations Act
:
Report of the Limitations Act Consultation Group
(1991) at 22.
[107]
The definition of a cause of action
for the purposes of the
res judicata
doctrine and statutes of limitation
does not differ.
[108]
Read v. Brown
(1888) 22 QBD 128, 131.
[109]
See Stapleton, "Gist of
Negligence
"
(1988) 104 LQR 213.
[110]
The limitation period will run from
the commission of the wrong. Examples are trespass and assault.
[111]
The elements of a cause of action in
negligence are: the negligent act, the breach of duty and reasonably
foreseeable damage.
[112]
Higgins v. Arfon Borough
Council
[1975] 2 All ER 589 illustrates this point. The Irish courts in
Morgan v. Park Developments
[1983] ILRM 156 and
Hegarty v.
O'Loughran
[1990] 1 IR 148 implicitly acknowledge this rule.
[113]
(1886) 11 App Cas 127.
[114]
Although this is not by any means
universally accepted. An example of this first exception is where there is
economic loss and loss due to physical damage both arising from the same
negligent act.
[115]
McGregor on
Damages,
The Common Law Library Series No. 9, (15th ed., Sweet & Maxwell,
1988) at para. 378.
[116]
(1886) 11 App Cas 127.
[117]
(1989) 91 ALR 314, 318-319.
[118]
[1979] 2 NZLR 234, see also
per
Cooke J
Bowen v. Paramount Builders Ltd
[1977] 1 NZLR 394,
424.
[119]
See
Sutherland SC v. Heyman
(1984-5) 157 CLR 424, 490-2
per
Brennan J.
[120]
Horbury v. Craig Hall &
Rultey
(1991) 7 PN 206,
Hamlin v Edwin Evans
(1997) 29 HLR 414.
[121]
Berry v. Stone Manganese Marine
Ltd
[1972] 1 Lloyds Rep 182.
[122]
Which implemented one of the Law
Reform Committee's recommendations in the limitations fields. See the Law
Reform Committee,
Final Report on Limitation of Actions
(Cmnd 6923,
1977).
[123]
Hamlin v Edwin Evans
(1997) 29
HLR 414 (affirmed
Horbury v. Craig Hall & Rultey
(1991) 7 PN 206,
QBD and overruled
Felton v. Gaskill Osborne
& Co. [1993] 2 ELGR 176
where it was held that "knowledge" in s. 14 A of the
Limitation Act,
1980 related to the particular head of damage and not to damage in the general
sense), per Brennan J in
Sutherland SC v. Heyman
(1984-5) 157 CLR 424,
490-2.
[124]
Horbury v. Craig Hall &
Rultey
(1991) 7 PN 206.
[125]
See paras. 5.07-5.10.
[126]
Dutton v. Bognor Regis UDC
[1972] 1 QB 373;
Anns v. Merton London Borough Council
[1978] AC 728;
Colgan v. Connolly Construction Co (Ireland) Ltd
[1980] ILRM 33;
Ward
v. McMaster
[1985] IR 29.
[127]
This exclusionary rule was enunciated
in
Cattle v. Stockton Waterworks Co
(1875) 10 QB 453, 457- 458, and
followed in
Simpson v. Thomson
(1877) 3 App Cas 279, 290, and
Leigh
& Sullivan Ltd
.
v. Aliakmon Shipping Co Ltd
[1986] AC 785. It
was applied more particularly to cases of builders' negligence in
Sparham-Souter v. Town and Country Developments (Essex) Ltd
. [1976] 1 QB
858, 868 and
Perry v. Tendrig District Council
[1983] 1 EGLR 260.
[128]
[1976] 1 QB 858, 868. The rule was
confirmed by Lord Wilberforce in
Anns v. Merton London Borough Council
[1978] AC 728, 758, who was of the view that it would reduce the possibility of
an endless and indeterminate class of potential plaintiffs.
[129]
[1983] 1 EGLR 260.
[130]
Ibid.
[131]
In a subsequent case,
Polk &
Co v. Edwin Hill
[1988] 1 EGLR 142
Judge Lewis examined the
arguments in
Perry v. Tendring
[1983] 1 EGLR 260
and also the
decision in
Donoghoe v. Stevenson
[1932] AC 562 and
Anns v.
Merton
London Borough Council
[1978] AC 728, before applying the
rule in that case.
[132]
Fleming,
The Law of Torts
,
(9th ed., LBC Information Services, 1998) at 199-200. Fleming
points out that the Australian High Court distanced itself from any broad
exclusionary rule in
Caltex Oil v. The Willemstad
[1976] CLR 529 and
the Supreme Court of Canada also disclaimed the exclusionary rule in
Canadian National Rly v.
Norsk Pacific Steamship Co
[1992] 1 SCR
1021.
[133]
[1980] ILRM 33.
[134]
[1985] IR 29. In this case the
builder lived in the house himself from 1974 to 1980 before selling it to the
plaintiff.
[135]
Ibid.
[136]
McMahon & Binchy,
Irish Law of
Torts
(2nd ed., Butterworths, 1990)
at 253
.
[137]
D&F Estates v. Church
Commissioners for England
[1989] 1 AC 177;
Murphy v. Brentwood
[1991] 1 AC 398.
[138]
Pirelli General Cable Works Ltd
v. Oscar Faber and Partners
[1983] 2 AC 1,18 per Lord Fraser of
Tullybelton.
[139]
See Chap.4.
[140]
We return to deal with these
conflicting interests at paras.535-5.36.
[141]
Assignment of claims for latent
defects is not without problems either. See Robertson, "Defective Premises and
Subsequent Purchasers" (1983) 99 LQR at 562-563.
[142]
Consultation Paper on The Statutes
of Limitation: Claims In Contract and Tort In Respect of Latent Damage (Other
Than Personal Injury)
(1999) at para. 4.97.
[143]
See
Hedley Byrne
[1964] AC 465
and a case in point
Smith v. Bush
[1990] 1 AC 831. The House of Lords
decision
Smith v. Bush
[1990] 1 AC 831, has been interpreted by the
courts as setting out three conditions which must be met before a duty of care
can be established between a surveyor engaged by the building society and the
mortgagor. There must be (i) sufficient proximity between the task of the
surveyor and the affairs of the mortgagor, (ii) it must be foreseeable that
the mortgagor is likely to suffer damage if the surveyor is negligent, and
(iii) possibly it must be just and reasonable to impose liability (see
Beaumont v. Humberts
[1990] 49 EG 46). Costello J in
Ward v.
McMaster
[1985] IR 29, 54
, Part III of his judgment, 'assumed' that
the auctioneers, instructed by the County Council to value the house, owed a
duty of care to the purchaser. This assumption was not criticised by the
subsequent Supreme Court decision.
[144]
According to the House of Lords in
Smith v. Bush
[1990] 1 AC 831, the disclaimer is ineffective, unless it
satisfies the reasonableness requirement in the
Unfair Contract Terms Act,
1977
. There is, however, no such Act or requirement in Irish law. The
Sale of Goods and Supply of Services Act, 1893,
s. 55(4), which prevents
a party relying on an exclusion clause, applies to contractual liability not
tortious liability. See
Kennedy v. AIB plc and AIB Finance Ltd
Supreme
Court, 29 October 1996 and paras. 6.49-6. 51.
[145]
Ann Minogue and Siobhan McCloskey
"Latent defects insurance: a viable alternative?'
Solicitors Journal
19
June 1992.
[146]
See para. 5.16.
[147]
Alberta Law Reform Institute,
Report on Limitations
(No 55, 1989) at 67.
[148]
Report on Recommendations for a
New Limitations Act, (1991)
Recommendation 7, at 26; Ontario (General) Bill
1992 cl 11 (1).
[149]
New Zealand Law Commission
Report
on
Limitation Defences in Civil Proceedings
, (NZLCR6 1988) paras.
216-225. The New Zealand Law Commission do not recommend include a separate
provision for subsequent purchasers in their Report.
[150]
English Law Commission,
Consultation Paper on Limitation of Action
s (No 151, 1998).
[151]
Report on Limitation and Notice Of
Actions
(Project No. 36- Part II 1997) paras. 8.30- 8.31.
[152]
See Spry,
Equitable Remedies
(4th ed., Sweet & Maxwell, 1990) at 407.
[153]
Snell's
Principles of Equity
(27th ed.) at 35.
[154]
Except to the extent that the statute
can be applied by analogy. Spry,
Equitable Remedies
(4th ed.)
at409.
[155]
[1942] AC 154,174.
[156]
See Taylor,
A Treatise on the Law
of Evidence
(12th ed.) at para. 365.
[157]
See
Phibson on Evidence
(15th ed., Sweet & Maxwell, 2000).
[158]
Peter Murphy,
A Practical Approach
to Evidence
( 3rd ed., Blackstone Press ltd.,1980) at 78.
[159]
[1962] 1 QB 189.
[160]
Our emphasis. In cases where the
defendant pleads the Statute of Limitations in his defence, the plaintiff can
put this defence in issue by delivering a reply. However, should the
plaintiff not deliver a reply within the requisite period, the defence is
deemed to be denied by the plaintiff and put in issue. There is an implied
joinder of issue. See: Rules of the Superior Courts: Order 19 rule 18; Order
23 rule 1; Order 27 rule 14 (Ireland); The Supreme Court Practice Order 18
rule 14 (England).
[161]
At 208.
[162]
Ibid
. at 202.
[163]
[1963] AC 758,784. For a different
approach to the burden of proof question see the Australian case,
Pullen v.
Gutteridge Hoskins & Davy
[1993] 1 VR 27. Here it was held that the
burden of proof is on the defendant, on the basis that, it is not part of the
cause of action for negligence that the claim is not statute-barred.
[164]
See also
Perry v. Tendring
(1985) 3 ConLR 74;
Congregational Union v. Harriss & Harriss
(1985)
ConLR 96.
[165]
[1988] 1 All ER 15.
[166]
See para. 5.39.
[167]
In limitation cases even where the
plaintiff does not deliver a reply to a limitations defence, there is an
implied joinder of issue. See the Rules of the Superior Courts: Order 19 rule
18; Order 23 rule 1; Order 27 rule 14
[168]
See chap.7.
[169]
Everitt v. Thorsman Ireland
Ltd
High Court, 23June 1999 Kearns J at 12.
[170]
[1982] IR 467, 474.
[171]
Ibid
. at 474.
[172]
For a full discussion on this point
see the
Consultation Paper on The Law of Limitation of Actions Arising From
Non-Sexual Physical Abuse of Children
(No.16, 2000) at 49 and also fn.148.
[173]
[1992] 1 IR 223.
[174]
[1966] IR 567.
[175]
(No. 16-2000) at 81-88.
[176]
(No.21-1987) at 53.
[177]
Below
at
para. 4.21.
[178]
Read v. Brown
(1888) 22 QBD 128, 131.
[179]
This is because defective products
are regulated by the
Liability for Defective Products Act, 1991.
[180]
Gibbs v. Guild
(1882 ) 9 QBD 59.
[181]
Re Henry
[1894 ] 3 Ch 290.
[182]
Waters v. Earl of Thanet
(1842) 2 QB 757.
[183]
[1983] ILRM 156.
[184]
[1990] 2 QB 495.
[185]
Ibid
. at 499.
[186]
[1979] Ch 384.
[187]
[1990] 2 QB 495.
[188]
(1885) 2 TLR 157
.
[189]
McGee,
Limitation Periods
(2nd ed., 1994) at 80, states that `
functus officio
' is not a
useful distinguishing factor, as the argument in
Bell v. Peter Browne &
Co
is not that the plaintiff's solicitors had a general continuing duty to
him, but that they had been under a duty to complete the task for which they
had originally been engaged.
[190]
24
Halsbury's Law of England
,
(4th ed., Reissue ) at para. 865. The following authorities are
cited:
Bell v. Peter Browne & Co.
[1990] 2 QB 495;
Forster v.
Outred
& Co [1982] 1 WLR 86;
Moore &Co Ltd v. Ferrier
[1988]
1 WLR 267, 400;
Midland Bank Trust Co Ltd v. Hett, Stubbs & Kemp
[1979] Ch 384.
[191]
It is distinguishable from a
recurring obligation, for example, an obligation under a contract to make
periodic payments, where each breach is a separate breach of the recurring
obligation.
[192]
[1958] 1 WLR 16.
[193]
Ibid
. at 27.
[194]
Ibid
. at 26.
[195]
See
Chitty on Contracts General
Principles
(27th ed., 1994) at para. 28.002.
[196]
Mullany, "Reform of the Law of Latent
Damage" (1991) 54 MLR 349 at 354.
[197]
As defined at para. 6.44.
[198]
Torts causing personal injuries are
governed by the
Statute of Limitations (Amendment) Act, 1991
which is
discussed at paras.2.01-2.10.
[199]
"Negligence alone does not give a
cause of action, damage alone does not give a cause of action: the two must
co-exist."
Per
Reading CJ in
JR Mundy v. London County Council
[1916] 2 KB 331 at 334.
[200]
Fleming,
The Law of Torts
,
(9th ed., LBC Information Services) at 22.
[201]
However that is not to say that
latent damage cannot occur in torts actionable
per se
. In
Larche v.
Middleton
Supreme Court, 28 July 1989, there was leakage of defamatory
material, of which the plaintiff was unaware until it affected him through the
refusal of a job. Although defamation is a tort actionable
per se
, the
Supreme Court of Ontario said they could see no principled reason to
distinguish an action for defamation from a negligence action for the purposes
of applying the discoverability test which subsists in that jurisdiction.
Presumably toxic torts could be framed in an action for trespass or nuisance in
this jurisdiction. See Christopher McAuliffe, "Ressurrecting an Old Cause of
Action for a New Wrong: Battery as a Toxic Tort" (1993) 20
Boston College
Environmental Affairs L. Rev
. 265.
[202]
Read v. Brown
[1888] 22 QB 128,
131.
[203]
B Feldthusen,
Economic
Negligence
,
The Recovery of Pure Economic Loss
(2nd ed.,
Carswell Legal Publications 1989).
[204]
[1932] AC 562.
[205]
[1964] AC 465.
[206]
[1983] AC 520.
[207]
[1985] IR 29.
[208]
London Congregational Union
Incorporated v. Harriss & Harriss
[1988] 1 All ER 335.
[209]
[1984] NI 1.
[210]
[1982] 1 WLR 86.
[211]
S.W. Hewett, "Professional
Negligence: Latent Economic Damage and Limitation" (1984) 81
Law Society's
Gazette
3333.
[212]
(1982) 126 SJ 593.
[213]
Melton v. Walker & Stanger
(1981) 125 SJ 861 and
Costa v. Georghiou
[1985] 1 PN 201.
[214]
(1984) QBD 713.
[215]
Ibid
. at 234.
[216]
Ibid
. at 235.
[217]
High Court,10 April 1991. A
subsequent challenge to the constitutionality of the Act was unsuccessful in
Tuohy v Courtney
(No. 2) [1994] 2 ILRM 503.
[218]
As already stated, in law a physical
defect such as may exist in the foundations of a building is distinct from the
actual physical damage which it later causes to the building.
[219]
[1983] 2 AC 1.
[220]
Ibid.
[221]
Ibid.
While subsequent English
cases have limited
Pirelli
to the factual scenario with which it was
concerned, that is where there is an
inter partes
professional
relationship or a special relationship amounting to reliance, the decision on
the limitation point still stands. See
Nitrigin Eireann Teoranta v. Inco
Alloys Ltd
[1992] 1 All ER 854;
28 Halbury's Laws of England
(4th ed. Reissue) para 821. More importantly the
Latent Damage
Act
,
1986
has altered the picture considerably. This is discussed
below
, at para.1.09. In terms of Irish law however,
Pirelli
was
applied by the Supreme Court in
Hegarty v. O' Loughran
[1990] 1 IR 148,
when there was no distinction in the treatment of personal injuries and
non-personal damage, and is therefore still relevant.
[222]
Ibid
. at 18.
[223]
[1983] 1 WLR 1436, 1445.
[224]
[1988] 1 WLR 267.
[225]
[1988] 1 All ER 15.
[226]
Junior Books
allowed recovery
for pure economic loss resulting from a non-dangerous defect; the cost of
repairing a defective floor negligently installed by the defendant
subcontractor.
[227]
Murphy v. Brentwood District
Council
[1991] 1 AC 398. In
Junior Books
every judge with one
dissentient held that pure economic loss was recoverable, and quoted other
House of Lords decisions to that effect. However despite this, in subsequent
cases it has frequently been distinguished on its facts.
[228]
Ketteman v. Hansel Properties
Ltd
[1987] 2 WLR 312.
[229]
Dove v. Banhams Patent Locks
[1983] 2 All ER 833 .
[230]
[1999] 2 ILRM 289.
[231]
See paras. 6.33-6.36.
[232]
Kaliszewska v. John Clague &
Partners
[1984] "
Construction
Law Report"
62.
[233]
[1983] 2 AC 1.
[234]
Ibid
.
[235]
Kensington and Chelsea and
Westminster Health Authority v. Wettern Composites
[1985]1 All ER 346,
concerned defective roofing which was liable to blow away at any time.
[236]
Dove v. Banhams Patent
Locks
[1983] 2 All ER 833, concerned negligent installation of a security gate by a
security firm.
[237]
Ketteman v. Hansel Properties
Ltd
[1987] 2 WLR 312.
[238]
Kaliszewska v. John Clague &
Partners
[1984] Con LR 62.
[239]
Merkin,
Richards Butler on Latent
Damage
(1987) at 43.
[240]
[1962] 1 QB 189, 207.
[241]
Page v. United States of
America
(1984) 729F.2d 818. The "continuing tort doctrine" was also applied
in the English case of
Clarkson v. Modern Foundries Ltd
[1957] 1WLR
1210.
[242]
Page v. United States of
America
(1984) 729F.2d 818, 821-22. It has been applied in cases involving
negligent treatment of a patient by a doctor, protracted sexual battery and
intentional infliction of emotional distress, alienation of affection involving
a series of wrongful acts over a period of time, continuous exposure to gradual
injury-causing conditions during an employment relationship and in nuisance
cases based on gradual contamination.
[243]
Report on Defective Premises
(No. 3, 1982) at 17, s.5 of the draft bill.
[244]
See para 6.16.
[245]
See paras. 4.16-4.17. Deeds conveying
an interest in land must be sealed (see Wylie,
Irish Conveyancing Law
(2nd ed.,Butterworths,1996) at para. 18.122) and sealing is also
still necessary in the case of some company transactions. See
Aiken
v. Stewart Wrightson Members Agency Ltd
[1995] 1 WLR 1281 affirmed in
[1996] 2 Lloyd's Rep 117, for further discussion.
[246]
This definition of construction
operations is taken from the
Housing Grants, Construction and Regeneration
Act, 1996.
[247]
Groom v. Cocker
[1939] 1 KB
194. In earlier authorities like
Turner v. Stallibrass
[1898] 1 QB 56
and
Jarvis v. Vandervell & Co
[1936] 1 KB 399, only if it was not
necessary to rely on a contract could an action be brought in tort.
[248]
(1826) 5 B&C 259.
[249]
[1964] AC 465.
Hedley Byrne
was described by Oliver J in the
Midland Bank
case as establishing "a
general duty arising by law from a relationship of the type therein described
however that relationship is created. It is therefore inconsistent with
Groom v. Crocker
...".
[250]
[1983] 1 AC 520.
[251]
See also
Tulsk Co-Operative
Livestock Market v. Ulster Bank Limited
High Court, 13 May 1983 and
Ward v. McMaster
[1985] IR 32.
[252]
[1979] Ch 496. Oliver J affirmed
Lord Denning's decision in
Esso Petroleum Co Ltd v. Mardon
[1976] QB 801
which cited
Boorman v. Brown
(1844) 11 CL Fin 1 as authority
for allowing concurrent liability in tort and contract.
[253]
In situations where the contract
excludes an action in tort, then there is no concurrent action in tort. It is
possible to contract out of a tortious duty.
[254]
[1986] AC 80.
[255]
Ibid.
[256]
(1996) 77 BLR 51.
[257]
[1995] 2 AC 145.
[258]
[1970] IR 249.
[259]
Griffin J stated that: "In my opinion
it is both reasonable and fair that, if the issues of fact are such that he
would be entitled to succeed either in contract or in tort, the plaintiff
should be entitled to pursue either or both remedies; there can be nothing
wrong in permitting the plaintiff, who is the injured party, to elect or choose
the remedy which to him appears to be that which will be most suitable and
likely to attract the more favourable result."
[260]
Supreme Court, 29 October 1996.
[261]
[1995] 2 AC 145.
[262]
Law Commission of British
Columbia
, Report on the Ultimate Limitation Period: Limitation Act, Section
8
(No.112, 1990) at 34-35.
[263]
N.H. Andrews, "Reform of Limitations
of Actions : The Quest for Sound Policy" (1998) 57 CLJ 589 at 607.
[264]
S. 48(1) 1957 Act.
[265]
See also
Consultation Paper
on
The Statutes of Limitation: Claims in Contract and Tort in Respect
of Latent Damage (other than Personal Injury
) (1998) at para. 4.24. There
is no statutory definition. In
Rohan v. Bord na Mona
[1990] 2 IR 425,
Barron J applied the test of "ability to manage his own affairs". Lord Denning
in
Kirby v. Leather
[1965] QB 367 interpreted "unsoundness of mind" in
the
Limitation of Action Act,
1939 as when a person is "[b]y reason of
mental illness, incapable of managing his affairs in relation to the accident
as a reasonable man would do" Also along these lines the Alberta Institute in
its
Report on Limitations
(No. 55, 1989) at 41 have defined disability
specifically in terms of the claim- "unable to make reasonable judgments in
terms of the claim". By connecting the incapacity to the terms of the claim,
there is a recognition that a person can be competent for one purpose, but not
for another.
[266]
Before the
Forfeiture Act, 1870,
was repealed,
s.8 prevented persons convicted of treason or felony
and sentenced to death or penal servitude from bringing any action at law or
suit in equity.
[267]
See the Third Schedule to the
Criminal Law Act
,
1997.
[268]
Law Reform Commission,
Consultation Paper on The Statutes of Limitation: Claims in Tort and
Contract in respect of Latent Damage
(1998) at para. 4.75.
[269]
New South Wales Law Reform
Commission,
Third Report on the Limitation of Actions- Special
Protections
(No. 3, 1967) paras. 88-89, Western Australia Law Reform
Commission
, Limitation and Notice of Actions
(Project No. 36 Part II,
1997). See also Ontario Law Reform Commission,
Report on Limitation of
Actions
(1969) at 99; Law Reform Commission of British Columbia,
Report
on Limitations
: Part II (LRC 15, 1974) at 66.
[270]
Limitation and Notice of Actions
(Project No. 36 Part II, 1997) at paras. 17.13-17.18.
[271]
These include
Australian Capital
Territory, Act
1985 s.8(3),
Ontario Limitations Bill
1992
, c.
9(2), New Zealand Law Commission ,
Limitation on Defences in Civil
Proc
eedings (No.6,1988) at para. 258.
[272]
See British Columbia
Limitation
Act,
1979
s.7(5)(a)(ii); Manitoba
Limitation of Actions Act
,
1987 s. 7(1)(b);
Northern Territory Limitation Act, 1981
s. 4(1);
Ontario Law Reform Commission
, Report on Limitation of Actions
(1969) at
99; Newfoundland Law Reform Commission,
Report on Limitation of Actions
(R1,1986)
[273]
S. 49(1)(a) apart, there is a
possibility that under the proposed discoverability test itself, time will not
start to run until the disability ceases. This would occur where the
reasonable man suffering from the same incapacity would not discover the damage
until such a time. However as this may only rarely be the case, it will almost
always be s.49(1)(a) which will be relied on by those under a legal incapacity.
This difficulty is further compounded by the fact that the discoverability test
assumes that the person to whom the latent damage becomes discoverable is
capable of managing his own affairs.
[274]
Statute of Limitations Act
,
1957
, s.48(1)(b).
[275]
Barron J in
Rohan v. Bord na
Mona
[1990] 1 IR 425, 430 stated "The purpose of the provision is to save a
cause of action for someone to whom it has accrued but because of a disability
may be unable to pursue it. If so, it is immaterial whether the plaintiff was
at the date of the accident of unsound mind or immediately as a result thereof
became of unsound mind. Whether or not this is what the Oireachtas intended is
not in any event to be decided by presumption. The intention must be determined
from the words used. Taking the words 'on the date' in their normal meaning,
this means at any time on such date. I see no reason for any other
construction."
[276]
In the case of a supervening
incapacity it will be necessary to prove that the incapacity occurred before
the expiry of the limitation period, as opposed to the present situation, where
it is necessary to show that the incapacity existed before the commencement of
the limitation period.
[277]
Alberta
Limitations Act,
1996
s.5(1); Newfoundland
Limitations Act
,
1995
s.5(3);
South Australia
Limitation of Actions Act,
1936
s 45(1); Northern
Territory
Limitation Act,
1981
s.36(1); Manitoba
Limitation of
Actions Act,
1987
s.7(2); British Columbia
Limitation Act,
1979
s. 7(3).
[278]
English Law Commission,
Consultation Paper on Limitation of Actions
(No. 151, 1997) at para.
12.128.
[279]
Such a provision was recommended by
the Ontario Law Reform Commission
Report on Limitation
of Actions
(No. 97, 1969) and the Newfoundland Law Reform Commission,
Report on
Limitation of Actions
(1986) and the Law Reform Commission of Western
Australia,
Report on Limitation and Notice of Actions
(No. 36, Part II
1997).
[280]
Law Reform Commission of British
Columbia,
Report on the Ultimate Limitation Period: Limitation
Act
,
Section 8
(1990) at 36-42.
[281]
Newfoundland Law Reform Commission,
Working Paper on Limitation Actions
(WP1 1985) at 323.
[282]
New Zealand Law Commission,
Report on Limitation Defences in Civil Proceedings
(NZLC No.6 1988) at
para. 307.
[283]
English Law Commission,
Consultation Paper on Limitation of Actions
(No. 151,1997).
[284]
See chap. 4. para.4.11. In
O
Domhnaill v. Merrick
[1984] IR 151. In 1961 the plaintiff suffered severe
personal injuries in a motor car accident when she was three years old. The
action was commenced in 1977, however the statement of claim was not delivered
until 1982. Although the action was commenced within the limitation period, it
was dismissed because of the inordinate and inexcusable delay in delivering the
statement of claim.
[285]
Parents are automatically the legal
guardians of their minor children. Testamentary guardians can be appointed by
both parents so that a minor will have a replacement guardian after the death
of a parent. In circumstances where a minor has no guardian, the court on the
application of any person or persons may appoint a legal guardian.
[286]
S.10 (2)(g).
[287]
For example: the Tasmanian
Limitation Act,
1974
applies this rule to minors; and the
Saskatchewan
Limitation of Actions Act,
1878 as amended applies the
provision to persons suffering from a mental disorder; and the Alberta
Limitations Act,
1996
applies the rule to minors though prior to
the 1996 Act, the rule also applied to adults where a plenary or partial
guardian with the capacity to commence legal actions had been appointed under
the
Dependent Adults Act, 1980
. Both the Western Australian Law
Commission and the Newfoundland Law Reform Commission recommend the adoption
of a similar provision in relation to minority and adult incapacity:
Report
on Limitation and Notice of Actions
(Project No. 36 Part II, 1997) para.
17.64; and Newfoundland
Report on Limitation of Actions
(NLRC R1
1986).
[288]
[1972] IR 144.
[289]
[1977] IR 55.
[290]
New South Wales, the Australian
Capital Territory, Tasmania, the Northern Territory, British Columbia, and
Manitoba.
[291]
Ontario.
[292]
See ss. 71(2) and 72(2).
[293]
Per
Somervell LJ in
Beaman
v. ARTS
Ltd
. [1949] 1 KB 550.
[294]
Phillips-Higgins v. Harper
[1954] 1 QB 411. Brady and Kerr,
The Limitation of Actions
(2nd ed., 1994) at 198 refer to the possibility that s.72 of the
Statute of Limitations, 1957
could be interpreted generously so as to
allow postponement of the limitation period in any circumstances where law or
equity would grant relief from mistake.
[295]
Peco Arts Inc v. Hazlitt Gallery
Ltd
[1983] 1 WLR 1315.
[296]
Kleinwort Ltd v. Lincoln
Council
[1998] 4 All ER 513. In this case it was held that there was no
principle of English law that payments made under a settled understanding of
the law which was subsequently departed from by judicial decision were not
recoverable in restitution on the ground of mistake of law. And it was also
held that s.32(1) of the 1980 Act applies to mistakes of fact and law.
[297]
(No.61, 2000) at para. 26.
[298]
[1983] ILRM 156.
[299]
[1996] 1 AC 102.
[300]
S.32 refers to "any fact relevant to
the plaintiff's right of action has been deliberately concealed from him by the
defendant".
[301]
[1977] 1 Ch 106, 245.
[302]
Limitation Act,
1939
,
s. 26.
[303]
[1996] 1 AC 102, 152.
[304]
Ibid
. at 154.
[305]
[1996] 1 AC 102.
[306]
New Zealand Law Commission,
Limitation Defences in Civil Proceedings
, NZLC-R6 (No. 6, 1988) at para.
303,306.
[307]
Law Reform Commission of British
Columbia,
Report on the Ultimate Limitation Period: Limitation Act, s.8
(1990) chap.4 at 43-44.
[308]
Some Law Reform Commissions suspend
the long-stop for actions of fraudulent concealment but not for actions based
on fraud: the Alberta Law Reform Institute,
Report on Limitations
(No.
55 1989) at 40; and the Ontario Limitations Act Consultation Group, see
s.15(7)(b) of the Ontario
Limitations (Bill), 1992
. The main reason for
such a distinction is that unlike fraud, fraudulent concealment effectively
makes the date of discoverability later. Consequently if the fraud is well
concealed there is an increased possibility that the long-stop limitation
period will have expired.
[309]
McMahon and Binchy,
Irish Law of
Torts
(23rd ed., 2000) at paras.35.01-35.02
[310]
Beaman v. ARTS Ltd
[1948] 2
All ER 89, 94
per
Lord Denning.
[311]
See
Kitchen v. Royal Air Force
Association
[1958] 1 WLR 563.
[312]
Limitation Act
,
1939
s.
26(b).
[313]
[1958] 1 WLR 563.
[314]
Ibid
. at 572-573.
[315]
[1973] 1 WLR 29.
[316]
Ibid.
at 569.
[317]
[1991] ILRM 764.
[318]
[1983] ILRM 156.
[319]
Brady and Kerr,
The Limitation of
Actions
, ( 2nd ed., The Law Society, 1994) at 190-191.
[320]
William Hill Organisation Ltd v.
Bernard Sunley & Sons Ltd
(1983) 22 Build LR 1.
[321]
Orr Committee Report (1977) paras.
2.23-2.24.
[322]
Limitation Act
, 1985 ss.
33-34.
[323]
The damages which can be claimed on
behalf of the estate exclude exemplary damages, or damages for any pain and
suffering or personal injury or for loss or diminution of expectation of life
or happiness.
[324]
Just as in the case of subsequent
purchasers the knowledge of the predecessor owner is imputed to the successor
owner. See Chap.6.
[325]
Law Reform Commission
, Report on
The Statute of Limitations: Claims in Respect of Latent Personal Injuries
(No. 21, 1987) at 50.
[326]
Both the Alberta Law Reform Institute
in its
Report on Limitations
(No. 55, 1989) at 63 and the Western
Australia Law Reform Commission in its Report on
Limitations and Notice of
Actions
(No. 36 Part II, 1997) at para. 22.24 aim to give either the
deceased or the personal representative a full discovery period. In cases
where the limitation period has not expired before the death of the deceased,
the full limitation period will not start to run against the personal
representative until the cause of action becomes discoverable by him, but in
cases where he had knowledge of it before his appointment time will run from
the date of his appointment.
[327]
In limitation cases even where the
plaintiff does not deliver a reply to a limitations defence, there is an
implied joinder of issue. See the Rules of the Superior Courts: Order 19 rule
18; Order 23 rule 1; Order 27 rule 14.
[328]
See definition at para.6.44.