The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 No. 1666


BAILII is celebrating 24 years of free online access to the law! Would you consider making a contribution?

No donation is too small. If every visitor before 31 December gives just £5, it will have a significant impact on BAILII's ability to continue providing free access to the law.
Thank you very much for your support!



BAILII [Home] [Databases] [World Law] [Multidatabase Search] [Help] [Feedback]

United Kingdom Statutory Instruments


You are here: BAILII >> Databases >> United Kingdom Statutory Instruments >> The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 No. 1666
URL: http://www.bailii.org/uk/legis/num_reg/2015/uksi_20151666_en_1.html

[New search] [Printable PDF version] [Help]


Statutory Instruments

2015 No. 1666

Infrastructure Planning

The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015

Made

9th September 2015

Coming into force

10th September 2015

An application has been made, under paragraph 2 of Schedule 6 to the Planning Act 2008(1), to the Secretary of State in accordance with the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011(2) for a non-material change to the Hinkley Point C (Nuclear Generating Station) Order 2013(3).

The Secretary of State, having considered the application, and having consulted in accordance with regulation 7(1) of the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011, has decided to make this Order amending the Hinkley Point C (Nuclear Generating Station) Order 2013.

The Secretary of State, in exercise of the powers conferred by paragraph 2 of Schedule 6 to the Planning Act 2008, makes the following Order:

Citation and commencement

1.  This Order may be cited as the Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 and comes into force on 10th September 2015.

Amendment of the Hinkley Point C (Nuclear Generating Station) Order 2013

2.  The Hinkley Point C (Nuclear Generating Station) Order 2013 ("the Order") is amended as follows.

Amendment to Part 1 (Authorised development) of Schedule 1 (Authorised project)

3.-(1) The description of Work No. 1A in Part 1 (Authorised development) of Schedule 1 (Authorised project) to the Order is amended as follows.

(2) In paragraph (d)(i)-

(a)after "Effluent Tanks;" omit "and"; and

(b)at the end of the list, below "Emergency Diesel Generator Buildings;", insert-

"Battery Load Bank;

Cooling Water Discharge Weir (Buildings); and

Refuelling Water Storage Tank;".

(3) In paragraph (d)(ii)-

(a)after "Auxiliary Transformer;" insert "and";

(b)for "Hydrazine and Ammonia Storage; and" substitute "Hydrazine Storage;"; and

(c)omit "Auxiliary Feedwater Storage;".

(4) In paragraph (d)(iii)-

(a)after "Fire-Fighting Water Building;" insert "and"; and

(b)at the end of the list, below "Fire-Fighting Water Building; and", insert "Discharge Shaft (Units 1 & 2);".

(5) In paragraph (e)(i), at the end of the list, below "Emergency Diesel Generator Buildings;", insert-

"Battery Load Bank;

Cooling Water Discharge Weir (Buildings); and

Refuelling Water Storage Tank".

(6) In paragraph (e)(ii)-

(a)after "Unit Transformer;" insert "and"; and

(b)omit "Hydrazine and Ammonia Storage; and" and "Auxiliary Feedwater Storage;".

(7) In paragraph (f)-

(a)omit "Attenuation Pond;";

(b)after "Conventional Island Water Tanks;" omit "and";

(c)after "Nuclear Island Water Tank;" insert "and"; and

(d)at the end of the list, below "Nuclear Island Water Tank;", insert "Degassed Water Storage Tanks;".

(8) In paragraph (h)-

(a)omit "Medical Centre;";

(b)after "Contamination Tools Store" omit "(2 structures)"; and

(c)after "Vehicle search area building adjacent to the C182;" omit "and";

(d)in the list, between "Vehicle search area building adjacent to the C182;" and "Service Access Buildings;", insert "Emergency Response Store;";

(e)after "Service Access Buildings;" insert "and"; and

(f)at the end of the list, below "Service Access Buildings; and", insert "Services Ventilation Building;".

Amendment to Part 3 (Approved plans) of Schedule 1 (Authorised project)

4.-(1) Part 3 (Approved plans) of Schedule 1 (Authorised project) to the Order is amended as follows.

(2) For the approved plans referred to in paragraph (3), substitute the approved plans as set out in the Schedule to this Order.

(3) The approved plans referred to in paragraph (2) are each of those listed between the following headings in Part 3 (Approved plans) of Schedule 1 (Authorised project) to the Order-

(a)"HPC Permanent Development Site"; and

(b)"HPC Accommodation Site".

(4) The Schedule to this Order has effect.

Amendment to Schedule 2 (Requirements)

5.  Schedule 2 (Requirements) to the Order is amended as follows-

(a)in paragraph (2) of requirement PW3 (Buildings and structures) for "(Rev 01)" substitute "(Rev 02)";

(b)omit requirement MS18 (Auxillary Feedwater Storage Buildings);

(c)in paragraph (2) of requirement MS19 (Service Access Buildings) for "(Rev 01)" substitute "(Rev 02)"; and

(d)in paragraph (2) of requirement MS21 (Meteorological Station Mast) for "(Rev 01)" substitute "(Rev 02)".

Certification of revised or substituted plans

6.-(1) The undertaker must, as soon as practicable after the making of this Order, submit copies of any revised or substituted plans to the Secretary of State for certification that they are true copies of the revised or substituted plans.

(2) A plan so certified by the Secretary of State is admissible in any proceedings as evidence of the contents of the document of which it is a copy.

(3) In paragraph (1), the "undertaker" has the same meaning as in article 2(1) of the Order.

Signed on behalf of the Secretary of State for Energy and Climate Change

Giles Scott

Head of National Infrastructure Consents and Coal Liabilities

Department for Energy and Climate Change

9th September 2015

Article 4

SCHEDULEApproved plans to be substituted into Part 3 (Approved plans) of Schedule 1 (Authorised project) to the Order

"HPC Permanent Development Site
Site Plans
Drawing numberRevDrawing titleScalePaper size
HINK-A1-SL-00-GA-00202HPC Site Parameter Plan1:1000A0
HINK-A1-SL-00-GA-01002Site Layout Plan (Operational)1:2500A1
Nuclear Island (Unit 1)
Unit 1: Reactor Building / Fuel Building / Fuel Building Hall / Boron Storage / Safeguard Buildings / Nuclear Auxiliary Building / Access Tower / Service Access Building 2
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HR-01-GP-09002Roof Plan1:200A0
HINK-A2-HR-01-GE-00102South and West Elevations1:200A0
HINK-A2-HR-01-GE-00202North and East Elevations1:200A0
HINK-A2-HR-01-DT-00101Part Elevation Detail1:50A0
Radioactive Waste Storage / Radioactive Waste Process Building
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HQ-00-GA-00101Roof Plan and Elevations1:200A0
HINK-A2-HQ-00-DT-00101Part Elevation Detail1:50A0
Hot Laundry / Hot workshop / Hot warehouse / Facilities for Decontamination / Effluent Tanks / Refuelling Water Storage Tank / Battery Load Bank
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HV-00-GP-02002Roof Plan1:200A1
HINK-A2-HV-00-GE-00102Elevations1:200A1
HINK-A2-HV-00-DT-00102Part Elevation Detail1:50A1
Emergency Diesel Generator – A / Cooling Water Discharge Weir (Building)
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HD-01-GP-04002Roof Plan1:200A1
HINK-A2-HD-01-GE-00102Elevations1:200A1
HINK-A2-HD-01-DT-00102Part Elevation Detail1:50A1
Emergency Diesel Generator – B / Cooling Water Discharge Weir (Building) / Battery Load Bank
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HD-02-GP-04002Roof Plan1:200A1
HINK-A2-HD-02-GE-00102Elevations1:200A1
HINK-A2-HD-02-DT-00102Part Elevation Detail1:50A1
Service Access Building 1
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HGC-00-GA-00101Roof Plan & Elevations1:100A1
Nuclear Island (Unit 2)
Unit 2: Reactor Building / Fuel Building / Fuel Building Hall / Boron Storage / Safeguard Buildings / Nuclear Auxiliary Building / Access Tower / Service Access Building 3
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HR-02-GP-09002Roof Plan1:200A0
HINK-A2-HR-02-GE-00101South and West Elevations1:200A0
HINK-A2-HR-02-GE-00202North and East Elevations1:200A0
HINK-A2-HR-02-DT-00101Part Elevation Detail1:50A0
Radioactive Waste Treatment Building / Battery Load Bank
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HQC-00-GP-04002Roof Plan1:100A1
HINK-A2-HQC-00-GE-00102Elevations1:100A1
HINK-A2-HQC-00-DT-00102Part Elevation Detail1:50A1
Emergency Diesel Generator – C / Cooling Water Discharge Weir (Building)
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HD-03-GP-04002Roof Plan1:200A1
HINK-A2-HD-03-GE-00102Elevations1:200A1
HINK-A2-HD-03-DT-00102Part Elevation Detail1:50A1
Emergency Diesel Generator – D / Cooling Water Discharge Weir (Building)
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HD-04-GP-04002Roof Plan1:200A1
HINK-A2-HD-04-GE-00102Elevations1:200A1
HINK-A2-HD-04-DT-00102Part Elevation Detail1:50A1
Service Access Building 4
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HGB-00-GA-00101Roof Plan & Elevations1:100A1
Conventional Island (Unit 1)
Unit 1: Turbine Hall
Drawing numberRevDrawing titleScalePaper size
HINK-A1-HM-01-GA-00602Roof Plan, North and South Elevations1:200A0
HINK-A1-HM-01-GE-00102West and East Elevations1:200A0
HINK-A1-HM-01-DT-00101Part Elevation Detail1:50A0
Unit 1: Sky Bridges
Drawing numberRevDrawing titleScalePaper size
HINK-A1-BR-01-GP-01001Roof Plan1:100A1
HINK-A1-BR-01-GE-00101North and South Elevations1:100A1
HINK-A1-BR-01-GE-00201East and West Elevations1:100A1
HINK-A1-BR-01-DT-00101Part Elevation Detail1:50A1
Unit 1: Non Classified Electrical Building
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HF-01-GP-03002Roof Plan1:100A1
HINK-A2-HF-01-GE-00102South Elevation1:100A1
HINK-A2-HF-01-GE-00202North and East Elevations1:100A1
HINK-A2-HF-01-DT-00102Part Elevation Detail1:50A1
Unit 1: Gas Insulated Switch Gear / Main Transformer / Unit Transformer / Auxiliary Transformer
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HT-01-GP-00301Roof1:200A1
HINK-A2-HT-01-GE-00101Elevations1:200A1
HINK-A2-HT-01-DT-00101Part Elevation Detail1:50A1
Unit 1: Hydrazine Storage
Drawing numberRevDrawing titleScalePaper size
HINK-A2-SIR-01-GA-00101Roof Plan and Elevations1:100A1
Conventional Island (Unit 2)
Unit 2: Turbine Hall
Drawing numberRevDrawing titleScalePaper size
HINK-A1-HM-02-GA-00602Roof Plan, North and South Elevations1:200A0
HINK-A1-HM-02-GE-00102West and East Elevations1:200A0
HINK-A1-HM-02-DT-00101Part Elevation Detail1:50A0
Unit 2: Sky Bridges
Drawing numberRevDrawing titleScalePaper size
HINK-A1-BR-02-GP-01001Roof Plan1:100A1
HINK-A1-BR-02-GE-00101North and South Elevations1:100A1
HINK-A1-BR-02-GE-00201East and West Elevations1:100A1
HINK-A1-BR-02-DT-00101Part Elevation Detail1:50A1
Unit 2: Non Classified Electrical Building
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HF-02-GP-03002Roof Plan (Lev 10.70m)1:100A1
HINK-A2-HF-02-GE-00102South Elevation1:100A1
HINK-A2-HF-02-GE-00202North and West Elevations1:100A1
HINK-A2-HF-02-DT-00102Part Elevation Detail1:50A1
Unit 2: Gas Insulated Switch Gear / Main Transformer / Unit Transformer / Auxiliary Transformer
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HT-02-GP-00301Roof1:200A1
HINK-A2-HT-02-GE-00101Elevations1:200A1
HINK-A2-HT-02-DT-00101Part Elevation Detail1:50A1
Operations
Operational Service Centre
Drawing numberRevDrawing titleScalePaper size
HINK-A1-HB-00-GP-09001Roof Plan1:200A1
HINK-A1-HB-00-GE-00101North and South Elevations1:200A1
HINK-A1-HB-00-GE-00201East and West Elevations1:200A1
HINK-A1-HB-00-DT-00101Part Elevation Detail1:50A1
Cooling Water Pumphouse and Associated Buildings (Unit 1)
Unit 1: Cooling Water Pumphouse / Forebay / Outfall Pond (Surge Chamber) / Filtering Debris Recovery Pit / Service Access Buildings 5 & 7
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HP-01-GP-03002Roof Plan1:200A0
HINK-A2-HP-01-GE-00102Elevations1:200A0
HINK-A2-HP-01-DT-00102Part Elevation Detail1:50A0
Unit 1: Fire-Fighting Water Building
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HOJ-01-GA-00302Roof Plan and Elevations1:200A1
HINK-A2-HOJ-01-DT-00102Part Elevation Detail1:50A1
Discharge Shaft (Units 1 & 2)
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HCT-00-GA-00101Roof Plan & Elevations1:100A1
Cooling Water Pumphouse and Associated Buildings (Unit 2)
Unit 2: Cooling Water Pumphouse / Forebay / Outfall Pond (Surge Chamber) / Filtering Debris Recovery Pit / Service Access Buildings 6 & 8
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HP-02-GP-03002Roof Plan1:200A0
HINK-A2-HP-02-GE-00102Elevations1:200A0
HINK-A2-HP-02-DT-00102Part Elevation Detail1:50A0
Unit 2: Fire-Fighting Water Building
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HOJ-02-GA-00302Roof Plan and Elevations1:200A1
HINK-A2-HOJ-02-DT-00102Part Elevation Detail1:50A1
Remaining Balance of Plant and Other Plant (Unit 1)
Unit 1: Hydrogen Storage
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HZH-01-GA-00202Roof Plan and Elevations1:100A1
Unit 1: Oxygen Storage
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HZO-01-GA-00201Roof Plan and Elevations1:100A1
Remaining Balance of Plant and Other Plant (Unit 2)
Unit 2: Hydrogen Storage
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HZH-02-GA-00202Roof Plan & Elevations1:100A1
Unit 2: Oxygen Storage
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HZO-02-GA-00201Roof Plan and Elevations1:100A1
Remaining Balance of Plant and Other Plant (Shared Between both Units)
Demineralisation Station
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HY-00-GP-03002Roof Plan1:100A1
HINK-A2-HY-00-GE-00102North and South Elevations1:100A1
HINK-A2-HY-00-GE-00202East and West Elevations1:100A1
HINK-A2-HY-00-DT-00102Part Elevation Detail1:50A1
Auxiliary Boilers
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HVB-00-GA-00401Roof Plan1:100A1
HINK-A2-HVB-00-GE-00101Elevations1:100A1
HINK-A2-HVB-00-DT-00101Part Elevation Detail1:50A1
Chemical Products Storage
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HZC-00-GA-00101Roof Plan and Elevations1:100A1
HINK-A2-HZC-00-DT-00101Part Elevation Detail1:50A1
Sewage Treatment Plant
Drawing numberRevDrawing titleScalePaper size
HINK-A2-STP-00-GA-00101Plans and Elevations1:100A1
Conventional Island Water Storage Tank – A
Drawing numberRevDrawing titleScalePaper size
HINK-A2-SER-01-GA-00201Roof Plan and East Elevation1:200A1
Conventional Island Water Storage Tank – B
Drawing numberRevDrawing titleScalePaper size
HINK-A2-SER-02-GA-00201Roof Plan and East Elevation1:200A1
Nuclear Island Water Storage Tank
Drawing numberRevDrawing titleScalePaper size
HINK-A2-SED-00-GA-00201Roof Plan and South and East Elevations1:100A1
Degassed Water Storage Tanks
Drawing numberRevDrawing titleScalePaper size
HINK-A2-REA-00-GA-00101Roof Plan & Elevations1:200A1
Fuel Waste and Storage
Interim Spent Fuel Store
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HHK-00-GP-00001Plan1:200A0
HINK-A2-HHK-00-GE-00101North and South Elevations1:200A0
HINK-A2-HHK-00-GE-00201East and West Elevations1:200A0
Access Control Building
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HUD-00-GA-00101Plans and Elevations1:100A1
Intermediate Level Waste Interim Storage Facility
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HHI-00-GA-00201Roof Plan and Elevations1:200A0
HINK-A2-HHI-00-DT-00101Part Elevation Detail1:50A0
Ancillary, Office and Storage
Main Access Control Building
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HU-00-GP-01001Roof Plan1:100A1
HINK-A2-HU-00-GE-00101Elevations1:100A1
HINK-A2-HU-00-DT-00101Part Elevation Detail1:50A1
Entry Relay Building
Drawing numberRevDrawing titleScalePaper size
HINK-A2-ERB-00-GA-00201Roof Plan and Elevations1:100A1
HINK-A2-ERB-00-DT-00101Part Elevation Detail1:50A1
Off-site Vehicle Search Area
Drawing numberRevDrawing titleScalePaper size
HINK-A2-VSA-00-GA-00101Roof Plan and Elevations1:50A1
Auxiliary Administration Centre
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HUC-00-GP-02002Roof Plan1:100A1
HINK-A2-HUC-00-GE-00102North and South Elevations1:100A1
HINK-A2-HUC-00-GE-00202East and West Elevations1:100A1
HINK-A2-HUC-00-DT-00102Part Elevation Detail1:50A1
EDF Site Offices
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HAO-00-GE-00102Roof & Elevations1:200A1
HINK-A2-HAO-00-DT-00102Part Elevation Detail1:50A1
Garage for Handling Facilities
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HBG-00-GP-01001Roof Plan1:100A1
HINK-A2-HBG-00-GE-00101Elevations1:100A1
HINK-A2-HBG-00-DT-00101Part Elevation Detail1:50A1
Oil and Grease Storage and Oil Ancillary Building
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HOG-00-GA-00201Roof Plan1:100A1
HINK-A2-HOG-00-GE-00101North and South Elevations1:100A1
HINK-A2-HOG-00-GE-00201East and West Elevations1:100A1
HINK-A2-HOG-00-DT-00101Part Elevation Detail1:50A1
AREVA Warehouse
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HBW-00-GP-01001Roof Plan1:200A1
HINK-A2-HBW-00-GE-00101Elevations1:200A1
HINK-A2-HBW-00-DT-00101Part Elevation Detail1:50A1
Meteorological Station
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HSM-00-GA-00201Roof Plan and Elevations1:50A1
Outage Access Control Building
Drawing numberRevDrawing titleScalePaper size
HINK-A2-TU1-00-GA-00201Roof Plan and Elevations1:100A1
HINK-A2-TU1-00-DT-00101Part Elevation Detail1:50A1
Contaminated Tools Storage
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HHC-01-GA-00202Roof Plan and Elevations1:200A1
HINK-A2-HHC-01-DT-00102Part Elevation Detail1:50A1
Conventional Waste Storage
Drawing numberRevDrawing titleScalePaper size
HINK-A2-CWS-00-GA-00201Roof Plan and Elevations1:200A1
Transit Area for Very Low Level Waste and Low Level Waste
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HHL-00-GE-00101Elevations1:100A1
Raw Water and Potable Water Supply
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HOR-00-GA-00102Roof Plan1:100A0
HINK-A2-HOR-00-GA-00202Elevations1:100A0
HINK-A2-HOR-00-DT-00102Part Elevation Detail1:50A1
Emergency Response Store
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HHE-00-GA-00101Roof Plan & Elevations1:200A1
HINK-A2-HHE-00-DT-00101Part Elevation Detail1:50A1
Services Ventilation Building
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HGM-00-GA-00101Roof Plan & Elevations1:100A1
Public and Training
Simulator Building / Training Centre
Drawing numberRevDrawing titleScalePaper size
HINK-A1-HBS-00-GP-02001Roof Plan1:200A1
HINK-A1-HBS-00-GE-00101Elevations1:200A1
HINK-A1-HBS-00-DT-00101Part Elevation Detail1:50A1
Public Information Centre
Drawing numberRevDrawing titleScalePaper size
HINK-A1-PIC-00-GP-04001Roof Plan1:100A1
HINK-A1-PIC-00-GE-00101North and West Elevations1:100A1
HINK-A1-PIC-00-GE-00201South and East Elevations1:100A1
HINK-A1-PIC-00-DT-00101Part Elevation Detail1:50A1
National Grid Substation
Drawing numberRevDrawing titleScalePaper size
HINK-A2-SS-00-GP-01001Roof Plan1:200A0
HINK-A2-SS-00-GE-00101Elevations1:200A0
HINK-A2-SS-00-DT-00101Part Elevation Detail1:50A0
Other Site Structures
Sea Wall (Incorporating Coastal Footpath)
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HSW-00-GA-00101Plans1:500A0
HINK-A2-HSW-00-GA-00201North Elevation1:50A0
HINK-A2-HSW-00-GA-00301Detail Plans and Elevations1:50A0
HINK-A2-HSW-00-GA-00401Detail Plan and Elevation1:100A0
EDF Energy Pylons
Drawing numberRevDrawing titleScalePaper size
HINK-A1-PL-00-GA-00101Location Plan, Plans, Elevations and AxonometricVariousA1
Highways Plans
Drawing numberRevDrawing titleScalePaper size
HPC-GEN124-RI-RFC-DRW-00004501Northern Roundabout Proposed Layout1:500A1
HPC-GEN124-RI-RFC-DRW-00004601Vehicle Search Area Layby and Turning Head Proposed Layout1:250A1
HPC-GEN124-RI-RFC-DRW-00004701Southern Roundabout Proposed Layout During Operation1:500A1
HPC-GEN124-RI-RFC-DRW-00004801Southern Roundabout Proposed Layout During Construction1:500A1
HPC-GEN124-RI-RFC-DRW-00004901Emergency Access Road Junction with Existing Highway Proposed Layout1:250A1
Site Preparation Plans
Drawing numberRevDrawing titleScalePaper size
HPCSPW002a Rev101Site Layout Plan1:3500A1
HPCSPW002b00Beach Access Road Plan and Cross Sections1:250 / 1:50A1
HPCSPW004 Rev101Planning Application Fencing Arrangement (Sheet 1 of 3)1:3500A1
HPCSPW005 Rev101Fencing Enlarged Detail West (Sheet 2 of 3)1:1500A1
HPCSPW006 Rev101Fencing Enlarged Detail East (Sheet 3 of 3)1:1500A1
HPCSPW007 Rev101Indicative Earthworks Cut and Fill Arrangement1:3500A1
HPCSPW00800Early Works Water Management Zone1:2500A1
HPCSP009 Rev101Surface Water Catchment Area Overall General Arrangement1:3000A1
HPCSPW01000Arrangement of Construction Drainage Outfall to Foreshore1:75A1
HPCSPW011 Rev101Surface Water Drainage Holford Stream Culvert1:1500 / 1:150A1
HPCSPW012a00Deep Water Drainage Arrangement1:2000 / 1:100A1
HPCSPW012b00Deep Water Arrangement Spine Drain Sections A and B1:200A1
HPCSPW012c00Deep Water Assessment Spine Drain Sections C1:200A1
HPCSPW013b00Typical Cross Section Through Haul Road1:50A1
HPCSPW0140011kv Sub Station Plan and Elevations1:100A1
HPCSPW01500Raw Water Reservoir Plans and Sections1:150A1
HPCSPW016 Rev101Surface Water Drainage in the Built Development Areas1:1750A1
HPCSPW01700Site Access Control Arrangement, Floor and Elevation1:50A1
HPCSPW019 Rev101Landscape Proposal Plan1:5000A1
HPCSPW02200Proposed Sewage Treatment Plant – Plans and Sections1:100A1
HPCSPW023a00Existing and Reinstated Ground Level Cross Sections1:2500 / 1:500A1
HPCSPW023b00Earthworks Platforms Cross Sections1:2500 / 1:500A1
HPCSPW025a Rev202Tree and Hedgerow Retention and Removal1:4000A1
HPCSPW025b Rev101Proposed Advanced Planting, Plan1:1000A1
HPCSPW02600Primary and Secondary Access Tracks1:3500A1
HPCSPW02700NW Boundary Mitigation During Construction Cross Sections A and B1:200A1
HPCSPW02800NW Boundary Mitigation During Construction Cross Sections C and D1:200A1
HPCSPW02900NW Boundary Mitigation During Construction Planting Plan1:750A1"

EXPLANATORY NOTE

(This note is not part of the Order)

This Order amends the Hinkley Point C (Nuclear Generating Station) Order 2013 ("the 2013 Order"), a development consent order under the Planning Act 2008, following an application under paragraph 2 of Schedule 6 to that Act for a non-material change to alter service buildings in respect of limited new structures, to provide for the removal, repositioning and alteration to the dimensions of some buildings, to make other minor changes to that consented under the 2013 Order to facilitate safety and better design, and to amend the listed plans in Part 3 of Schedule 1 to the 2013 Order. This Order, in article 6, provides for the certification of revised or substituted plans for use as evidence in any proceedings. The changes to the 2013 Order take effect from the date specified in this Order.

(1)

2008 c. 29. Paragraph 2 was amended by paragraph 4 of Schedule 8 to the Marine and Coastal Access Act 2009 (c. 23), by paragraphs 1 and 72 of Schedule 13 to the Localism Act 2011 (c. 20), and by section 28 of the Infrastructure Act 2015 (c. 7). There are other amendments to the Act that are not relevant to this Order.

(3)

S.I. 2013/648, as amended by S.I. 2013/2938.