BAILII is celebrating 24 years of free online access to the law! Would you consider making a contribution?
No donation is too small. If every visitor before 31 December gives just £5, it will have a significant impact on BAILII's ability to continue providing free access to the law.
Thank you very much for your support!
[Home] [Databases] [World Law] [Multidatabase Search] [Help] [Feedback] | ||
United Kingdom Statutory Instruments |
||
You are here: BAILII >> Databases >> United Kingdom Statutory Instruments >> The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018 No. 413 URL: http://www.bailii.org/uk/legis/num_reg/2018/uksi_2018413_en_1.html |
[New search] [Printable PDF version] [Help]
Statutory Instruments
Infrastructure Planning
Made
23rd March 2018
Coming into force
24th March 2018
An application has been made under paragraph 2 of Schedule 6 to the Planning Act 2008(1) to the Secretary of State in accordance with the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011(2) for a non-material change to the Hinkley Point C (Nuclear Generating Station) Order 2013(3).
The Secretary of State, having considered the application and the responses to the publicity and consultation carried out in accordance with regulations 6 and 7 of the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011, has decided to make this Order amending the Hinkley Point C (Nuclear Generating Station) Order 2013.
The Secretary of State, in exercise of the powers conferred by paragraph 2 of Schedule 6 of the Planning Act 2008, makes the following Order:
1. This Order may be cited as The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018 and shall come into force on 24th March 2018.
2. The Hinkley Point C (Nuclear Generating Station) Order 2013 ("the Order") is amended as follows.
3.-(1) In Part 1 of Schedule 1 to the Order the description of Work No. 1A is amended as follows:
(2) In paragraph (d)(i)-
(a)after "Effluent Tanks" insert "and Refuelling Water Storage Tank";
(b)after "Battery Load Bank;" insert "and";
(c)after "Cooling Water Discharge Weir (Buildings)" omit "and Refuelling Water Storage Tank;".
(3) In paragraph (h)-
(a)after "Service Access Buildings;" omit "and";
(b)in the list below "Service Access Buildings;", insert "Underground Tunnel High Points;"; and
(c)in the list, below "Services Ventilation Building;" insert-
"Back Up Containerised Generators; and
Valve Room for Demineralisation Station."
4.-(1) Part 2 of Schedule 1 to the Order is amended as follows.
(2) In the description of Work No. TJ1 after "elevated roadway" insert "and drainage infrastructure (including pipework and outfalls)".
5.-(1) Part 3 of Schedule 1 to the Order is amended as follows.
(2) For the tables and headings listed under the heading "HPC Development Site", up to the heading "HPC accommodation campus", substitute the list in the Schedule to this Order.
6.-(1) Schedule 2 to the Order is amended as follows.
(2) In the table at paragraph 2-
(a)In sub-paragraph (2) of requirement PW3, for "(Rev 02)" substitute "(Rev 03)";
(3) In the table at paragraph 3-
(a)In sub-paragraph (2) of requirement P10, after "Environmental Statement" insert "and may include pipework attaching to the temporary jetty leading to an outfall at the temporary jetty head," and after "and shall" include "(except in relation to discharge from the temporary jetty head)";
(4) In the table at paragraph 4-
(a)In sub-paragraph (3) of requirement MS4, for "and 1C" substitute ", 1C and TJ1";
(b)After requirement MS17 insert new row-
"MS18 | Back Up Containerised Generators |
(1) Construction of the Back Up Containerised Generators (comprised in Work No. 1A(h)) shall not commence until details of their layout, scale and external appearance have been submitted to and approved by West Somerset District Council. (2) The details referred to in paragraph (1) shall be in accordance with parameter plans HINK-A2-LLY-00-GA-001 (Rev 01); HINK-A2-LLV-00-GA-001 (Rev 01); and HINK-A2-LLW-00-GA-001 (Rev 01). (3) The works shall be carried out in accordance with the approved details. "; |
(c)In sub-paragraph (2) of requirement MS19, for "(Rev 02)" substitute "(Rev 03)"; and
(d)In sub-paragraph (2) of requirement MS21, for "(Rev 02)" substitute "(Rev 03)".
7.-(1) The undertaker shall, as soon as practicable after the making of this Order, submit copies of any revised or substituted plans to the Secretary of State for certification that they are true copies of the plans referred to in this Order.
(2) A plan so certified by the Secretary of State is admissible in any proceedings as evidence of the contents of the document of which it is a copy.
(3) In paragraph (1), the "undertaker" has the same meaning as in article 2(1) of the Order.
Signed on behalf of the Secretary of State for Business, Energy and Industrial Strategy
Gareth Leigh
Head of Energy Infrastructure Planning
Department for Business, Energy and Industrial Strategy
23rd March 2018
Article 5
Site Plans
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A1-SL-00-GA-002 | 03 | HPC Site Parameter Plan | 1:1000 | A0 |
HINK-A1-SL-00-GA-010 | 03 | Site Layout Plan (Operational) | 1:2500 | A1 |
Unit 1: Reactor Building / Fuel Building / Fuel Building Hall / Boron Storage / Safeguard Buildings / Nuclear Auxiliary Building / Access Tower / Service Access Building 2
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HR-01-GP-090 | 03 | Roof Plan | 1:200 | A0 |
HINK-A2-HR-01-GE-001 | 03 | South and West Elevations | 1:200 | A0 |
HINK-A2-HR-01-GE-002 | 03 | North and East Elevations | 1:200 | A0 |
HINK-A2-HR-01-DT-001 | 02 | Part Elevation Detail | 1:50 | A0 |
Radioactive Waste Storage / Radioactive Waste Process Building
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HQ-00-GA-001 | 01 | Roof Plan and Elevations | 1:200 | A0 |
HINK-A2-HQ-00-DT-001 | 01 | Part Elevation Detail | 1:50 | A0 |
Hot Laundry / Hot Workshop / Hot Warehouse / Facilities for Decontamination / Effluent Tanks / Refuelling Water Storage Tank / Battery Load Bank
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HV-00-GP-020 | 03 | Roof Plan | 1:200 | A1 |
HINK-A2-HV-00-GE-001 | 03 | Elevations | 1:200 | A1 |
HINK-A2-HV-00-DT-001 | 03 | Part Elevation Detail | 1:50 | A1 |
Emergency Diesel Generator – A / Cooling Water Discharge Weir Building/ Underground Tunnel Highpoint
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HD-01-GP-040 | 03 | Roof Plan | 1:200 | A1 |
HINK-A2-HD-01-GE-001 | 03 | Elevations | 1:200 | A1 |
HINK-A2-HD-01-DT-001 | 03 | Part Elevation Detail | 1:50 | A1 |
Emergency Diesel Generator – B / Cooling Water Discharge Weir Building / Battery Load Bank
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HD-02-GP-040 | 03 | Roof Plan | 1:200 | A1 |
HINK-A2-HD-02-GE-001 | 03 | Elevations | 1:200 | A1 |
HINK-A2-HD-02-DT-001 | 03 | Part Elevation - Detail | 1:50 | A1 |
Service Access Building 1
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HGC-00-GA-001 | 02 | Roof Plan & Elevations | 1:100 | A1 |
Unit 2: Reactor Building / Fuel Building / Fuel Building Hall / Boron Storage / Safeguard Buildings / Nuclear Auxiliary Building / Access Tower / Service Access Building 3
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HR-02-GP-090 | 03 | Roof Plan | 1:200 | A0 |
HINK-A2-HR-02-GE-001 | 03 | South and West Elevations | 1:200 | A0 |
HINK-A2-HR-02-GE-002 | 03 | North and East Elevations | 1:200 | A0 |
HINK-A2-HR-02-DT-001 | 02 | Part Elevation Detail | 1:50 | A0 |
Radioactive Waste Treatment Building / Battery Load Bank
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HQC-00-GP-040 | 02 | Roof Plan | 1:100 | A1 |
HINK-A2-HQC-00-GE-001 | 02 | Elevations | 1:100 | A1 |
HINK-A2-HQC-00-DT-001 | 02 | Part Elevation Detail | 1:50 | A1 |
Emergency Diesel Generator – C / Cooling Water Discharge Weir Building/ Underground Tunnel Highpoint
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HD-03-GP-040 | 03 | Roof Plan | 1:200 | A1 |
HINK-A2-HD-03-GE-001 | 03 | Elevations | 1:200 | A1 |
HINK-A2-HD-03-DT-001 | 03 | Part Elevation Detail | 1:50 | A1 |
Emergency Diesel Generator – D / Cooling Water Discharge Weir Building/ Battery Load Bank
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HD-04-GP-040 | 03 | Roof Plan | 1:200 | A1 |
HINK-A2-HD-04-GE-001 | 03 | Elevations | 1:200 | A1 |
HINK-A2-HD-04-DT-001 | 03 | Part Elevation Detail | 1:50 | A1 |
Service Access Building 4
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HGB-00-GA-001 | 02 | Roof Plan & Elevations | 1:100 | A1 |
Unit 1: Turbine Hall
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A1-HM-01-GA-006 | 02 | Roof Plan, North and South Elevations | 1:200 | A0 |
HINK-A1-HM-01-GE-001 | 02 | West and East Elevations | 1:200 | A0 |
HINK-A1-HM-01-DT-001 | 01 | Part Elevation Detail | 1:50 | A0 |
Unit 1: Sky Bridges
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A1-BR-01-GP-010 | 01 | Roof Plan | 1:100 | A1 |
HINK-A1-BR-01-GE-001 | 01 | North and South Elevations | 1:100 | A1 |
HINK-A1-BR-01-GE-002 | 01 | East and West Elevations | 1:100 | A1 |
HINK-A1-BR-01-DT-001 | 01 | Part Elevation Detail | 1:50 | A1 |
Unit 1: Non Classified Electrical Building
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HF-01-GP-030 | 02 | Roof Plan | 1:100 | A1 |
HINK-A2-HF-01-GE-001 | 02 | South Elevation | 1:100 | A1 |
HINK-A2-HF-01-GE-002 | 02 | North and East Elevations | 1:100 | A1 |
HINK-A2-HF-01-DT-001 | 02 | Part Elevation Detail | 1:50 | A1 |
Unit 1: Gas Insulated Switch Gear / Main Transformer / Unit Transformer / Auxiliary Transformer
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HT-01-GP-003 | 02 | Roof Plan | 1:200 | A1 |
HINK-A2-HT-01-GE-001 | 02 | Elevations | 1:200 | A1 |
HINK-A2-HT-01-DT-001 | 02 | Part Elevation - Detail | 1:50 | A1 |
Unit 1: Hydrazine Storage
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-SIR-01-GA-001 | 01 | Roof Plan and Elevations | 1:100 | A1 |
Unit 2: Turbine Hall
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A1-HM-02-GA-006 | 02 | Roof Plan, North and South Elevations | 1:200 | A0 |
HINK-A1-HM-02-GE-001 | 02 | West and East Elevations | 1:200 | A0 |
HINK-A1-HM-02-DT-001 | 01 | Part Elevation Detail | 1:50 | A0 |
Unit 2: Sky Bridges
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A1-BR-02-GP-010 | 01 | Roof Plan | 1:100 | A1 |
HINK-A1-BR-02-GE-001 | 01 | North and South Elevations | 1:100 | A1 |
HINK-A1-BR-02-GE-002 | 01 | East and West Elevations | 1:100 | A1 |
HINK-A1-BR-02-DT-001 | 01 | Part Elevation Detail | 1:50 | A1 |
Unit 2: Non Classified Electrical Building
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HF-02-GP-030 | 02 | Roof Plan (Lev 10.70m) | 1:100 | A1 |
HINK-A2-HF-02-GE-001 | 02 | South Elevation | 1:100 | A1 |
HINK-A2-HF-02-GE-002 | 02 | North and West Elevations | 1:100 | A1 |
HINK-A2-HF-02-DT-001 | 02 | Part Elevation Detail | 1:50 | A1 |
Unit 2: Gas Insulated Switch Gear / Main Transformer / Unit Transformer / Auxiliary Transformer
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HT-02-GP-003 | 02 | Roof Plan | 1:200 | A1 |
HINK-A2-HT-02-GE-001 | 02 | Elevations | 1:200 | A1 |
HINK-A2-HT-02-DT-001 | 02 | Part Elevation - Detail | 1:50 | A1 |
Operational Service Centre
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A1-HB-00-GP-090 | 01 | Roof Plan | 1:200 | A1 |
HINK-A1-HB-00-GE-001 | 01 | North and South Elevations | 1:200 | A1 |
HINK-A1-HB-00-GE-002 | 01 | East and West Elevations | 1:200 | A1 |
HINK-A1-HB-00-DT-001 | 01 | Part Elevation Detail | 1:50 | A1 |
Unit 1: Cooling Water Pumphouse / Forebay / Outfall Pond / Service Access Buildings 5 & 7
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HP-01-GP-030 | 03 | Roof Plan | 1:200 | A0 |
HINK-A2-HP-01-GE-001 | 03 | Elevations | 1:200 | A0 |
HINK-A2-HP-01-DT-001 | 03 | Part Elevation - Detail | 1:50 | A0 |
Unit 1: Fire-Fighting Water Building
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HOJ-01-GA-003 | 03 | Roof Plan and Elevations | 1:200 | A1 |
HINK-A2-HOJ-01-DT-001 | 03 | Part Elevation - Detail | 1:50 | A1 |
Discharge Shaft (Units 1 & 2)
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HCT-00-GA-001 | 01 | Roof Plan & Elevations | 1:100 | A1 |
Unit 2: Cooling Water Pumphouse / Forebay / Outfall Pond / Service Access Buildings 6 & 8
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HP-02-GP-030 | 03 | Roof Plan | 1:200 | A0 |
HINK-A2-HP-02-GE-001 | 03 | Elevations | 1:200 | A0 |
HINK-A2-HP-02-DT-001 | 03 | Part Elevation Detail | 1:50 | A0 |
Unit 2: Fire-Fighting Water Building
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HOJ-02-GA-003 | 03 | Roof Plan and Elevations | 1:200 | A1 |
HINK-A2-HOJ-02-DT-001 | 03 | Part Elevation Detail | 1:50 | A1 |
Unit 1: Hydrogen Storage
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HZH-01-GA-002 | 02 | Roof Plan and Elevations | 1:100 | A1 |
Unit 1: Oxygen Storage
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HZO-01-GA-002 | 01 | Roof Plan and Elevations | 1:100 | A1 |
Unit 2: Hydrogen Storage
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HZH-02-GA-002 | 02 | Roof Plan & Elevations | 1:100 | A1 |
Unit 2: Oxygen Storage
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HZO-02-GA-002 | 01 | Roof Plan and Elevations | 1:100 | A1 |
Demineralisation Station
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HY-00-GP-030 | 02 | Roof Plan | 1:100 | A1 |
HINK-A2-HY-00-GE-001 | 02 | North and South Elevations | 1:100 | A1 |
HINK-A2-HY-00-GE-002 | 02 | East and West Elevations | 1:100 | A1 |
HINK-A2-HY-00-DT-001 | 02 | Part Elevation Detail | 1:50 | A1 |
Auxiliary Boilers
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HVB-00-GA-004 | 01 | Roof Plan | 1:100 | A1 |
HINK-A2-HVB-00-GE-001 | 01 | Elevations | 1:100 | A1 |
HINK-A2-HVB-00-DT-001 | 01 | Part Elevation Detail | 1:50 | A1 |
Chemical Products Storage
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HZC-00-GA-001 | 01 | Roof Plan and Elevations | 1:100 | A1 |
HINK-A2-HZC-00-DT-001 | 01 | Part Elevation Detail | 1:50 | A1 |
Sewage Treatment Plant
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-STP-00-GA-001 | 01 | Plans and Elevations | 1:100 | A1 |
Conventional Island Water Storage Tank – A
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-SER-01-GA-002 | 01 | Roof Plan and East Elevation | 1:200 | A1 |
Conventional Island Water Storage Tank – B
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-SER-02-GA-002 | 01 | Roof Plan and East Elevation | 1:200 | A1 |
Nuclear Island Water Storage Tank
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-SED-00-GA-002 | 01 | Roof Plan and South and East Elevations | 1:100 | A1 |
Degassed Water Storage Tanks/ Valve Room
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-REA-00-GA-001 | 02 | Plan and Elevations | 1:200 | A1 |
Interim Spent Fuel Store
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HHK-00-GP-000 | 01 | Plan | 1:200 | A0 |
HINK-A2-HHK-00-GE-001 | 01 | North and South Elevations | 1:200 | A0 |
HINK-A2-HHK-00-GE-002 | 01 | East and West Elevations | 1:200 | A0 |
Access Control Building
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HUD-00-GA-001 | 01 | Plans and Elevations | 1:100 | A1 |
Intermediate Level Waste Interim Storage Facility
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HHI-00-GA-002 | 01 | Roof Plan and Elevations | 1:200 | A0 |
HINK-A2-HHI-00-DT-001 | 01 | Part Elevation Detail | 1:50 | A0 |
Main Access Control Building
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HU-00-GP-010 | 01 | Roof Plan | 1:100 | A1 |
HINK-A2-HU-00-GE-001 | 01 | Elevations | 1:100 | A1 |
HINK-A2-HU-00-DT-001 | 01 | Part Elevation Detail | 1:50 | A1 |
Entry Relay Building
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-ERB-00-GA-002 | 01 | Roof Plan and Elevations | 1:100 | A1 |
HINK-A2-ERB-00-DT-001 | 01 | Part Elevation Detail | 1:50 | A1 |
Off-site Vehicle Search Area
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-VSA-00-GA-001 | 02 | Roof Plan and Elevations | 1:50 | A1 |
Auxiliary Administration Centre
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HUC-00-GP-020 | 03 | Roof Plan | 1:100 | A1 |
HINK-A2-HUC-00-GE-001 | 03 | North and South Elevations | 1:100 | A1 |
HINK-A2-HUC-00-GE-002 | 03 | East and West Elevations | 1:100 | A1 |
HINK-A2-HUC-00-DT-001 | 03 | Part Elevation | 1:50 | A1 |
EDF Site Offices
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HAO-00-GE-001 | 02 | Roof & Elevations | 1:200 | A1 |
HINK-A2-HAO-00-DT-001 | 02 | Part Elevation Detail | 1:50 | A1 |
Garage for Handling Facilities
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HBG-00-GP-010 | 01 | Roof Plan | 1:100 | A1 |
HINK-A2-HBG-00-GE-001 | 01 | Elevations | 1:100 | A1 |
HINK-A2-HBG-00-DT-001 | 01 | Part Elevation Detail | 1:50 | A1 |
Oil and Grease Storage and Oil Ancillary Building
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HOG-00-GA-002 | 01 | Roof Plan | 1:100 | A1 |
HINK-A2-HOG-00-GE-001 | 01 | North and South Elevations | 1:100 | A1 |
HINK-A2-HOG-00-GE-002 | 01 | East and West Elevations | 1:100 | A1 |
HINK-A2-HOG-00-DT-001 | 01 | Part Elevation Detail | 1:50 | A1 |
AREVA Warehouse
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HBW-00-GP-010 | 01 | Roof Plan | 1:200 | A1 |
HINK-A2-HBW-00-GE-001 | 01 | Elevations | 1:200 | A1 |
HINK-A2-HBW-00-DT-001 | 01 | Part Elevation Detail | 1:50 | A1 |
Meteorological Station
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HSM-00-GA-002 | 01 | Roof Plan and Elevations | 1:50 | A1 |
Outage Access Control Building
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-TU1-00-GA-002 | 01 | Roof Plan and Elevations | 1:100 | A1 |
HINK-A2-TU1-00-DT-001 | 01 | Part Elevation Detail | 1:50 | A1 |
Contaminated Tools Storage
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HHC-01-GA-002 | 02 | Roof Plan and Elevations | 1:200 | A1 |
HINK-A2-HHC-01-DT-001 | 02 | Part Elevation Detail | 1:50 | A1 |
Conventional Waste Storage
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-CWS-00-GA-002 | 01 | Roof Plan and Elevations | 1:200 | A1 |
Transit Area for Very Low Level Waste and Low Level Waste
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HHL-00-GE-001 | 01 | Elevations | 1:100 | A1 |
Raw Water and Potable Water Supply
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HOR-00-GA-001 | 02 | Roof Plan | 1:100 | A0 |
HINK-A2-HOR-00-GA-002 | 02 | Elevations | 1:100 | A0 |
HINK-A2-HOR-00-DT-001 | 02 | Part Elevation Detail | 1:50 | A1 |
Emergency Response Store
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HHE-00-GA-001 | 01 | Roof Plan & Elevations | 1:200 | A1 |
HINK-A2-HHE-00-DT-001 | 01 | Part Elevation Detail | 1:50 | A1 |
Services Ventilation Building
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HGM-00-GA-001 | 01 | Roof Plan & Elevations | 1:100 | A1 |
Simulator Building / Training Centre
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A1-HBS-00-GP-020 | 01 | Roof Plan | 1:200 | A1 |
HINK-A1-HBS-00-GE-001 | 01 | Elevations | 1:200 | A1 |
HINK-A1-HBS-00-DT-001 | 01 | Part Elevation Detail | 1:50 | A1 |
Public Information Centre
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A1-PIC-00-GP-040 | 01 | Roof Plan | 1:100 | A1 |
HINK-A1-PIC-00-GE-001 | 01 | North and West Elevations | 1:100 | A1 |
HINK-A1-PIC-00-GE-002 | 01 | South and East Elevations | 1:100 | A1 |
HINK-A1-PIC-00-DT-001 | 01 | Part Elevation Detail | 1:50 | A1 |
National Grid Substation
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-SS-00-GP-010 | 01 | Roof Plan | 1:200 | A0 |
HINK-A2-SS-00-GE-001 | 01 | Elevations | 1:200 | A0 |
HINK-A2-SS-00-DT-001 | 01 | Part Elevation Detail | 1:50 | A0 |
Sea Wall (Incorporating Coastal Footpath)
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-HSW-00-GA-001 | 02 | Plans | 1:500 | A0 |
HINK-A2-HSW-00-GA-002 | 01 | North Elevation | 1:50 | A0 |
HINK-A2-HSW-00-GA-003 | 01 | Detail Plans and Elevations | 1:50 | A0 |
HINK-A2-HSW-00-GA-004 | 02 | Detail Plan and Elevation | 1:100 | A0 |
EDF Energy Pylons
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A1-PL-00-GA-001 | 01 | Location Plan, Plans, Elevations and Axonometric | Various | A1 |
Back Up Power Containerised Generator 1 - Near to the Main Access Building
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-LLY-00-GA-001 | 01 | Plan and Elevations | 1:100 | A1 |
Back Up Power Containerised Generator 2 - Near to the Operational Service Building
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-LLV-00-GA-001 | 01 | Plan and Elevations | 1:100 | A1 |
Back Up Power Containerised Generator 3 – Near to the Areva Warehouse
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HINK-A2-LLW-00-GA-001 | 01 | Plan and Elevations | 1:100 | A1 |
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HPC-GEN124-RI-RFC-DRW-000045 | 01 | Northern Roundabout Proposed Layout | 1:500 | A1 |
HPC-GEN124-RI-RFC-DRW-000046 | 01 | Vehicle Search Area Layby and Turning Head Proposed Layout | 1:250 | A1 |
HPC-GEN124-RI-RFC-DRW-000047 | 01 | Southern Roundabout Proposed Layout During Operation | 1:500 | A1 |
HPC-GEN124-RI-RFC-DRW-000048 | 01 | Southern Roundabout Proposed Layout During Construction | 1:500 | A1 |
HPC-GEN124-RI-RFC-DRW-000049 | 01 | Emergency Access Road Junction with Existing Highway Proposed Layout | 1:250 | A1 |
Drawing number | Rev | Drawing title | Scale | >Paper size |
---|---|---|---|---|
HPCSPW002a Rev1 | 01 | Site Layout Plan | 1:3500 | A1 |
HPCSPW002b | 00 | Beach Access Road Plan and Cross Sections | 1:250 / 1:50 | A1 |
HPCSPW004 Rev1 | 01 | Planning Application Fencing Arrangement (Sheet 1 of 3) | 1:3500 | A1 |
HPCSPW005 Rev1 | 01 | Fencing Enlarged Detail West (Sheet 2 of 3) | 1:1500 | A1 |
HPCSPW006 Rev1 | 01 | Fencing Enlarged Detail East (Sheet 3 of 3) | 1:1500 | A1 |
HPCSPW007 Rev1 | 01 | Indicative Earthworks Cut and Fill Arrangement | 1:3500 | A1 |
HPCSPW008 | 00 | Early Works Water Management Zone | 1:2500 | A1 |
HPCSP009 Rev1 | 01 | Surface Water Catchment Area Overall General Arrangement | 1:3000 | A1 |
HPCSPW010 | 00 | Arrangement of Construction Drainage Outfall to Foreshore | 1:75 | A1 |
HPCSPW011 Rev1 | 01 | Surface Water Drainage Holford Stream Culvert | 1:1500 / 1:150 | A1 |
HPCSPW012a | 00 | Deep Water Drainage Arrangement | 1:2000 / 1:100 | A1 |
HPCSPW012b | 00 | Deep Water Arrangement Spine Drain Sections A and B | 1:200 | A1 |
HPCSPW012c | 00 | Deep Water Assessment Spine Drain Sections C | 1:200 | A1 |
HPCSPW013b | 00 | Typical Cross Section Through Haul Road | 1:50 | A1 |
HPCSPW014 | 00 | 11kv Sub Station Plan and Elevations | 1:100 | A1 |
HPCSPW015 | 00 | Raw Water Reservoir Plans and Sections | 1:150 | A1 |
HPCSPW016 Rev1 | 01 | Surface Water Drainage in the Built Development Areas | 1:1750 | A1 |
HPCSPW017 | 00 | Site Access Control Arrangement, Floor and Elevation | 1:50 | A1 |
HPCSPW019 Rev1 | 01 | Landscape Proposal Plan | 1:5000 | A1 |
HPCSPW022 | 00 | Proposed Sewage Treatment Plant – Plans and Sections | 1:100 | A1 |
HPCSPW023a | 00 | Existing and Reinstated Ground Level Cross Sections | 1:2500 / 1:500 | A1 |
HPCSPW023b | 00 | Earthworks Platforms Cross Sections | 1:2500 / 1:500 | A1 |
HPCSPW025a Rev2 | 02 | Tree and Hedgerow Retention and Removal | 1:4000 | A1 |
HPCSPW025b Rev1 | 01 | Proposed Advanced Planting, Plan | 1:1000 | A1 |
HPCSPW026 | 00 | Primary and Secondary Access Tracks | 1:3500 | A1 |
HPCSPW027 | 00 | NW Boundary Mitigation During Construction Cross Sections A and B | 1:200 | A1 |
HPCSPW028 | 00 | NW Boundary Mitigation During Construction Cross Sections C and D | 1:200 | A1 |
HPCSPW029 | 00 | NW Boundary Mitigation During Construction Planting Plan | 1:750 | A1 |
(This note is not part of the Order)
This Order amends the Hinkley Point C (Nuclear Generating Station) Order 2013 ("the 2013 Order"), a development consent order under the Planning Act 2008 ("the Act"), which has previously been amended by the Hinkley Point C (Nuclear Generating Station) (Correction) Order 2013, the Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 and the Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2017.
This Order follows an application under paragraph 2 of Schedule 6 to the Act for a non-material change to allow an alteration to the alignment of the sea wall and the erection of additional pipework along the underside of the temporary jetty to enable discharges of water from the site. This Order also allows for the redesign and the change in size and location of a number of structures within the Hinkley Point C Permanent Development Site and amends the listed plans in Part 3 of Schedule 1 to the 2013 Order.
This Order, in article 7, provides for the certification of revised or substituted plans for use as evidence in any proceedings.
The changes to the 2013 Order take effect from the date specified in this Order.
2008 c.29. Paragraph 2 of Schedule 6 was amended by paragraph 4 of Schedule 8 to the Marine and Coastal Access Act 2009 (c.23), by paragraphs 1 and 72 of Schedule 13 to the Localism Act 2011 (c.20), and by section 28 of the Infrastructure Act 2015 (c.7). There are other amendments to the Act that are not relevant to this Order.
S.I. 2011/2055. Regulations 6 and 7 were both amended by S.I. 2012/635 and S.I. 2015/760.
S.I. 2013/648, amended by S.I. 2013/2938, S.I. 2015/1666 and S.I. 2017/843.